Loading...
UTS Job 22528 Report 13 Compressive Strength Report - Concrete 11-20-2018-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-20-2018Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 44CUBIC YARDS: SET 1 LOCATION:Footing: Line I at 17-20 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I235 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 31,000 2,470 2 I236 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 38,500 3,060 2 I237 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 43,000 3,420 1 I238 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 46,000 3,660 2 I239 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 45,000 3,580 2 Slump (in.)5 Air Temp. (F.)39 Conc Temp (F)70 Truck No.250 Ticket No.7730 Time 11:45 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Footing: Line I at 27-30 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I240 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 28,000 2,230 1 I241 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 34,000 2,700 1 I242 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 42,000 3,340 2 I243 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 43,500 3,460 2 I244 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 45,000 3,580 1 Slump (in.)5 Air Temp. (F.)39 Conc Temp (F)63 Truck No.239 Ticket No.7736 Time 2:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR. Cylinders received on 11-26-18. Inspector Premium Travel Name Time Hours Time Jordan Depina No Max Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-20-2018Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-20-2018Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Footings: Line I at 17 to 39 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5 +/- 1 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-20-2018 Report No.13 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment