UTS Job 22528 Report 28 Compressive Strength Report - Concrete 07-09-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS: SET 1 LOCATION:SOD at Line 19 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2 M620 4 x 8 12.57 Good 07/09/19 07/23/19 14 M621 4 x 8 12.57 Good 07/09/19 08/06/19 28 M622 4 x 8 12.57 Good 07/09/19 08/06/19 28 M623 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)63 Truck No.233 Ticket No.8373 Time 7:00 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOD at Line 15 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2 M596 4 x 8 12.57 Good 07/09/19 07/23/19 14 M597 4 x 8 12.57 Good 07/09/19 08/06/19 28 M598 4 x 8 12.57 Good 07/09/19 08/06/19 28 M599 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)7 Air Temp. (F.)72 Conc Temp (F)65 Truck No.246 Ticket No.5884 Time 8:50 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOD at Line 12 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2 M585 4 x 8 12.57 Good 07/09/19 07/23/19 14 M586 4 x 8 12.57 Good 07/09/19 08/06/19 28 M587 4 x 8 12.57 Good 07/09/19 08/06/19 28 M588 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)6 1/2,6 Air Temp. (F.)74 Conc Temp (F)68 Truck No.253 Ticket No.8398 Time 9:45 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:SOD at Line 8 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2 N640 4 x 8 12.57 Good 07/09/19 07/23/19 14 N641 4 x 8 12.57 Good 07/09/19 08/06/19 28 N642 4 x 8 12.57 Good 07/09/19 08/06/19 28 N643 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)7,6 1/2 Air Temp. (F.)76 Conc Temp (F)70 Truck No.202 Ticket No.8404 Time 10:25 Unit Wt lbs/cu ft Air Content (%) SET 5 LOCATION:SOD at Line 4 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1 M568 4 x 8 12.57 Good 07/09/19 07/23/19 14 M569 4 x 8 12.57 Good 07/09/19 08/06/19 28 M570 4 x 8 12.57 Good 07/09/19 08/06/19 28 M571 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)7 Air Temp. (F.)77 Conc Temp (F)65 Truck No.244 Ticket No.8420 Time 11:40 Unit Wt lbs/cu ft Air Content (%) SET 6 LOCATION:SOD at Line 1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1 M615 4 x 8 12.57 Good 07/09/19 07/23/19 14 M616 4 x 8 12.57 Good 07/09/19 08/06/19 28 M617 4 x 8 12.57 Good 07/09/19 08/06/19 28 M618 4 x 8 12.57 Good 07/09/19 08/06/19 28 Slump (in.)7 Air Temp. (F.)80 Conc Temp (F)71 Truck No.233 Ticket No.8429 Time 1:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00- 7:00AM Inspector Premium Travel Name Time Hours Time Jordan Depina No Max Day .5 Hr(s) Joe Simard No Max Day .5 Hr(s) Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD; Level 64, Line 19-1 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Slump Specification (in.)5-8 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019 Report No.28 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment UTS of Massachusetts, Inc. Page 6 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-09-2019 Report No.28 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment