0074 MOFFATT ROAD - BUILDING JACKET SuperTabs 00 90%Lc4artab#JAreo /// I 5MEAD KEEPING YOU ORGANIZED No. 10301 PAMPOMM Ate® mom WrDEWpS1 GET ORGAN VFII AT SMEAD.COM Tom Petersen Architects Planners Mr.Thomas J. St. Pierre,Inspectional Services Director March 30, 2013 City of Salem Inspectional Services 120 Washington Street, 3`d floor Salem, MA 01970 Re: Solar Panel Installation Dibble Residence 74 Moffatt Road Salem,MA 01970 Permit 9628-13 Hi Tom, I've reviewed the solar panel installation at this location to evaluate compliance with the original structural review letter(dated April 27,2012,copy attached)and the manufacturer's specifications for assembly and installation. , . o , The actual installation complies with the original design intent and parameters as well as specifications and instructions set forth by the manufacturer of the panels and rack system. I therefore approve the installation. Please let me know if you have any questions on this information. Thanks! _-( in e�rellya-yours, ,�oRED ARC F. PFT Tom Petersen o� �Pa o N0.31621 IT y HOWELL, a Cc: " kelcy Pegler,Roof Diagnostics oyh NJ any �9�TN OF MAS 6 Country Lane•Howell,New Jersey 07731 •Telephone 732-730-1763,Fax 732-730-1783 ti Tom Petersen Architects Planners Mr.Thomas J. St.Pierre,Inspectional Services Director April 27,2012 City of Salem Inspectional Services 120 Washington Street, 3`d floor Salem,MA 01970 Re: Solar Panel Installation Dibble Residence 74 Moffatt Road Salem,MA 01970 Hi Tom, I've reviewed the proposed solar panel installation at this location to evaluate the existing roof structure and the connection of the panels to the roof. Criteria: Applicable codes: 8d'Edition Residential Code(2009 International Residential Code with Massachusetts Amendments) 2001 Wood Frame Construction Manual Design roof load: 40 psf live load, 15 psf dead load, 55 psf total load Design wind load: 110 mph,35 psf My findings are as follows. 1. The new solar panels will imply an additional dead load of 3 psf. The existing roof structure (wood roof trusses @ 16"o.c.,with 2x4 chords and rafters,+/- 11'-8"span) is sufficient to bear this additional load. 2. The solar panels are attached to the roof with the SolarMount-1 rack system by UNIRAC. The rack system, roof connections and connection spacing are rated for 110 mph. This project requires the larger Solar Mount 1-2.5 beam(2.5"high)and spacing of flange foot connection to roof at 48"o.c. maximum.Flange footing connections to the rail are not required to be staggered. The flange foot connections to the roof are 3/8"diameter x 4"long lag bolts. I therefore certify that this installation complies with the applicable codes and design loads mentioned above and is acceptable for approval. Please let me know if you have any questions on this information. Thanks! aED ARCy' T ours, .5 y V. PeiF FC m n r N0.31621 Z F a HOWELL, y Tom Petersen ;oy HJ os gtrH OF 0 P Cc: Kelcy Pegler, Roof Diagnostics 6 Country Lane•Howell,New Jersey 07731 •Telephone 732-730-1763,Fax 732-730-1783