Loading...
UTS Job 22528 Report 14 Compressive Strength Report - Concrete 11-30-2018 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-30-2018Compressive Strength Report - Concrete Report No.14 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS: SET 1 LOCATION:Wall: Line Y.3 at 39.5 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type L853 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 21,000 1,670 1 L854 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 34,500 2,740 2 L855 4 x 8 12.57 Good 11/30/18 12/14/18 14 L856 4 x 8 12.57 Good 11/30/18 12/28/18 28 L857 4 x 8 12.57 Good 11/30/18 12/28/18 28 L858 4 x 8 12.57 Good 11/30/18 12/28/18 28 Slump (in.)5 Air Temp. (F.)45 Conc Temp (F)71 Truck No.249 Ticket No.0742 Time 1:45 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Wall: Line 44 at X.1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type L847 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 18,500 1,470 2 L848 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 33,500 2,670 1 L849 4 x 8 12.57 Good 11/30/18 12/14/18 14 L850 4 x 8 12.57 Good 11/30/18 12/28/18 28 L851 4 x 8 12.57 Good 11/30/18 12/28/18 28 L852 4 x 8 12.57 Good 11/30/18 12/28/18 28 Slump (in.)6 1/2 Air Temp. (F.)40 Conc Temp (F)69 Truck No.257 Ticket No.7851 Time 3:20 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Wall: Line X.1 at 45 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type L841 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 20,000 1,590 2 L842 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 29,000 2,310 2 L843 4 x 8 12.57 Good 11/30/18 12/14/18 14 L844 4 x 8 12.57 Good 11/30/18 12/28/18 28 L845 4 x 8 12.57 Good 11/30/18 12/28/18 28 L846 4 x 8 12.57 Good 11/30/18 12/28/18 28 Slump (in.)6 Air Temp. (F.)40 Conc Temp (F)68 Truck No.255 Ticket No.7853 Time 4:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 12-3-18. Same day call in. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-30-2018Compressive Strength Report - Concrete Report No.14 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Inspector Premium Travel Name Time Hours Time Colin Begin No Max Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-30-2018Compressive Strength Report - Concrete Report No.14 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Walls: Line Y.3 at 39-45, 37-39 at X.1 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4 to 7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-30-2018 Report No.14 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment