Loading...
UTS Job 22528 Report 3 Compressive Strength Report - Concrete 10-09-2018 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-09-2018Compressive Strength Report - Concrete Report No.3 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 40CUBIC YARDS: SET 1 LOCATION:Footing - Line B at 11.5 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q374 4.00 x 8.00 12.57 Good 10/09/18 10/16/18 7 35,000 2,780 2 Q375 4.00 x 8.00 12.57 Good 10/09/18 10/23/18 14 46,500 3,700 1 Q376 4.00 x 8.00 12.57 Good 10/09/18 11/06/18 28 54,000 4,300 1 Q377 4.00 x 8.00 12.57 Good 10/09/18 11/06/18 28 57,500 4,570 2 Slump (in.)6 Air Temp. (F.)79 Conc Temp (F)71 Truck No.179 Ticket No.4422 Time 1:26 Unit Wt lbs/cu ft Air Content (%)6.9 GENERAL REMARKS:*MR, EA Inspector Premium Travel Name Time Hours Time Greg Quinno No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-09-2018Compressive Strength Report - Concrete Report No.3 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. MacLellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-09-2018Compressive Strength Report - Concrete Report No.3 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Footing - Line B-K.6 at 1-12 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Caps Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-09-2018 Report No.3 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment