Loading...
BUILDING 4 - FP2-1 NOTE: SPRINKLER HEAD LOCATIONS HAVE NOT FREEZE PROTECTION BEEN COORDINATED WITH CEILING-MOUNTED TYPICAL 2" CPVC MAIN UP FIXTURES OR OTHER POTENTIAL OBSTRUCTIONS. THE BUILDING OWNER IS RESPONSIBLE FOR PROVIDING HEAT IN ALL FROM BELOW (TYPICAL) ACTUAL LOCATIONS OF HEADS SHALL BE AREAS CONTAINING SPRINKLER PIPING AND HEADS TO PREVENT PIPE FIELD-COORDINATED IN ACCORDANCE WITH THE FROM FREEZING. ANYAREAS THAT RAISE CONCERN WITH REGARD TO FREEZING POTENTIAL SHALL BE BROUGHT TO THE ENGINEER'S OBSTRUCTION RULE OF NFPA 13 (2013 EDITION). ATTENTION, IN WRITING, PRIOR TO INSTALLATION. JFP SOLUTIONS, INC. AND THE ENGINEER OF RECORD TAKE NO RESPONSIBILITY FOR DAMAGES CAUSED BY FREEZE-UPS OF THE SPRINKLER SYSTEM. N N 1 -�i SS SECTION 3_812 W : -812 0 r1,1p " Caution: Care should be taken to avoid ',+ ^ compressing the insulation. This reduces its 1 1 R value. To prevent potential freeze—ups of the sprinkler piping, the insulation shouRETANIM ld DN 4-312 4-101 z 8-11 1� be installed tight against the joists. D N INSULATION PROTECTING SPRINKLER 2 MIN. PIPING ON UPPER FLOOR DETAIL II HOLE IN WALL � TO TO 11VAC Q NOT TO SCALE 2 15/1$„ 1 29/32µ PTA RS D WNST IRS I DIA, �` -� WNS AI S Q o 10 u P51 Al R5 PROVIDE RESIDENTIAL SIDEWALL HEADS III MIN_ 112 USING A MAXIMUM SPACING OF 16'x16' 1 ? MAX. 1 112 } 0 3-1a 1 1 REQUIRING A MINIMUM OF 16 GPM @ 13.2 PSI NW Maximum 1- x 1/2- 1-012 8-312 0 5-1 THROUGHOUT THE THIRD LEVEL (TYPICAL) REDUCER N 1 i MIN. A r -� 1/2" OIL /4" DJU Ti I IIEDIT RECESSED HORIZONTAL SIDEWALL 2 3- 0 0 4 1 0-s 8 " s 1-1012N - 1 3-s12 DN N I UP U Q P U 10 UP U P O = N 1 10 N SYSTEM ISOMETRIC DQVN5TA RS TO - 1 6 SCALE: NOT TO SCALE o O N E)OV/NE TA IRS TO 0 2 OWNSTAIRS " UPSTAI " UPSTAIRS " UPSTAIRS I I T T TO DN OOO 12 11"2 " " 1* a 112 1`�2 a'112 112 o -81z 1-10 �'k�l" 2-3 0-1 s 0 2-2 0 2- 12 , SPRINKLER CONTRACTOR SHALL TAKE ® DN " N p 1 112 �t12 �1 2 1 �2 r 1 11 112 11 i '�12 112 1J-2 N " PRECAUTIONS WHEN INSTALLING '31011-412 12 -9120-1 1-s 1-412 -712 0-111 SPRINKLER PIPING IN JOISTS ON TOP N D FLOOR. GENERAL CONTRACTOR SHALL N FO M - I I " M N } n BE REQUIRED TO INSTALL SUFFICIENT ® INSULATION TO MAINTAIN 40-DEGREES rlvac VAC VAC rlv IN ALL AREAS WHERE SPRINKLER PIPING 0-31 z _ 4-2 41 AND HEADS ARE INSTALLED I N I 1-312 0-9 O 7T i THIRD LEVEL SP IN LAYOUT SCALE: %4'1 = 1 '_0'I 1 111 '1 -7 3-1 -11 FO0 0 � SECOND LEVEL SPRINKLER LAYOUT __ N 1 O rt SCALE: @4" = 1 '-0" TO O STAIRS TO Tn OWNSTAIRS OWNSTAIKS O TAI R NOTE: DUE TO THE COMPLEXITY OF THE ROOFLINE, LOCATIONS OF SIDEWALL SPRINKLERS THROUGHOUT THE TOP FLOOR TYPICAL 1%2" CPVC WILL BE ADJUSTED AS NEEDED ONCE FRAMING RISER (VERIFY Calculation results for Design Area 1 — THIRD FLOOR HAS COMPLETED TO MEET THE INSTALLATION LOCATIONS IN-FIELD) This system as shown on VILLAGE FIRE PROTECTION company print no dated 10/15/20 8 REQUIREMENTS OF NFPA 13R. I for PROPOSED MULTI-UNIT RESIDENTIAL BUIL9D MTH MASON ST- BUILDING 4 contract no 380-008 is designed to discharge at a rate of 0.05 gpm/ftz (L/min/m2)of floor area over S1 S3 DN a maximum area of 352 ft2 when supplied with water at a rate of 65.6 qpm at 49.7 psi at the base of the riser. NO SPRINKLER PIPING SHALL BE RUN IN ANY S2 002 _ 004 DN Hose stream allowance of is included in the above. ROOF-JOISTS OR OTHER AREAS OF POTENTIAL 1 Ali-1� — —1 � 7 DN DN Occupancy classification: RES 13R Number of heads flowing: 4 FREEZING. ADDITIONAL FRAMING MAY BE Commodity classification: System Type: Wet REQUIRED IF CEILING SLOPES DO NOT PERMIT a-s 3- 32 - -10 -C 2 1� - 1 fi 1 Maximum storage height: Maximum velocity: 10.87 ft/s o- 2-s 3 91 2-11 Storage arrangement: THE CORRECT INSTALLATION OF SPRINKLER 0- -4 1 312 2-4 -1 3-s1 ?- 4-7 - HEADS IN ACCORDANCE WITH NFPA 13R. Flow from In-Rack sprinklers: 0 gpm Pressure Required at Source: 49.7 psi Flow from Overhead sprinklers: 65.6 gpm Pressure Available at Source: 78.8 psi o Flow from Inside Hoses: 0 gpm Surplus Pressure at Source: 29.1 psi Design Area 1 Wet System O O Flow from Outside Hoses: 0 gpm THIRD FLOOR Other fixed flows: 0 qpm 0� Demand Calculations using Hazen-Williams Method Total flow in system piping: 65.6 gpm Occupancy Classification: RES 13R Additional flow at/beyond source: 100 qpm Design Area Density: 0.05 Total of all flows: 165.6 gpm Additional Outside Hose: 100 �//E:D Design Area Size: 352 Notes: THIS CALCULATION INCLUDES THE HMD 4 RESIDENTIAL SIDEWALLS ON THE THIRD LEVEL DESIGNED BY: REVISIONS HEAD BLOCK SPRINKLER CONTRACTOR SPRINKLER SYSTEM S DATE DESCRIPTION BY �--- Milli MEN NEW AUTOMATIC NFPA 13R SPRINKLER SYSTEM SYM CNT POSITION FINISH TEMP I K NPT MFG. PERMIT SET ]FP SOLUTIONS INC VILLAGE F11RIE PIRIOTECTION FIRE PROTECTION CONSULTING SERVICES BUILDING 4 PERMIT N0. — oJ SON M.C. q@G ® 97 RES PENDENT WHITE 155 5.80 1/2 REL. 86 MILFORD STREET CONTRACT No. 380 008 01 9 SOUTH MASON STREET o KAHAN PX E W P.O. Box 1234 No 5 DRY SIDEWALL WHITE 155 5.60 1/2" REL. APPROVAL SALEM FD FIRE PROTECTION C/, D o.4838 L nnfield Massachusetts 01940 37 RES. SIDEWALL BRASS 155 5.80 1/2" REL. MILFORD, NH 03055 DRAWN BY T. JENKINS Q Y SPRINKCAD SALEM, MASSACHUSETTS 03055 »_ > �,c Telephone: (781) 389-7999 SCALE 1/4 -1 -0 s/ONALE E-Mail: TDJFP 1 @Yahoo.Com CPVC SPRINKLER PIPING (603) 6��_ �?2/?� DATE 10/15/2018 STEEL SPRINKLER PIPING - — — — — — — — — — — — — - V V PROJECT ADDRESS REVISED FP 2 of 2 PLOTTED