UTS Job 23418 Report 5 Reinforcing Steel Report 07-09-2019-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Reinforcing Steel Report
Report No.5
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
CONTACT:Bob Levesque
TIME OF INSPECTION:11:00 AM
TIME OF CONCRETE PLACEMENT:1:00 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:S0.1, S2.0, S4.1, S4.2
REVISION NUMBER:DATED:02-10-19
SHOP DRAWING(S):R1, R3, R4
PROJECT SPECIFICATIONS:03300
OTHER:
xDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Walls; Building #2: Column Line G.2 at 19, G at 11
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
M. Chace No
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Reinforcing Steel Report
Report No.5
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Riley Bourque
UTS Matt Chace