UTS Job 22528 Report 10 Compressive Strength Report - Concrete 11-15-2018 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-15-2018Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 48CUBIC YARDS: SET 1 LOCATION:Footing, column line 4 at G Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H402 4.00 x 8.00 12.57 Good 11/15/18 11/22/18 7 31,000 2,470 2 H403 4.00 x 8.00 12.57 Good 11/15/18 11/29/18 14 41,000 3,260 1 H404 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 54,500 4,340 1 H405 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 57,500 4,570 2 H406 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 56,000 4,460 2 Slump (in.)4 1/2 Air Temp. (F.)45 Conc Temp (F)67 Truck No.241 Ticket No.027594 Time 1:45 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR; Cylinders received on 11/20/2018. Inspector Premium Travel Name Time Hours Time Jason Clark No Min Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-15-2018Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-15-2018Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Footing, column lines 4 at E-U, D3-G at 2-16 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-15-2018 Report No.10 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment