UTS Job 22528 Report 28 Compressive Strength Report - Concrete 07-09-2019-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS:
SET 1 LOCATION:SOD at Line 19
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2
M620 4 x 8 12.57 Good 07/09/19 07/23/19 14
M621 4 x 8 12.57 Good 07/09/19 08/06/19 28
M622 4 x 8 12.57 Good 07/09/19 08/06/19 28
M623 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)63
Truck No.233
Ticket No.8373
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD at Line 15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2
M596 4 x 8 12.57 Good 07/09/19 07/23/19 14
M597 4 x 8 12.57 Good 07/09/19 08/06/19 28
M598 4 x 8 12.57 Good 07/09/19 08/06/19 28
M599 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)72
Conc Temp (F)65
Truck No.246
Ticket No.5884
Time 8:50
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD at Line 12
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2
M585 4 x 8 12.57 Good 07/09/19 07/23/19 14
M586 4 x 8 12.57 Good 07/09/19 08/06/19 28
M587 4 x 8 12.57 Good 07/09/19 08/06/19 28
M588 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)6 1/2,6
Air Temp. (F.)74
Conc Temp (F)68
Truck No.253
Ticket No.8398
Time 9:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD at Line 8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2
N640 4 x 8 12.57 Good 07/09/19 07/23/19 14
N641 4 x 8 12.57 Good 07/09/19 08/06/19 28
N642 4 x 8 12.57 Good 07/09/19 08/06/19 28
N643 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7,6 1/2
Air Temp. (F.)76
Conc Temp (F)70
Truck No.202
Ticket No.8404
Time 10:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD at Line 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1
M568 4 x 8 12.57 Good 07/09/19 07/23/19 14
M569 4 x 8 12.57 Good 07/09/19 08/06/19 28
M570 4 x 8 12.57 Good 07/09/19 08/06/19 28
M571 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)77
Conc Temp (F)65
Truck No.244
Ticket No.8420
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:SOD at Line 1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1
M615 4 x 8 12.57 Good 07/09/19 07/23/19 14
M616 4 x 8 12.57 Good 07/09/19 08/06/19 28
M617 4 x 8 12.57 Good 07/09/19 08/06/19 28
M618 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)80
Conc Temp (F)71
Truck No.233
Ticket No.8429
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00-
7:00AM
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Joe Simard No Max Day .5 Hr(s)
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Level 64, Line 19-1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment