Loading...
UTS Job 22528 Report 12 Reinforcing Steel Report 01-16-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019Reinforcing Steel Report Report No.12 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction CONTACT:Jeff Daigneault/Jason Blaise TIME OF INSPECTION:11:00 AM TIME OF CONCRETE PLACEMENT:12:00 PM SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 CONTRACT DRAWINGS: REVISION NUMBER:DATED: SHOP DRAWING(S):R-7, rev. #1, dated 08/24/2018 PROJECT SPECIFICATIONS:03300 OTHER: XDRAWINGS STAMPED:YES NO AREA REVIEWED: Footing, column lines 34-41; Pier, column lines F16-F28 REVIEWEDATTRIBUTES: Yes No Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X Clearance X Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X Bar Supports X Bar Spacing X Bar Quantity X Placement and tying X X The details in the above described area(s) were complete at the time of this inspection. X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site. Reinforcing steel installation is complete and acceptable.GENERAL REMARKS: Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019Reinforcing Steel Report Report No.12 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Inspector Premium Travel Name Time Hours Time Marquisse Silva No Min Day .5 Hr(s) REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings