Loading...
UTS Job 23418 Report 12 Compressive Strength Report - Concrete 06-26-2019 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 97CUBIC YARDS: SET 1 LOCATION:Building 1, GCC holes at 209 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H558 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 51,500 4,100 1 H559 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 65,000 5,170 2 H560 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 94,000 7,480 1 H561 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 92,000 7,320 2 H562 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 95,000 7,560 1 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)72 Truck No.285 Ticket No.891301 Time 7:30 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Building 1, GCC holes at 53 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H563 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 49,000 3,900 2 H564 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 64,000 5,090 1 H565 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 97,000 7,720 1 H566 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 93,500 7,440 2 H567 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 96,500 7,680 1 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)73 Truck No.285 Ticket No.891304 Time 10:10 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Building 1, GCC holes at 49 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H568 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 50,000 3,980 3 H569 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 64,500 5,130 2 H570 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 87,500 6,960 2 H571 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 92,500 7,360 1 H572 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 89,000 7,080 1 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)74 Truck No.285 Ticket No.891307 Time 1:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/28/2019. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:Building 1, GCC holes at 48, 49, 51-53, 81-89, 201, 202, 205, 209, 321, 322, 344, 345, 361- 363 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field X Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019 Report No.12 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment