Loading...
180 NORTH STREET - BUILDING INSPECTION II2WXlG UPC 10333 No. 153L-3 $bsT HASTINGS, MN r ,l x. 180 N(;,.k 1 BEET — - 768-09 GIs# 4203 COMMONWEALTH OF MASSACHUSETTS Map 27 3i Blnek. CITY OF SALEM Lot 0148 �'� c' Category1 Addition Permit# ;68.09 .. -..F. BUILDING PERMIT Project# JS-2009-001412 Est. Cost: $25,000.00 „ Fee Charged: $180.00 a ' Balanee Due:^ $ 00 "' °`"••'"'. PERMISSION IS HEREBY GRANTED TO: Contractor: License: Expires Use Group: ,. HOMEOWNER r�q.: Lot Size(sq. ft.): 2701.1556 j jOWner: CAMPAGNA PAUL Zoning. R2 ,. UUnits Gamed: a- Applicant: CAMPAGNA PAUL nits Lost. :31 -AT: 180 NORTI[STREET DiSafe#: I err,of ISSUED ON. 13-May-2009 AMENDED ON: EXPIRES ON: 13-Nov-2009 TO PERFORM THE FOLLOWING WORK: CONSTRUCT 2ND STORY ADDITION PER PLANS SUBMITTED POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: peter: Footings::0 �' 1)6/14 f1 Rough: �(1)"c�' 7 t Rough: Rough: Foundation: Final: 41. /:`�y��10� Final: Final: Rough Frame: Fireplace/Chimney: D.P.W. Fir health �rIyF : ice : ' O&O1� v Meer: Oil: Insulation �/ Final:iK-$ 41'c'� R V House# Smoke: Assessor Treasury: Water: Alarm: rr �-�r aZ+ Sewer: Sprinklersv/ C6 Final: k-� CVLI A V� i THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount BUILDING REC-2009-001603 13-May-09 677 $180.00 GeoTMSm 2009 Des Lauriers Municipal Solutions,Inc. \i- s �.coNDtT � o 4'alit rseve •o cid� CITY OF SALEM Certificate No: 768-09 Building Permit No.: 768-09 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the RESIDENCE located at Dwelling Type 180 NORTH STREET in the CITY OF SALEM Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY PERMANENT OCCUPANCY FOR (180 NORTH STREET) This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date ----------------------- Issued On: Mon Apr 5, 2010 ---------- - - - GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. ----------------------------- -------------------------------------------------- .F0 DfTA, CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL t,L�-I`:i1 ll i`I' IC.-E '^ 120 WASHINGTON STREET, 3RD FLOOR qSALEM, MASSACHUSETTS 01970 �p TELEPHONE: 978-745-9595 FAX: 978-740-9846 KIMBERLEY DRISCOLL P I: 2? MAYOR October 2, 2007 Decision City of Salem Zoning Board of Appeals- Petition of Paul Campagna requesting variances from rear setback and side setbacks to construct an addition for the property located at 180 NORTH STREET [R-2]. A public hearing on the above petition was opened on September 19, 2007 pursuant to Mass General Law Ch. 40A, Sec. 11, with the following Zoning Board members present: Robin Stein, Rebecca Curran, Richard Dionne, Bonnie Belair and Steven Pinto. Petitioner seeks variances pursuant to Section 9-5 from rear and side setbacks to construct and addition for the property located at 180 North Street. The Board of Appeal, after careful consideration of the evidence presented at the public hearing, and after thorough review of the plans and petition submitted, makes the following findings of fact: 1. Paul Campagna, petitioner, presented the petition for the property he owns at 180 North Street in the R-2 Zoning District. 2. Petitioner proposes to remove the existing garage, and construct an addition which would extend out 10' from the rear of the residence. 3. Ward 6 Councilor Paul Prevey spoke in favor of the petition. Letters from abutters Nick Michaud (5 Liberty Hill Ave), and Laurie Bersani (182/184 North Street) were received. The letters stated that these abutters had no objections to the proposed addition. On the basis of the above findings of fact and all evidence presented at the public hearing including, but not limited to, the Plans, Documents and testimony, the Zoning Board of Appeals concludes as follows: 1. ` The petitioner may vary the terms of the Residential Two-Family Zoning District to enable the proposed development., which development is consistent with the intent and purpose of the City of Salem Zoning Ordinance. 2. In permitting such change, the Board of Appeals requires certain appropriate conditions and safeguards as noted below. 1, r 2 In consideration of the above, the Salem Board of Appeals voted, five (5) in favor(Stein, Pinto, Belair, Dionne, and Curran) none (0) opposed, to grant petitioner's requests for a variance and special permit subject to the following terms, conditions, and safeguards: 1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of new construction shall be in harmony with the existing structure. 6. A Certificate of Occupancy is to be obtained. 7. Petitioner shall obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 8. Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s) located on the subject property to an extent of more than fifty percent (50%) of its floor area of more than fifty percent(50%) of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent -- of more than fifty percent(501/o) of its replacement cost or more-than fifty percent (50%) of its floor area at the time of destruction, it shall not be reconstructed except in conformity with the provisions of the Ordinance. Robin Stein, Chair Salem Zoning Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision,if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A,Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds.