UTS Job 22528 Report 15 Compressive Strength Report - Concrete 12-04-2018-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-04-2018Compressive Strength Report - Concrete Report No.15 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 99CUBIC YARDS: SET 1 LOCATION:Wall, column line Y.3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M921 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 35,500 2,820 2 M922 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 46,000 3,660 1 M923 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 55,000 4,380 1 M924 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 52,000 4,140 2 M925 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 56,000 4,460 1 Slump (in.)5 Air Temp. (F.)36 Conc Temp (F)74 Truck No.253 Ticket No.161508 Time 12:45 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Wall, column line Y.3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M931 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 39,500 3,140 3 M932 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 49,000 3,900 1 M933 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 60,500 4,810 3 M934 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 58,000 4,610 2 M935 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 57,000 4,530 1 Slump (in.)5 Air Temp. (F.)36 Conc Temp (F)68 Truck No.231 Ticket No.161508 Time 1:00 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Wall, column line Y.1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type M926 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 37,000 2,940 1 M927 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 48,000 3,820 2 M928 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 60,000 4,770 3 M929 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 57,000 4,530 2 M930 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 59,000 4,690 1 Slump (in.)5 Air Temp. (F.)35 Conc Temp (F)73 Truck No.253 Ticket No.161508 Time 3:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR; Cylinders received on 12/05/2018. Inspector Premium Travel Name Time Hours Time Jordan Depina No Min Day .5 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-04-2018Compressive Strength Report - Concrete Report No.15 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-04-2018Compressive Strength Report - Concrete Report No.15 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Wall, column lines Y.3 35-53, Y.1 at 36-38 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Slump Specification (in.)5 +/- 1 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-04-2018 Report No.15 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment