UTS Job 22528 Report 16 Compressive Strength Report - Concrete 12-07-2018 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-07-2018Compressive Strength Report - Concrete Report No.16 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS: SET 1 LOCATION:Wall: Line Z at .451 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type P449 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 26,000 2,070 1 P450 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 34,500 2,740 1 P451 4 x 8 12.57 Good 12/07/18 01/04/19 28 P452 4 x 8 12.57 Good 12/07/18 01/04/19 28 P453 4 x 8 12.57 Good 12/07/18 01/04/19 28 Slump (in.)5 1/2 Air Temp. (F.)38 Conc Temp (F)62 Truck No.164 Ticket No.0431 Time 12:10 Unit Wt lbs/cu ft Air Content (%)7.0 SET 2 LOCATION:Wall: Line W at 7 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type P459 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 27,000 2,150 1 P460 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 35,500 2,820 1 P461 4 x 8 12.57 Good 12/07/18 01/04/19 28 P462 4 x 8 12.57 Good 12/07/18 01/04/19 28 P463 4 x 8 12.57 Good 12/07/18 01/04/19 28 Slump (in.)4 1/2 Air Temp. (F.)38 Conc Temp (F)63 Truck No.191 Ticket No.0439 Time 1:15 Unit Wt lbs/cu ft Air Content (%)6.8 SET 3 LOCATION:Wall: Line Z at 3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type P454 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 28,000 2,230 2 P455 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 36,500 2,900 2 P456 4 x 8 12.57 Good 12/07/18 01/04/19 28 P457 4 x 8 12.57 Good 12/07/18 01/04/19 28 P458 4 x 8 12.57 Good 12/07/18 01/04/19 28 Slump (in.)5 Air Temp. (F.)38 Conc Temp (F)60 Truck No.246 Ticket No.0445 Time 2:10 Unit Wt lbs/cu ft Air Content (%)6.5 GENERAL REMARKS:Cylinders received on 12-11-18. Inspector Premium Travel Name Time Hours Time Sam Ally No Min Day .5 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-07-2018Compressive Strength Report - Concrete Report No.16 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-07-2018Compressive Strength Report - Concrete Report No.16 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Wall: Lines Z at .451 to W at 18 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneXX Other Slump Specification (in.)4 to 6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-07-2018 Report No.16 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment