Loading...
6 MEMORIAL DRIVE - BUILDING INSPECTION mJf[ a-1 YorIv apendaflor 74520 4VOR City of Salem, Massachusetts rp Fire Department 48 Lafayette Street Rg6ert X11 Turner Salem, Massachusetts 01970-3695 Fire Prevention Chief 'Tel978-744-1235 Bureau 978-744-6990 FaX 978-745-4646 978-745-7777 SALEM FIRE PREVENTION ANNUAL INSPECTION OF AFTER SCHOOL DAY CARE IN ACCORDANCE WITH THE REQUIREMENTS OF MASSACHUSETTS GENERAL LAWS, CHAPTER 148, SECTION 4, THE CAMP FIRE OF NORTH SHORE Name of Day Care LOCATED AT: 6 MEMORIAL DRIVE WAS INSPECTED ON MARCH 7, 2000 BY LT. CHARLES LATULIPPE REPORT OF INSPECTION: PASSED APPROVED: XXX J ✓/J' D I S APROV ED: SIGNITURE / V / DATE: &'LG TITLE CC: BOARD OF HEALTH BUILDING DEPT. PLACE OF ASSEMBLY FILE FORM 35A 3/2000 COM !ONNEA-LiH OF "_'1SSACHUS= Q� ?�cc CITY OF SAI.E_'f APPLICATION FOR Ct-7TIFICATE OF INSPECTION Date (4 IS /qtY Fee Required S y0 ( ) No Fee Reaulred in accordance with the provisions of the Massacbusetrs State Building Code, Sc 108. 15. i hereoy apply for a Certificate of Inspection for the below-named premise located ac the following address: 11 1� Street 6 Number 6 {�,¢NYlOvi r•-Y D12A V-C- �'ig7,En,1 MI4 Name of Premises L�� Sc-" Purpose for which Premises is used AA.w4c'4-0- QLX4 [D-1 License(s) or Permic(s) required for the premises by ocher Governmental Agencies: n- License or Permit Acencv 4W l ul n-h I GP.niR,G� 'o•7 S 'I- jl -i r.� C Certificate to co be issued to: !�Ms - 6fid c lu-6 Address: Owner of Record of Building: Ct (frrut-" Address: Nae of Present Holder of Certificate: Nae of Agent. if any. . . ec �1r�.1,TDr� Signature oc Person c wom ert- Zicate TITLE iS issued or hisi her au tri=ed aeenr b I ( )a f- Date INSTRUCTIONS: Day, time phone I -7t(N -0 I,- I. Make check payable cc: The City of Salem 2. Return this applicaciou with your check to: Insveccor of Budldin¢s. Ciry of Sales Buildine Devartment. One Saler Green. Salem. MA. 01970. PI.FASE NOTE: 1. Application form with required fee must be submitted for each building or strucru. of part thereof to be certified. 2. Application 6 fee must be received before the certificate will be issued. J. The building official shall be notified within cen (10) days of any change in the ahave iniormarion. CE8=IFICATE 1- ^7/- l a EVIRATION DATE: PERIODIC INSPECTION REPORT This form is to be completed each time a Periodic Inspection is made. At the time a new Certificate of Inspection is issued, a notation indicating that the fee has been paid will be made to Application Form prior to the new Certificate of Inspection being issued. Any changes since the last inspection are to be added to the file card of the premises. Street 6 Number Name of Premises Certificate to be issued to: Address {�Cf +r.o✓r"/�� /fj i h Owner of Record of Buildingu-- Address Purpose for which premises are used Changes since last Inspection (required on file card also) 1. 2. 3. 4. 5. Date Order Issued: Order Issued To: Address Date Violations Corrected: REMARKS: I have this day inspected the above premises, and the same conforms to the pertinent requirements of the Massachusetts State Building Code and the rules and regulations pursuant thereto. 'Date Buil ing Official Certificate 7� `O Date Issued: Date Expires: A �5 Recommended Next Inspection: � � Tommonmrttlt4 of ttottttr nttr CITY/TOWN OF _ j In accordance with the Massachusetts State Building Code, Section 108. 15, this CERTIFICATE OF INSPECTION isissued to . . . . �oy.s. . t . . .�:/ `•f. . . . . G��``6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ]I TerfitU //that I have inspected the. . . . . . . . . . . .known as. . . located at. . . . .K7. . . .ei'? o 'F ,•{.�. . .d✓i✓F. . . . .in the. . ."I of. . . . .5 �-� k . . . . . . . . . . . . . . . . . . . . . . . . County of. . . . . . . . . . . . . . . . . Commonwealth of Massachusetts. The means of egress are sufficient for the following number of persons: BY STORY Story Capacity Story Capacity Story Capacity Story Capacity BY PLACE OF ASSEMBLY OR STRUCTURE Place of Assembly Place of Assembly or Structure Capacity _ Location . , or Structure Capacity Location 7 / - W ;? Certificate Number Date Certificate Issued Date Certificate Expires Building Official The building official shall be notified within (10) days of any changes in the above information. X4f Tamnwnwralt4 of SHOOROunrio W d CITY OF SALEM -. In accordance . with the Massachusetts State Building Code, Section 108. 15, this WM ee �e CERTIFICATE OF INSPECTION is issued to ...... ._ 7 Ylp �l� that 1 have inspected the premises known as located at 4r.7u�}r=; 'I(!12i ,1 . r)F' l ; . . in the city of Salem County of Essex Commonwealth of Massachusetts. The means of egress are sufficient for the following number of persons: BYSTORY Story Capac'ityf'" �" �� "�S'tro Fyrt' �' .Capacity Story Capa i %� y '% '� p y 7Y�Y;S::r t%xyyNXsti.% 7• traY ,K`,(.%96 Ca acit BY PLACE OF ASSEMBLY OR STRUCTURE Place of Assembly Place of Assembly or Structure Capacity Location or Structure Capacity Location tl;:.I?CGCn ' Ce r ti f i ca to Number Date Certificate Issued Date Certificate Expires Building Official The building official shall be notified within (10) days of any changes in the above information. �\ �t �� Titg of *tt1Pm, mttoottr4usetto Joublic fropertg Department �Q Guilbing Department (One e3alem Green 508-745-9595 EM. 380 Leo E. Tremblay Director of Public Property Inspector of Building October 31, 1994 Zoning Enforcement Officer Laurant Callahan Bentley School 21 Memorial Drive Salem, Mass. 01970 RE: Shed Dear Mr. Callahan: Last year this departmment gave permission to construct a shed in the cafeteria area to be utilized for educating your pupils on-the sale of materials and banking procedures. At the time of construction I gave specifics to the teacher in charge of this project. Up to this date they have ignored them. After speaking with with you on October 31, 1994 you assured me they would meet our requirements. 1. Two fire extinquishers to be installed, one on each side of structure. 2. Fire retardant paint was to be used on exterior of structure. 3. Remove all tables within (10) ten feet of structure. 4. Fire retardant sheet rock to be used on interior walls. 5. Interior paint to be fire retardant. 6. Roof of structure also to be fire retardant paint. If these specifics are not met within (15) fifteen days I will have to ask Mr. L'Heureux, Director of Building Service to remove it. Thank you in advance for your anticipated cooperation in this matter. Please contact my office when work is completed. Sincerely, J Leo E. Tremblay Inspector of Buildings LET: scm cc: Dave Shea Norman LaPointe Councillor Ahmed, Ward 1 Certified Mail # P 921 991 627 U I —'..�*" • ARTICLE rr uNEi• r -NUMBER —— Laurent Callahan Bentley 30041 1 „ 24 Memorial Drive Salem, Mass. 01970 i. . V, r WALZ t FOLD AT PERFORATION t 'r PF INSERT IN STANDARD#10 WINDOW ENVELOPE. a i I F I F M d F t' 1E w SENDER: Complete I also wish to receive the items 1 and/or 2 for additional services. • complete items 3,and ya a b. following services(for an extra fee): • Print your name antl a dress on the reverse of this form so that we can return this card to you. 1. ❑ Addressee's Address • Attach this form to the front of the mailpiece,or on the back it space does not permit. • Write'Return Receipt Requested"on the mailpiece below the article number. 2. ❑ Restricted Delivery • The Return Receipt Fee will provide you the signature of the person delivered to and the date of delive Consult postmaster OStmastef for fee. 3.Article Addressed to: 4a.Article Number Leurant Callahan P 921 991 627 Bentley School 4b.Service Type 21 Memorial Drive Sali C1a30. 019'711 CERTIFIED 7.Dat of Deliver 5.Signature—(Addressee) 8.Addressee's Address (ONLY if requested and fee paid.) .Signature—(Agent) PS Form 3811,November 1990 DOMESTIC RETURN RECEIPT � United States Postal Service Official Business PENALTY FOR PRIVATE USE,$soa INSPECTOR OF BUILDINGS ONE SALEM GREEN SALEM MA 01970-5724 BENTLEY SCHOOL AND EARLY CHILDHOOD CENTER fir( , 25 Memorial Drive Salem, MA 01970 cry t4 - 't',3r - 508 740-1260 Fax 740-1164 Dr. Lawrence L. Callahan Principal V4X March 6, 1995 r Community Leader; We cordially invite you to join the Bentley School and the Early Childhood Center in celebrating `rational Library Week on Tbursday. April 6, 1�)1)5 Enclosed is a description of our program designed Lo introduce the importance of reading to childi'erl, if you can spare approximately one halt hour of your time to come to a clan ronin and read, �.e are sure you "jould find it to be a mutually enriching experience. To become a Community Reader and to schedule a time: please call `40-1 181 between 8.30 AM and 2:301 PM, Sincerely, Marsha Feffer, program Coordinator Bentley School/Early Childhood Center MF/pr P i . ; ; ; ! , J L tj Lj U; T ;fill R program designed to introduce the importance of reading to preschool and elementary aged children. Community Readers began at the Salem Early Childhood Center in 1992 to enhance the classroom libraries as well as bring community and ciulc leaders into the classroom. This year we have eHpanded to include the entire Bentley School. In the younger grades Community Readers are Invited to bring in their favorite childhood book and share it with the class. The book is then donated to the class library. In the older grades Community Readers are invited to, bring a chapter book, or a book in which you have a special interest. You may share I a chapter or two with the class, then donate the book and have the teacher read the remainder with his/her class. The book will then be donated to the (school or class) library. RII books receive a special bookplate inscribed with the Community Reader's name and are cherished for years to come. The Bentley School and the Early Childhood Center have both English and Spanish speaking classes. "Take time to read . . . it Is the fountain of wisdom." (anonymous) T11I1tritDnwtal#4 of Asfi= Uottb d CITY OF SALEM y In accordance with the Massachusetts State Building Code, Section 108. 15, this Y V CERTIFICATE OF INSPECTION is issued to t C. F. D. NORTH SHORE HEAD START 7 (Urfifo that 1 have inspected the premises known as BENTLEY SCHOOL - located at 0006 MEMORIAL DRIVE in the city of Salem County of Essex Commonwealth of Massachusetts. The means of egress are sufficient for the following number of persons: BY STORY Story Cad�t'rt4%%%%%% IS %%% Capacity Story Capacity BY PLACE OF ASSEMBLY OR STRUCTURE Place of Assembly Place of Assembly or Structure Capacity Location or Structure Capacity Location ROOM #109 20 IST FLOOR 0191 —tgg7 07/01 /1997 07/01/199& Certificate Number Date Certificate Issued Date Certificate Expires Building (ficial The building official shall be notified within (10) days of any changes in the above information. w � � ° Titu of tWem, massac4usetts Public Propertq Department Nuilbing Department (One Belem (6reen 508-745-9595 Ext. 300 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer April 11, 1994 Arlene Dannenberg, Principal Bentley School Salem, MA 01970 Dear Ms. Dannenberg: An inspection of the Bentley School was conducted on April 6, 1994 by this department. The major safety devices such as the fire alarm, emergency generator, emergency signs, emergency egresses and corridors were all found to be in excellent condition. However, we did find a few violations that need to be attended to, they are as follows: The hot water temperature in the C wing bathrooms must be lowered to no more than 110 degrees F. Wood wedges cannot be used at classroom doors and fire doors, doors must remain closed at all times. Fire exit sign at classroom 107 is not working. All art work and other papers that are hanging in rooms must be kept at a minimum. Quite a number of classrooms are overdoing hanging of paperwork turned in by the students. You have received a directive from Mr. LaPointe the Fire Inspector on this matter and we would appreciate your advising your teachers. Also, keep corridors free from art work, paper work should be confined to bulletin boards only. If you have any questions please do not hesitate to call otherwise, would you please contact me when all the above violations have been corrected. I thank you for your anticipated cooperation and prompt attention in this matter. Sinc ely, Leo E. Tremblay Inspector of Buildings LET:bms cc: Paul LeRoux Councillor Harvey, Ward 2 \bntly\ P �)LoombsElectric)'11c Vecvica! Co,Ir-1auors for Business and rndOsuy 279 Cambr(dp Sow. t617) 2734002 BudingWn, MA 01803 :308) 667-8200 .-.; . T.L.T. Construction Corporation 1-10-91 200 Broadway Suite 306 Lynnfield, Ma 01940 g: Attn: Joe Bondi RE : Bentley Elementary .Sohool Joe, This letter is to document the conversation that occurred at the meatina, yesterday, regarding the possibility of methane gas infiltration it the crawl space area of the project. The information received from the Architect ; , ' indicated that an exhaust system will be requir®d by the ;r D.B.P. because of the possibility that methane gam could be trapped in the crawl space. I indicated that the wiring ` method that has been utilized and approved to date was not consistent with grir+rig methods s0hich would need to be utilized for a hazardous location as described by Article 500 of the Mase Electrical Code. In all cases, now that S.C. Coombs Electric has been notified that a p9tentiA3 problem exists, we can not proceed nor energize any electrical circuits which exist in the crawl space area. This obviously will impact, the circuits necessary to energize the old and the new building. The schedule proposed by the contract' documents will also be adversely affected. Please note that very early in the project I entertained the idea that gas infiltration in similar crawl space areas was not uncommors. It was noted by the Architect .that a gas hazard was not a consideration atthis partioulaLr Bite. The A-rchitect indicated that the orig al statement is consistent with :current conditions, but no samples of the crawl space had been obtalned as of this date. ' In light of the revelations divulged at yesterdays meeting,S.C. Coombs Electric can not proceed without direction. The potential legality and hazard issues regarding this problem are much more than S.G. Coombe Electric could possibly entertain. please requ®et direction from the Arehsi- toot, iia writing, at your earliest convenience. respectful��y Gene HubarQ�L �" Operations Manager S.C." Coombs ElectricM,t, o. no PRuE . 002 '_.- TLT CONSTRUCTION CORP. July 11, 1991 Earl R. Pianaburgh & Associates, Inc. 77 North Washington Street Boston, Mal 02114 Attention: Hagai Dvir Re: Additions and Renovations to the Bentley Elementary School Salem, MA Gentlemen: Enclosed find correspondence from S. C. Coombs Electric, Inc. concerning discussions which were held at our project meeting on July 9, 1992 regarding the possibility of methane gas build up in the crawl space. Please be advised that it is imperative that this issue be resolved immediately. . The consequence of the enclosed and those which are being requested by the Department of Environmental Protection could have devastating consequences on this project, both monetarily and completion wise. Your firm must give an answer regarding this issue. As stated before, our schedule calls for permanent power to be energized or. July 13, 1991 which is imperative in keeping this project on schedule. very truly yours, TI.T CONSTRUCTION CORP. Joseph Bondi Project Manager SB/emf cc: David Soars$ Beth Debski enclosure 200 BROADWAY • SUITE 306 • LY'1I TMI). MA 01940 • (617)392-0081 • FAX(617)59$8680 JUL 11 ' 91 13 : 48 PAGE . 001 g7o 1�e�ai�ri�erzb of'�izuu�os�,���taL�i�ote�t.�o� ✓feti abo/l Av&vL - Ao.& eadb gyio� 6 Commonwealt./L ./&me �,) wl Daniel S. Greenbaum `vim' Jfamad 01(901 Commissioner (617) 935-2160 March 26, 1991 City of Salem RE: SALEM/Solid Wastes Planning Department Re-Use of on Side Material O-e Salem, Gre^-n Bentley School Extension Salem, MA 01970 NESW-91-009 Attn: William E. Luster Gentlemen: .. ... . The Metropolitan Boston/Northeast Region of the Department of Environmental Protection, Division of Solid Waste Management has received a request for approval to re-use the material that was generated during excavation activities associated with the construction of the Bentley Elementary School Extension, Salem, MA. This request was submitted in accordance with 310 CMR 19. 130 (32) " Disruption of Landfill Areas " and 310 CMR 19. 143 (1) " Post- Closure Use of Landfill" . It is proposed to regrade a small berm constructed of the excavate along Memorial Drive and to spread a thin lift of the excavate over the school 's athletic playing field. This material will then be covered with 18 inches of clean soil. Based upon the results of chemical analysis performed under the direction of the Waste Site Cleanup, the excavated soil was observed to contain low levels of petroleum hydrocarbons (less than 480 mg/kg) . The excavate was originally disposed of as part of the operation of the former City of Salem municipal landfill. The LF was closed for the receipt of refuse in the early 1940 's. 310 CMR 19. 143 (2) requires approval for the project. Original Printed on Recycled Paper Bentley School Pg. 2 In reviewing the request for a change in use of a landfill, the Department takes (3) three criteria into consideration: a) the effect the new use will have on any "cap" placed on the landfill as part of a past closure. b) the degree to which the project owner and designer have considered the need to protect structures from the accumulation of methane. C) the relationship of the proposed use to other post closure uses occurring on the landfill. In reviewing your proposal the Department notes: 1) the landfill was abandoned prior to the adoption of regulations in 1971 controlling landfill closures. 2) the project as proposed will not involve the receipt of solid waste materials from outside of the former City of Salem municipal landfill. The excavate is being relocated within the landfill site. It is the Department's determination that the proposed project does not entail the re-opening of the former City of Salem municipal landfill and thus does not constitute the operation of a solid waste disposal facility as defined by 310 CMR 19.000. The Department therefore in accordance with 310 CMR 19. 130(32) and 19. 143 (2) , hereby approves the City of Salem Planning Department's proposal to utilize the excavate for regrading the site subject to the following conditions: 1) Within 60 days from the receipt of this approval the City of Salem Planning Department shall comply with 310 CMR 19. 143 (4 xbL-! Post Closure Construction " by submitting to this Department detailed plans prepared by a Registered Professional Engineer for the proposed construction of the school building extension, showing techniques used to prevent accumulation of gas within the structure. Bentley School Page 3 . 2) In the event any further expansion of the Bentley Elementary School facilities are planned, the Department shall be notified at least 120 days prior to the planned start of construction and such plans as the Department determines to be necessary shall be submitted to facilitate the Department' s review and approval of the proposed alterations to the former landfill. In accordance with 310 CMR 19 . 016 the Department hereby approves the City of Salem's proposal to convert a portion of the former landfill to an athletic playing field. Upon receipt of this approval the City shall record with the Registry of Deeds, or if the land is a registered land, with the Land Court Section of the Registry for the district in which it lies, notice of its issuance. Further the City shall record with the Registry of Deeds, or Land Court, as applicable, notice that this site was formerly utilized as a landfill for the disposal of solid waste. That notice must be done in accordance with the provisions of 310 CMR 19. 141 "Record Notice of Landfill Operation" . NOTICE OF RIGHT TO APPEAL The City of Salem (the "City") is hereby notified that it may within twenty-one (21) days file a request that this decision be deemed a provisional decision under 310 CMR 19.037 (4) (a) , by submitting a written statement of the basis on which The City believes it is aggrieved, together with any supporting materials. Upon timely filing of such a request, the decision shall be deemed a provisional decision with an effective date twenty-one (21) days after the Department's receipt of the request. Such a request shall reopen the administrative record, and the Department may rescind, supplement, modify, or reaffirm its decision. Failure by The City to exercise the right provided in this section shall constitute a waiver of The City's right to appeal. Appeal. Any person aggrieved by the issuance of this permit, except as provided for under 310 CMR 19. 037 (4) (b) , may file an appeal for judicial review of said decision in accordance with the provisions of M.G.L. c. 111, s. 150A, and M.G.L. c. 30A, not later than thirty (30) days following the receipt of the final permit. The standing of a person to file an appeal and the procedures for filing such appeal shall be governed by the provisions of M.G.L. c. 30A. Unless the person requesting an appeal requests and is granted a stay of the terms and conditions of the permit by a court of competent jurisdiction, the permit decision shall remain effective or become effective at the conclusion of the thirty (30) day period. Bentley School Page 4. Notice of Action. Any aggrieved person intending to appeal a grant or denial of a permit to the Superior Court shall first provide notice to the Department of intention to commence such action. Said notice of intention include the Department file number and shall identify with particularity the issues and reason why it is believed the permit decision was not proper. Such notice shall be provided to the Office of General Counsel of the Department and the Regional Director for the regional office which processed the permit application. The appropriate addresses to which to send such notices are: General Counsel Department of Environmental Protection One Winter Street - 3rd Floor Boston, MA 02108 Regional Director Department of Environmental Protection 5 Commonwealth Avenue Woburn, MA 01801 No allegation shall be made in any judicial appeal of a permit decision unless the matter complained of was raised at the appropriate point in the administrative review procedures established in those regulations, provided that a matter may be raised upon a showing that it is material and that it was not reasonably possible with due diligence to have been raised during such procedures or that matter sought to be raised is of critical importance to the environmental impact of the permitted activity. Should any person be aggrieved by this action of the Department in issuing this approval/permit, such person may appeal this action pursuant to the provisions of M. G. L. C 30A, s. 14 . Bentley School Page 5. If you have any questions please contact Manuel N. Alcantara of my staff at the letterhead address or phone 617-935-2160. Very truly your, Edward H. MacDonald Regional Director for Waste Prevention. EHM/MNA/mna. CC: DEP/DSWM-Boston, Attn: Philip Weinber, Acting Director WSC-NERD, Richard Chalpin Salem, BOH TGG, Consulting Geotethnical Engineers. 100 Crescent Rd. Needham, MA 02194. Earl R.Flansburgh+Associates,Inc. 77 North Washington Street Boston,Massachusetts 02114 Telephone(617)367-3970 Facsimile(617)720-7873 13 August 1991 C� rm 'cn Mr. David Harris rti Building Inspector eon 00 Cn Architecture City of Salem < 'n Space Planning t Interior Design One Salem Green CD Landscape Architecture Salem, MA 01970 Graphic Design cis RE: Bentley Elementary School, Salem, MA ' ERF+A Project No. 8929.01 Earl R.Ransburgh,FAIA Code Interpretation Michael H.Bourque,FIBD Denis V. Boucher,AAIA David S.Soleau,AIA Dear Dave: This letter is being sent to you as a confirmation of our Nelson R.Hammer,ASLA telephone conversation of 12 August 1991. In this Liam Lynch,AIA conversation, I brought to your attention Section 6.10.4 DuncanP McClelland,AIA Laura M.McShane enclosures, of 780CMR regarding fire resistance of corridors. Alan S.Ross,AIA As I indicated, fire resistance rating is not required in buildings equipped with an automatic fire suppression system. This code revision took place on 1 March 1990 and allows the Architect to use zero rating partitions along the corridor walls. We will await your decision as to whether you request the corridor walls to be re-classified as one-hour rated, or leave the document as drawn to be zero rated. Upon this decision, we shall make a determination of the enclosure above the doors in the kindergarten entrance, whether it has to be one-hour fire separation wall or a smoke screen. Please call me if you have any questions. Very truly yours, EARL R. FLANSBU/RGH + ASSOCIATES, INC. g i Dvir, AIA Associate cc: Beth Debski Richard Montoni Christopher Sgarzi BENT3/lc/beth0813 6 . ARTICLE 6 - EGRESS: Max Floor Area per Occupant: Table 606 Educational Classrooms 20sf net Shops, Vocational 50 sf net Length of Exit-way Access Travel: - Table 607 Assembly W/O Sprinkler 150 ft W/ Sprinkler 200ft Capacity Per Unit Egress Width: Assembly W/O Sprinklers Stairs -75 Doors, Corridors -100 W/ Sprinklers Stairs -113 Doors, Corridors -150 7. EXIT-WAY ACCESS CORRIDORS 610 a. Door openings cannot reduce required width by more than 1/2 during swing. b. Fully open doors can not project more than 7 inches into passageway. C. Maximum dead end is 20ft. d. Minimum passageway width is 44 inches. Schools with occupant load of 100 require 72 inches. ,„�.. i - e. Exit-way access-requires=l-hour=fire- resistance-rating] fo'r occupant_load-of 30+.r f. Doors onto access must be self-closing with 20 minute rating or 1-3/4" solid wood core. g. Minimum ceiling height of 8' -0" . h. Interior stairway enclosures need to be 2hr rated. 8. MEANS OF EGRESS DOORWAYS 612 a. Rooms over 2000sf or with load of 50+shall have two doors opening in direction of travel. b. School rooms with 10 occupants require 2 independent means of egress leading to separate exit-ways remote from each other. Communicating doors (swinging both ways) allowed for second means of egress. BENTLEY ELEMENTARY SCHOOL SALEM SCHOOLS , Engineers Design Group, Inc._ r Thomas E. Arthur P.E. Luigi R. Di Napoli P.E. RECEIVED August 31, 1992 SEP p 21992 Earl R. Flansburgh & Associates, Inc. Earl R. flonshurgh &Assoc., Inc. 77 North Washington Street Boston, MA 02114 Attn: Chris Scarzi Re: BENTLEY ELEMENTARY SCHOOL Salem, MA EDG Project Number: 8972 A Gentlemen: As requested, I visited the site today to inspect the 'as-built' lintel over the Door Referenced 118E in the existing building at the entrance to the new library, and wish to confirm that the steel angle and channel will adequately carry the imposed loads from the CMU above. Very truly yours, ENGINEERS DESIGN GROUP, INC. Clement F. cCarey, P.E. l /mem 8972a.1tr 48 Inman Street • Cambridge, MA 02139 • Telephone: J617 492-0100 0 Telex: 92-1450 Earl R.Flansburgh+Associates,Inc. 77 North Washington Street Boston,Massachusetts 02114 Telephone(617)367-3970 Facsimile(617)720-7873 September 4, 1992 Architecture Mr. David Harris Space Planning Building Inspector, City of Salem Interior Design One Salem Green Landscape Architecture Graphic Design Salem, Massachusetts 01970 RE: Bentley Elementary Earl R, Flansburgh,FAIA Project #8929.01 Michael H.Bourque, FIBD David S.Soleau,AIA Dear David: f ' Enclosed please find signed letters from this office and from the Nelson R. P.McCllland, I engineers on the design team who produced the Construction Documents Duncan P.McClelland,AIA Alan S.Ross,AIA for the Bentley Elementary School. Younghee Yoe F Also enclosed is the letter which you requested from the Structural Engineer regarding the steel lintel structure over the new Library Kate Brannelly,SMPS entrance in Segment C. Hagai Dvir,AIA Jeffrey F.Fleming,RA Louminda R.Torbett,IBD Per our discussions today in Salem, we are sending the Contractor sketches for the two new doors at the stairways. These will be installed on Tuesday. We would like to thank you for your time and cooperation in working through this latest issue as well as for your assistance throughout the construction of the school. We are proud of the project and hope that the City of Salem is pleased with their new facility. If you should have any questions please do not hesitate to call. Sincerely, EARL R, FLANSBURGH + ASSOCIATES, INC. Christopher 4Sgarzi, A enclosures cc: Beth Debski, Planning Dept. David Soleau, ERFA file cas/Bent7/bis9492 Earl R.Flansburgh+Associates,Incl 77 North Washington Street Boston, Massachusetts 02114 Telephone(617)367-3970 Facsimile(617)720-7873 3 September 1992 Architecture Space Planning TO THE BUILDING INSPECTOR OF SALEM: Interior Design Landscape Architecture Graphic Design I report that I, or may designated representative, have periodically observed the work associated with the completed construction of the Earl R.Flansburgh,FAIA Bentley Elementary School located on Szetela Lane, Salem, Michael H.Bourque,FIBD Massachusetts, as described in the Construction Documents date 4 June David S.Soleau,AIA 1990, and it is my professional opinion that the architectural work, described on Drawings AO.1 through A9.6 inclusive and modified during LA construction as recorded in the Project Record File, is sufficiently Duncan PMcClella Nelson R.Hammer,ASnd,AIA complete, in accordance with the Contract Documents, so the owner can . Alan S.Ross,AIA occupy or utilize the work or designated portion thereof for the use vounghee voo for whichh111 it is intended, a4rgh, FAIA s//11 expressed in the Contract Documents. Kate i Dvir, lly,SMPS IHagai F.F AIAJeffrey F.Fleming,RALouminda R.Torbett, IBDEarl R. Fla s President Earl R. Flansburgh + Associates, Inc. Address: 77 North Washington Street Boston, MA 02114 Mass. Registration No. : 1731 Architecture sc/bent7/bis9292 RECEIVED Engineers Design Group, Inc. '41W __ Thomas E.Arthur P.E. Earl R. Flansburgh 916t,TjaP°''P.E. September 3, 1992 TO THE BUILDING INSPECTOR OF SALEM: I report that I, or my designated representative, have periodically observed the work associates with the construction of the Bentley Elementary School, Szetela Lane, Salem, Massachusetts, as described in the Construction Documents dated 4 June, 1990, and it is my professional opinion that the structure for the complete project, described on Drawings S-1 through S-13 inclusive and modified during construction as recorded in the Project Record File, is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the work or designated portion thereof for the use for which it is intended, as expressed in the Contraqt Documents. T mas E Artxir P.E. ner E gineers Design Group Inc. Address: 48 Inman Street Cambridge, MA. 02139 Mass. Reg. No. 23616 48 Inman Street 9 Cambridge, MA 02139 0 Telephone: (617 492-0100 • Telex: 92-1450 09/0392 13: 26 8 52338227 ROBERT SULLIVAN 03 Robert W.Sullivan, Inc. CpnaUll in9 I-n9in ow.q LIM 302,Unon Wharf Hoston, Massachuscrts 02100 (617)3,13-8227 (rax)523.8016 A, e SuNvan PE, 3 Septbmber 1992 Anthl nT OStelano HE, Heh19 A. Koldas P.C. George H. Minanan Eupone 9. Klnpmen Steven H Ouielu TO THE BUILDING INSPECTOR OF SALEW I repodt that I, or my designated represent4tive, have periodically observed the work associated with the completed construction of the Bentley School, located on Szetela Lane, Salem, Massachusetts, as described In the Construction Documents dated June 6, 1990, and it is my professional opinion that the Plumbing work, described on Drawings P & FP-1 through P & FP-9 inclusive and modified during construction as recorded in the Project Record File, is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents, A. Eu7enellivPresi ROBERT W. SULUVAN, INC. Address: 302 Union Wharf Boston, MA 02109 Massachusetts Registration No. 9177 Sanitary 09/03/92 13 25 8 5238227 ROBERT SULLIURN 02 i Pabart W. Sullivan, Ina Cc)r?&^nrq Fnpinwws Unit 302, Union Wharf Anion,Massachusctta 02109 (617)523-8221 (ram)5239016 A. Eugene Sullivan P.F. 3 September 1992 Anthony T. DiStefano nF. dahly A.Minas PE. Gmgc H. Minahan Fuyena 9.Kingman Stoven R ovieto TO Tf E BUILDING INSPECTOR OF SALEM: I report that I, or my designated representative, have periodically observed the work associated with the completed construction of the Bentley School, located on Szetela Lane, Salem, Massachusetts, as described in the Construction Documents dated June 6, 1990, and it is my professional opinion that the Fire Protection work, described on Drawings P & FP-1 through P & FP-9 inclusive and modified during construction as recorded in the Project Record File, is sufficiently complete, In accordance with the Contract Documents, so the Owner can occupy or utilize the work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. x qg< A. Eu0sns(AuHiAn President ROBERT W. SULLIVAN, INC. Address: 302 Union Wharf Boston, MA 02109 Massachusetts Registration No. 32351 Fire Protection TVA Consulting 52 Temple Place Boston, Massachusetts Engineers Inc. 02111 617 357-6060 Boston/Toronto/Calgary FAX 357-5188 Julius C. Olsen Richard S.Noce Michael C. Spence Richard G. Zaccone Lorne S. Mitchell Robert W.Shute Roger D. Wardwell James D. Magarion Kevin I Coddle 3 September 1992 TO, THE BUILDING INSPECTOR OF SALEM: I report that I, or my designated representative, have periodically observed the work associated with the construction of the Bentley Elementary School, located on Szetela Lane, Salem, Massachusetts, as described in the Construction Documents dated June 4, 1990, and it is my professional opinion that the Heating, Ventilating and Air Conditioning work, described on Drawings M-1 through M-12 inclusive and modified during construction as recorded in the Project Record File, is sufficiently complete, for the entire project in accor- dance with the Contract Documents, so the Owner can occupy or uti- lize the work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. Richard S. Noce, P.E. President TMP Consulting Engineers, Inc. Address: 52 Temple Place Boston, MA 02111 Massachusetts Registration No. : 28760 Mechanical Engineer �aa) f�21 Thomas M. Brown, NP My commis6ion expires ,08/28/98 RN9#4143—B Lottero + Mason Associates,Inc. Consulting Engineers 132 Lincoln Street Boston,MA 02111 (617)423-7367 RECEIVED FAX:(617)423-6381 SEP 0 41992 + 3 September 1992 Earl R.Flansburgh &Assoc.,Inc. TO THE BUILDING INSPECTOR OF SALEM: I report that I, or .my designated representative, have periodically observed the work associated with the construction of the Bentley Elementary School, located on Szetela Lane, Salem, Massachusetts, as described in the , Construction Documents dated 4 June 1990, that to the best of my knowledge, information and belief the electrical work, described,on Drawings E1 through E17 inclusive and modified during construction as recorded in the project Record File, is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the work or the complete building for the use for which it is intended, as expressed in the Contract Documents. / 7 N OF Vie- Ine)V46u , P.E. sident s� Lottero + Mason Associates, Inc. OHN �' E NO.25873 Address: 132 Lincoln Street g9�9fs/STEa�' b� Boston, MA 02111 SSION 10 -w , Mass. Registration No. : 25873 Electrical Engineers Design Group, Inc. Thomas E. Arthur P.E. Luigi R. Di Napoli I'.E. RECEIVED August 31, 1992 SEP U 21492 Earl R. Flansburgh & Associates, Inc. Earl R. FlonSburgh &Assoc., . 77 North Washington Street Boston, MA 02114 Attn: Chris Scarzi Re: BENTLEY ELEMENTARY SCHOOL Salem, MA EDG Project Number: 8972 A Gentlemen: As requested, I visited the site today to inspect the 'as-built' lintel over the Door Referenced 1 I 8 in the existing building at the entrance to the new library, and wish to confirm that the steel angle and channel will adequately carry the imposed loads from the CMU above. Very truly yours, ENGINEERS DESIGN GROUP, INC. Clement F. cCarey, P.E. /mem 8972a.1tr 48 Inman Street • Cambridge, MA 02139 0 Telephone: 16171 49?-0100 0 1 ele.c: 92-1450 � y 1111.1, 017LADINQ POLICY R 1YSC-119-0011 U.01:LADING 1: VAI If: j! l2D C DPQU CASH 1: OGNIUtAIOtt NAMIYADI)MISSs SIl U OP U11NU11A1101h Town of Salem I s1itliiir_ Bentley School, Szetela Lane 1 Salem Green 1DWN Salem Salem, MA 02114 STAID _ Massachusetts CONTACT(IMI:..Ma Unth nPtiatri/508-745-9545 91tANSMNtTAIIONACC:IOUN'Il _Y ,.X N MAIP.RIAL DISCRIMION(IDI-ALPROMCIUDQUA N'I11Y): , CONTAMINAIL•D SOU,t 70 CONrMAINAIUD WHOM: Y .bsodxat pads I abtc;bznt Lronnr wt(unit) voi(w yds) vol (ea yds)speedy ddi aha(fly) IYMIIOFCONTAMINA110Nt ANALYSIS A1IACIMD1 ,'jssoiGu: _ 1201! �,R4a0 :16ali•_.. ahcr(gKdly) XY 'L'N'r,17'1ls._Y;`N 's •c ' 't 2tAttSl'Olt'!'UttIAMLYADDlttSSt - DHS 1114MIONi:ACILi'IYNAMLzlAUDRUSSt • (Brox Peeing Matertaial lnc a�w tau ` 1Sy 4Brox1Pavtng Matertalalnczj" � £�' ; Tei-M}�-ssPaOt�1y71 . YkL�tVPrt, � S�KC� M lariat,,stt�e�t— �1�7�1^"1,���CI.�Y1,�"5i�l�t°G�'' �' CONI'AC37IlU,It Mr. Erik Stevenson/603-886-8077 IYMUOPPACILCI'Y: X Rc: u Lutd011 lntineuws . YcIlC.._ 01:N1JtA'IOR'S SIONAIUIM: '(..t. DAIII: (AIIOYB!'lUMSMUS'rUOCOMimi! Mlt101tIOUGQLIAU'(lIUIll 1 I AU4II0IUZA11ON: DUQBSIGNAIURL:(oillimtb:asciias): � Gcs�Zl. DAM (//77/11 (Uappltuidc) DIQUStONA11.11(t)(daQmtlontcalon): DAIUt iitUCrJI1LlC1DR'tt'sGISIItAI10ti �i�a '2O5 IP QUAIiIl"rY Sllti'i'RU: wt(tons) foi(cu yds) IRAILIM REGISlltA11ON /n � 1 Ol/q 1D7'AI.I'll OWC11SU _ I.OPrSIl-HA1' DATA /2--6 —'�f/ SIIit'I'i1DI0S)A'Il! .,_.. GUNERA'r01tOlt IM UiYI PA LI'iY Jit: ll'A'IIVI S '1111S LOAD(cid,wird) SIGNA1UIU1: RUMAININU'10 OI!SIIlMPOU NtAtCSI'{Nt1l'ti' GNAIUIG3 J DAIi) RECEIVING I:ACiLrl'Y RUM7tSSONTA11VUS SIONA ItU �^�>� �+�+� DA'111 2,-4ARR11bin 2.��- ' OUNWUIX)It IS RPSI'OIISIIILO 1<)lt IUr1U1tNINO COMI'LN!}D 1'i)Ithl W I1111N S DAYS'10: - l DIJ'AltlblliN'1'01:UNVIItONhII:N'1'AI.QUAI.II'YI?21UTAC-,IIItUJU IIWSt:A:MiiittiRtlCY ItPSI'ONSR RRANCII ONO WIN'11:lt SIRI:L'!',Silt I•'LOOlt DOMON,MA 07108 + 111Oo1UOINATINGROGIONALOFFICtt 'icy ALSIPICAI'ION Olt MI51t1;1'I(1 SI:N'M'I'I0N OF ANY OP'I'III;INPOItM1IA'HON 01,1111IS IIII L OF LAMING) IS A VIOI.KI ION UP LC1.L. C. 21C AND 310 CMR 30,006 AND 90.007 AND IS SUIIJEC! -1.0 At'I ROPRIA'IN S!A'!'tUrOltY Olt ItHOULAFORY C` 4e C mmontnealt4 of IHassac4nutts DEPARTMENT OF PUBLIC SAFETY " ELEVATOR DIVISION ONE ASHBURTON PLACE, BOSTON 02211}�0�8 Elevator 1 Locatedat�/ /'� m �)h.t1 A.f s4V �fl.k V C ti, �t CERTIFICATE FOR USE OF ELEVATOR Chapter 143, General Laws, as amended. Capacity Pounds Speed ..Feel Per Min. Date issued Fi� Inspectar���2]—L`^s. "r"`y'—`�"+� Chiel of I�ctions � Expires I year from above date ti In Csae of Accident Notify the Chief of Inspections at Once rpm H-a(Ppv IrBe� Charles C.SamioLts, PE. Inc. Deal Estate DevelopmenL/Civil Engineering/Environmental(Services RECEIVE ® 3EP 0 81992 3 September 1992 Earl R.Flansburgh&Assoc.,Inc. TO THE BUILDING INSPECTOR OF SALEM: I report that I, or my designated representative, have periodically observed the work associated with the construction of the completed Bentley School, located on Szetela Lane, Salem, Massachusetts, as described in the Construction Documents dated 4 June 1990, and it is my professional opinion that the civil engineering work described on drawings CE-1 through CE-3 inclusive and modified during construction as recorded in the Project Record File, is sufficiently complete, in accordance with the Contract Documents, so the owner can occupy or utilize the work or designated portion thereof for the use for which i A 'ntended, as expressed in the Contract Documents. OF CHARLES ORGE AMIOTES No. 31 y 1 TS U`. harles G. Sam Principal Charles G. Samiotes, PE, Inc. Address: Sixty-five East Plain Street Wayland, MA 01778 Mass. Registration No. : 31865 Civil Engineering CGS/8916-dds/dds &xty-five East Plain 61,Fc t Wayland.Ma&�;achusetLs 01778 . (508) 651-0539