Loading...
UTS Job 23418 Report 10 Soil Inspection Report 07-11-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-11-2019Soil Inspection Report Report No.10 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Foundation backfilling continued at the western perimeter of building 2 along column line G from 11 - 17 (see sketch). The material used is 2" minus imported processed gravel consisting of F - C gravel, some sand, trace silt. Approximately 12 - 16" thick lifts were placed and graded utilizing the Deere 75G excavator. An access ramp was constructed from column line 12 - 13 @ G. Each lift was compacted employing several passes of coverage utilizing the Wacker ½ ton plate compactor or IR 10 ton drum roller exhibiting stable/firm conditions. Perimeter footing trench excavation continued within the limits of proposed building #2 along column lines G and 8 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were recently completed in this area by installing GCC deep foundation elements. The area was over excavated 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is fill and varies significantly in consistency from organic silt with wood and clay to gravel to tannin bark. A layer of mirafi 160 filter fabric was placed atop the sub grade as specified. Compaction of the sub grade will not be feasible due to the soft organic sub grade soils. A 6" thick layer of ¾" crushed stone was placed and graded. The surface of the stone was compacted utilizing the heavy plate compactor generally exhibiting stable/firm conditions. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-11-2019Soil Inspection Report Report No.10 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-11-2019 Report No.10 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment