UTS Job 22528 Report 1 Compressive Strength Report - Concrete 10-02-2018 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-02-2018Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.Aggregate ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:1 40CUBIC YARDS: SET 1 LOCATION:Footing: Line 1 at A.4 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M723 4.00 x 8.00 12.57 Good 10/02/18 10/09/18 7 28,000 2,230 1 M724 4.00 x 8.00 12.57 Good 10/02/18 10/16/18 14 40,000 3,180 1 M725 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 51,000 4,060 1 M726 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 53,500 4,260 2 M727 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 53,000 4,220 1 Slump (in.)5 Air Temp. (F.)55 Conc Temp (F)67 Truck No.1861 Ticket No.9758 Time 9:30 Unit Wt lbs/cu ft Air Content (%)5.9 GENERAL REMARKS: Inspector Premium Travel Name Time Hours Time Matthew Hannigan No Min Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-02-2018Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.Aggregate cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-02-2018Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.Aggregate FIELD SUMMARY REPORT Total Pour:Footing: Line A.4-C Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4 to 6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-02-2018 Report No.1 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment