UTS Job 22528 Report 4 Compressive Strength Report - Concrete 10-18-2018 (003)-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 18CUBIC YARDS:
SET 1 LOCATION:Wall, line 22-29 at A, F-H3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V056 4.00 x 8.00 12.57 Good 10/18/18 10/25/18 7 32,000 2,550 1
V057 4 x 8 12.57 Good 10/18/18 11/01/18 14
V058 4 x 8 12.57 Good 10/18/18 11/15/18 28
V059 4 x 8 12.57 Good 10/18/18 11/15/18 28
V060 4 x 8 12.57 Good 10/18/18 11/15/18 28
Slump (in.)6
Air Temp. (F.)45
Conc Temp (F)57
Truck No.186
Ticket No.4551
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MR
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
FIELD SUMMARY REPORT
Total Pour:Wall, line 22-29 at A, F-H3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other Styrofoam
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment