UTS Job 22528 Report 9 Reinforcing Steel Report 11-27-2018 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Reinforcing Steel Report
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:30 PM
TIME OF CONCRETE PLACEMENT:1:00 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R1-R9, rev. 0 dated 8/7/18
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall: lines I, 16-22; Z.3, I-J; Z.3-Y.3 at 30; Y.3, 30-30 (completed area of 11/27/18 placement);
Wall: lines Y.3, 32-52 (in process area of future placement; a reinspection will be required before
concrete placement);
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete/in process at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Reinforcing Steel Report
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Reinforcing steel installation for the 11/27/18 placement is complete and acceptable;
installation for the future placement is in process, with a reinspection required
prior to placement.
NOTE: The areas inspected for today's concrete placement were only able to be viewed
from the top of form staging as the wall forms had been closed prior to scheduling of
this inspection.
The writer also reviewed the reinforcing steel installation at lines Y.3, 32-52 and
found wall steel to be approximately 50% complete, requiring a final inspection.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mike Garland No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings