Loading...
8 MARINERS WAY - BUILDING INSPECTION • 8 MARINERS WAY , 3 ` Titu of #alrm, Massar4usetts Public Propertg i9epartment iluilbing Department (fne *ulem (6reen 508-745-9595 $xt. 300 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer June 12 , 1996 Chief Turner 48 Lafayette Street Salem, Mass . 01970 RE : Fafard Project Dear Chief Turner : On December 12 , 1995 , I forwarded some material concerning the above mentioned project for your review. I also requested that you, in writing, give me a specific reason why you will not perform said inspections . Until this date I have received nothing concerning the reason these inspections are not being made . It is in the best interest of our Public Safety Department that we work together to provide and promote the health, safety, morals or welfare of the inhabitants of Salem. And it is also our duties to enforce the State Building Codes as they are written, or until they are changed through amendments per our legal process . This department will again issue an occupancy permit for 8 Mariners Way, without a sign off from your department per Article 113 . 5 of the 780 CMR State Building Code . This office is willing to meet with you and your Fire Prevention officers at any time to discuss this issue as well as any other issue that might be of concern . Please call to make an appointment at your convenience. Thank you in advance for your anticipated cooperation in this matter. Sincerely, Leo E . Tremblay Inspector of Buildings LET: scm cc: David Shea Norman LaPoint CERd: Pert-OCCUPANCY7. CITY OF SALEM Issued: SALEM, MASSACHUSETTS 01970 City of Salem Building Dept DATE JANUARY 31 19 96 PERMIT NO. 37-1996 APPLICANT FRFARD DEVELOP CORP ADDRESS `x..41 EL'-C':' ST - 660 (NO.) (STREET) (CONTR'S LICENSE) C&Y ASHLAND STATE IMA ZIP CODE 021 9 TEL.NO. 51218-881-1604 PERMIT TO NEW BUILDING STORY ONE FAMILY NUMBEROF (_) (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) DWELLING UNITS AT(LOCATION) -0000 WHALERS LANE ZONING DISTRICT (NO.) (STREET) BETWEEN .. AND +lc..ae (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 07 LOT 004") BLOCK SIZE J• J7 ACRES BUILDING IS TO BE FF.WIDE BV FT.LONG BY FF.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION } (TYPE) REMARKS: CONSTRUCT UNIT 2 OF 4 UNIT CONDO @ .#8 MARINERS WRY AS PER PLANS SUP! AREA OR29Q c. 91, I . FEFERMI T� VOLUME ESTIMATED COST$ (CUBICGOUARE FEET) MARINER DEVELOPMENT CORP �{ OWNER BUILDING DEPT. ADDRESS 290 ELIOT STREET BY CITY OF SALEM BUILDING ` Z , 019 SALEM, MASSACHUSETTS 01970 PERMIT JANUARY :i DATE 19 PERMIT NO. FA.f-Tri:=fi :�cl'r..'� rj_ OR�' CIG �_L.I APPLICANT ADDRESS (NO.) (STREET) (CONTR'S LICENSE) AS; -1_AINID I IL 12:211_'1 5ZE—E81 —1 E,0 CITY STATE_ZIP CODE TEL.NO. NEi-:' _.'I_.u':I.iV�_i DFi� IFA!'<T!V NUMBER OF PERMIT TO ` ( ) STORY DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT(LOCATION) 417I27I0, khlA_ER_: LANE ZONING DISTRICT (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION �,_F7F, C,7 LOT 121045 LOT 3_BLOCK SSIZE ='r BUILDING ISTOBE F7.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: I�Q _ T_ 2 AREA VGI� V. coil. LVi :r./ VOLUME vu � VOLUME ESTIMATED COST PERMIT�' � '-t` FEE $ "� (CUBIC/SQUARE FEET) OWNER (''r..!': i-'_,JEL.G G' ':L=-1V. ,-.y�R ADDRESS 1 `�I C5.TR C: ' BY ILDING DEPT. 2 d2 -' - THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ► ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2,PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY 70 LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS _ELECTRICAL INSPECTION APPROVALS BOAGAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS OTHER CITY ENGINEER - 2 n / /')Q �` 2 Com✓/' 6 WORK SHALL NOT PROCEED UNTIL THE FAS MIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS T STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION NOTED ABOVE. OR WRITTEN NOTIFICATION.