UTS Job 23418 Report 6 Soil Inspection Report 07-03-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-03-2019Soil Inspection Report Report No.6 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C Excavator, Wacker DPU 6555 Plate Compactor TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Sub grade improvements continued within proposed roadway areas located at the South side of proposed building 2. The area was carried down to approximately 5' below finished grade utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Careful attention focused on utility grades and layout to make specific accommodations for manholes and deep utility runs. The sub grade soil in this area is fill, specifically tannin bark. Existing timber piles were encountered during excavation and were cut off as necessary to avoid utility installation interference. Groundwater was present. De watering was performed as necessary to maintain semi dry sub grade conditions. A layer of geogrid was placed atop the sub grade to improve stability. Compaction of the sub grade will not be feasible due to the wet organic sub grade soils. An approximately 12 - 18" thick layer of 2" crushed stone was placed and graded. The surface of the stone was tamped into place utilizing the excavator bucket. The area was filled placing approximately 18" thick lifts of 2" minus processed gravel. Each lift was compacted employing a minimum of 6 passes of coverage utilizing the IR 10 ton drum roller exhibiting stable/firm conditions. The work completed on this date was performed in accordance with the recommendations provided in email correspondence by Kevin Martin of KMM; the geotechnical engineer of record. The tannin bark and highly organic soils were segregated from the granular fill over burden and stockpiled onsite. A sample of the fill overburden was collected and transported to the UTS lab for sieve, proctor and organic content testing. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-03-2019Soil Inspection Report Report No.6 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-03-2019 Report No.6 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment