Loading...
05_C500 Traffic Plan WashingtonSalem 05-09-189-11 Dodge St.,217-219 &231-251Washington St.,Salem, MASHT NO:SHEET NAME:STAMP:REV DESCRIPTION DATEPROJECT INFONORTHDR BY:CHK BY:PROJ NO:DATE:SCALE:APPLICANT:DODGE AREA, LLCc/oOPECHEE CONSTRUCTION CORP.BELMONT, NH 03220603-527-9090PLANTRAFFICC5001"=20'03.14.20182018-005ESDMFEET02040WVDSCROSSWALKS TO BE INSTALLED THAT MEET CITY OF SALEM STANDARD,WHICH IS AN INLAID PRE-FORMED THERMOPLASTIC ASPHALT PAVEMENTMARKING SYSTEM. THE PROPONENT SHALL COORDINATE WITH THE CITYENGINEER IN REGARDS TO THE EXACT SPECIFICATION. THE PROPONENTSHALL COORDINATE WITH THE CITY PLANNER REGARDING THE SPECIFICPATTERN.ALL SIGNAGE RELATED TO PEDESTRIAN RAPID FLASHING BEACONS ONWASHINGTON STREET TO BE INSTALLED AS PART OF MASSWORKS GRANT.SEE INTERSECTION PLAN FOR INFORMATION REGARDING PROPOSEDSIGNAGE, PEDESTRIAN AND TRAFFIC SIGNAL CONFIGURATION FORWASHINGTON STREET INTERSECTION.SEE DETAIL SHEET FOR PROPOSED SIGN SUMMARY1.2.3.4.REVIEW COMMENTS15/9/18