UTS Job 22528 Report 11 Compressive Strength Report - Concrete 11-16-2018 (004) Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS:
SET 1 LOCATION:Footing, column line V at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2
H832 4 x 8 12.57 Good 11/16/18 11/30/18 14
H833 4 x 8 12.57 Good 11/16/18 12/14/18 28
H834 4 x 8 12.57 Good 11/16/18 12/14/18 28
H835 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5 1/2
Air Temp. (F.)43
Conc Temp (F)63
Truck No.242
Ticket No.027621
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing, column line W at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1
H827 4 x 8 12.57 Good 11/16/18 11/30/18 14
H828 4 x 8 12.57 Good 11/16/18 12/14/18 28
H829 4 x 8 12.57 Good 11/16/18 12/14/18 28
H830 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)6
Air Temp. (F.)42
Conc Temp (F)60
Truck No.231
Ticket No.027626
Time 11:00
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 3 LOCATION:Footing, column line X at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1
H847 4 x 8 12.57 Good 11/16/18 11/30/18 14
H848 4 x 8 12.57 Good 11/16/18 12/14/18 28
H849 4 x 8 12.57 Good 11/16/18 12/14/18 28
H850 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5
Air Temp. (F.)40
Conc Temp (F)67
Truck No.254
Ticket No.027633
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)5.2
GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines V-Y.3 at A
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018
Report No.11
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment