13 MARLBOROUGH ROAD - BUILDING INSPECTION -L
-/ 13 MART BOROUGH ROAD f
/�6� 3
��I �
� �
� n`�
V
� ,
� �
�,
� ��
� a
t� � �
PPM
CA
�o THIS PEERMILINOT CLOIDYUNLESS
CITY OF SALEM -BUILDING �^ PROPERLY RECEIPTED BY CASHIER
9 SALEM, MASSACHUSETTS 01970 PERMIT VALIDATION
,�4 O
DATE Sepr • 2 19 87 PERMIT N.O. 1039
APPLICANT
Len Gibley ADDRESS izI wa-riuorougn a. ise
_
1x0.1 ISTREETI ICOAT F'S LIfENSEI
install siding --- NUMBER OF 1
PERMIT TO (_I STORY DWELLING UNITS
(TYPE OF IMPROVEMENTI N0. (PROPOSED USE)
AT (LOCATION) 13 Marlborough Rd. Vard 4 ZONINGCT R_ I
CISTIND.) (STREET)
BETWEEN AND
(CROSS STREET) (CROSS STREET)
LOT
SUBDIVISION LOT BLOCK SIZE
BUILDING IS TO BE FT, WIDE BV FT. LONG BV FT, IN HEIGHT AND $HALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: install sldinp
AREA OR ♦♦ M1 f ovo•QC PERMIT p 2C n d'U
VOLUME ESTIMATED COST y FEE S
'.CUBIC/SQUARE FEET)
OWNER Cravley MMMI��
IJ .-uY iiiOiZl ii��i .�4 • � 56 Ac.� �:ati
T „ C
ADDRESS
iE.c PCI:CG-� .;t1 olil lu� ,�Fb
YOUR SPECIAL ATTENTION j= vmdlurl to the billowing:
This permit is granted on the express condition that the said construction shall, in all respects,conform
to the Ordinances of this jurisdiction including the Zoning Ordinance,regulating the construction anduse of
buildings, and may be revoked at any time upon violation of any provisions of said ordinances.
Newhcrpmof plru and given at Lw time permit is issued must be displayed on premises. the department must
h, notified and inspection tmde of prior ronstru, tion work us requested on weather card. All new buildings and
ahlitionx :tad alterations w existing buildings require a minimum of three cull inspections, namely, (1) Footings,
drain We spstems, foundwion and basement walls, when walls are at least two feet high, but before back filling
the wall and before pmreeding with the superstruetures. (Z) Framing prior to lathing and plastering, duct work,
fire .,<wpping and other equipment before it is ,nreal rah (A) Final inspection when building or structure is com-
pleted.
On jobs involving reinforced concrete work, inspection must be made after steel is in place and before concrete
is poured.
The Department reserves the right to reject any work which has been concealed or completed without first
having been inspected ,md itpprevcd by the Ik p rtment in :moorrian, with the requirements of the various codes.
Any deviation from th, :approved pl:ms must he authorized by the approval of revised plans subject to the same
procedure established 6,r the examination of the original plans. An additional permit fee is also charged predicated
on the extent of the v;vtnuon from the original plans
Permits are not v;did if construction work is not started within six months from date pennit is issued.
Request for Final Inspection should be made b} postcard or phone call to ibis department when the
construction work is completed and heating apparatus has been installed. Painting or decorating is not required
before the Final Building Inspection.
Final Inspection and certiticate of occupancy must be obtained before cocupying building.