BERTRAM FIELD FOLDER CITY OF SALEM, MASSACHUSETTS
INSPECTIONAL SERVICES DEPARTMENT
` THONLA S ST.PIERRE
INSPECTIONAL SERVICES DIRECTOR/BUILDING COMMISSIONER
KIMBERLEY DRISCOLL
MAYOR
98 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970
TEL:978-745-9595♦FAX:978-740-9846
July 17,2019
J.Michael Sullivan
Beacon Architectural Associates
145 South Street
Boston,Massachusetts 02111
RE: 01 Powder House Lane,Bertram Field,Bertuccio Avenue Accessible Entry
Mr. Sullivan,
After review of the drawings supplied to our Department by your office.The pedestrian entry off of
Bertuccio Avenue will be required to be an accessible entry.The solution as shown on you drawing
A-002,presently noted as Alternate#1,an Architectural Access Board(AAB)accessible ramp from
Bertuccio Avenue would be an acceptable solution for compliance.
It is unclear on the drawing but if this was the route of accessible entry off Bertuccio Avenue,an AAB
compliant walk way would need to be installed to connect the ramp to the hatched walkway you show at
the field/fence perimeter.
If you have any further question please call my office at 978-619-5640.
Resp=tfu�lly/b `
Thomas St. Pierre
Building Commissioner
Cc: file