Loading...
UTS Job 22528 Report 18 Compressive Strength Report - Concrete 01-16-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019Compressive Strength Report - Concrete Report No.18 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:1 50CUBIC YARDS: SET 1 LOCATION:Footing, column lines 34-41 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type C182 4.00 x 8.00 12.57 Good 01/16/19 01/23/19 7 32,500 2,590 1 C183 4.00 x 8.00 12.57 Good 01/16/19 01/30/19 14 45,500 3,620 2 C184 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 57,000 4,530 1 C185 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 56,500 4,490 2 C186 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 58,000 4,610 1 Slump (in.)6 Air Temp. (F.)36 Conc Temp (F)61 Truck No.117 Ticket No.152072 Time 2:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 01/21/2019. Inspector Premium Travel Name Time Hours Time Marquisse Silva No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019Compressive Strength Report - Concrete Report No.18 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019Compressive Strength Report - Concrete Report No.18 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Footing, column lines 34-41; pier, column lines F16-F28 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field Other Placement Protection:Thermal Blankets Heat None Other Slump Specification (in.)5-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-16-2019 Report No.18 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment