Loading...
BERTRAM FIELD FOLDER CITY OF SALEM, MASSACHUSETTS INSPECTIONAL SERVICES DEPARTMENT ` THONLA S ST.PIERRE INSPECTIONAL SERVICES DIRECTOR/BUILDING COMMISSIONER KIMBERLEY DRISCOLL MAYOR 98 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970 TEL:978-745-9595♦FAX:978-740-9846 July 17,2019 J.Michael Sullivan Beacon Architectural Associates 145 South Street Boston,Massachusetts 02111 RE: 01 Powder House Lane,Bertram Field,Bertuccio Avenue Accessible Entry Mr. Sullivan, After review of the drawings supplied to our Department by your office.The pedestrian entry off of Bertuccio Avenue will be required to be an accessible entry.The solution as shown on you drawing A-002,presently noted as Alternate#1,an Architectural Access Board(AAB)accessible ramp from Bertuccio Avenue would be an acceptable solution for compliance. It is unclear on the drawing but if this was the route of accessible entry off Bertuccio Avenue,an AAB compliant walk way would need to be installed to connect the ramp to the hatched walkway you show at the field/fence perimeter. If you have any further question please call my office at 978-619-5640. Resp=tfu�lly/b ` Thomas St. Pierre Building Commissioner Cc: file