Loading...
UTS Job 22528 Report 27 Compressive Strength Report - Concrete 06-26-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.27 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:2 71CUBIC YARDS: SET 1 LOCATION:Slab; Column lines V10 - M8 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H493 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 42,000 3,340 1 H494 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 55,000 4,380 3 H495 4 x 8 12.57 Good 06/26/19 07/24/19 28 H496 4 x 8 12.57 Good 06/26/19 07/24/19 28 H497 4 x 8 12.57 Good 06/26/19 07/24/19 28 Slump (in.)6,5 1/2 Air Temp. (F.)68 Conc Temp (F)70 Truck No.117 Ticket No.7887 Time 7:40 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Slab; Column lines M8 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H508 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 37,500 2,980 1 H509 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 50,000 3,980 1 H510 4 x 8 12.57 Good 06/26/19 07/24/19 28 H511 4 x 8 12.57 Good 06/26/19 07/24/19 28 H512 4 x 8 12.57 Good 06/26/19 07/24/19 28 Slump (in.)6 1/2,6 Air Temp. (F.)68 Conc Temp (F)71 Truck No.260 Ticket No.7897 Time 9:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/28/19. Inspector Premium Travel Name Time Hours Time Gary Plante No Min Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.27 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.27 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD; Column lines V10 - M8 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5(+/-)2 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019 Report No.27 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment