Loading...
UTS Job 22528 Report 9 Compressive Strength Report - Concrete 10-31-2018 (003) Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-31-2018Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:2 50CUBIC YARDS: SET 1 LOCATION:Wall, HS102 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type B061 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 27,000 2,150 1 B062 4 x 8 12.57 Good 10/31/18 11/14/18 14 B063 4 x 8 12.57 Good 10/31/18 11/28/18 28 B064 4 x 8 12.57 Good 10/31/18 11/28/18 28 B065 4 x 8 12.57 Good 10/31/18 11/28/18 28 Slump (in.)5 1/2 Air Temp. (F.)30 Conc Temp (F)53 Truck No.233 Ticket No.027062 Time 9:20 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Wall, HS102 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type B056 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 25,000 1,990 2 B057 4 x 8 12.57 Good 10/31/18 11/14/18 14 B058 4 x 8 12.57 Good 10/31/18 11/28/18 28 B059 4 x 8 12.57 Good 10/31/18 11/28/18 28 B060 4 x 8 12.57 Good 10/31/18 11/28/18 28 Slump (in.)5 1/2 Air Temp. (F.)36 Conc Temp (F)57 Truck No.243 Ticket No.027067 Time 11:40 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR, DCEM155. Inspector Premium Travel Name Time Hours Time Mark Geraci No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-31-2018Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-31-2018Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Wall, HS102 - all walls Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Styrofoam box Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-31-2018 Report No.9 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment