UTS Job 22528 Report 11 Compressive Strength Report - Concrete 11-16-2018 (004) Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2018Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS: SET 1 LOCATION:Footing, column line V at A Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2 H832 4 x 8 12.57 Good 11/16/18 11/30/18 14 H833 4 x 8 12.57 Good 11/16/18 12/14/18 28 H834 4 x 8 12.57 Good 11/16/18 12/14/18 28 H835 4 x 8 12.57 Good 11/16/18 12/14/18 28 Slump (in.)5 1/2 Air Temp. (F.)43 Conc Temp (F)63 Truck No.242 Ticket No.027621 Time 9:35 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Footing, column line W at A Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1 H827 4 x 8 12.57 Good 11/16/18 11/30/18 14 H828 4 x 8 12.57 Good 11/16/18 12/14/18 28 H829 4 x 8 12.57 Good 11/16/18 12/14/18 28 H830 4 x 8 12.57 Good 11/16/18 12/14/18 28 Slump (in.)6 Air Temp. (F.)42 Conc Temp (F)60 Truck No.231 Ticket No.027626 Time 11:00 Unit Wt lbs/cu ft Air Content (%)5.6 SET 3 LOCATION:Footing, column line X at A Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1 H847 4 x 8 12.57 Good 11/16/18 11/30/18 14 H848 4 x 8 12.57 Good 11/16/18 12/14/18 28 H849 4 x 8 12.57 Good 11/16/18 12/14/18 28 H850 4 x 8 12.57 Good 11/16/18 12/14/18 28 Slump (in.)5 Air Temp. (F.)40 Conc Temp (F)67 Truck No.254 Ticket No.027633 Time 12:10 Unit Wt lbs/cu ft Air Content (%)5.2 GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018. Inspector Premium Travel Name Time Hours Time Jordan Depina No Max Day .5 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2018Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2018Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Footing, column lines V-Y.3 at A Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5 +/- 1 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2018 Report No.11 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment