UTS Job 22528 Report 20 Compressive Strength Report - Concrete 03-20-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 03-20-2019Compressive Strength Report - Concrete Report No.20 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8" *No. Of Sets: 4 225CUBIC YARDS: SET 1 LOCATION:SOD: NE Corner, Level 3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V987 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 42,000 3,340 1 V988 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 54,000 4,300 1 V989 4 x 8 12.57 Good 03/20/19 04/17/19 28 V990 4 x 8 12.57 Good 03/20/19 04/17/19 28 V991 4 x 8 12.57 Good 03/20/19 04/17/19 28 Slump (in.)7 1/2 Air Temp. (F.)32 Conc Temp (F)62 Truck No.254 Ticket No.3660 Time 8:05 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOD: SE Corner, Level 3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V992 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 46,000 3,660 1 V993 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 60,000 4,770 2 V994 4 x 8 12.57 Good 03/20/19 04/17/19 28 V995 4 x 8 12.57 Good 03/20/19 04/17/19 28 V996 4 x 8 12.57 Good 03/20/19 04/17/19 28 Slump (in.)7 Air Temp. (F.)34 Conc Temp (F)68 Truck No.239 Ticket No.3667 Time 8:45 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOD: SW Corner, Level 3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V982 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 43,500 3,460 2 V983 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 59,000 4,690 2 V984 4 x 8 12.57 Good 03/20/19 04/17/19 28 V985 4 x 8 12.57 Good 03/20/19 04/17/19 28 V986 4 x 8 12.57 Good 03/20/19 04/17/19 28 Slump (in.)7 1/2 Air Temp. (F.)35 Conc Temp (F)64 Truck No.242 Ticket No.3675 Time 9:30 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:SOD: SW Corner, Level 3 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 03-20-2019Compressive Strength Report - Concrete Report No.20 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type W001 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 45,000 3,580 2 W002 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 57,000 4,530 2 W003 4 x 8 12.57 Good 03/20/19 04/17/19 28 W004 4 x 8 12.57 Good 03/20/19 04/17/19 28 W005 4 x 8 12.57 Good 03/20/19 04/17/19 28 Slump (in.)7 Air Temp. (F.)35 Conc Temp (F)71 Truck No.255 Ticket No.3683 Time 10:30 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*Light-Weight, MRWR, 2% Non Cloride Accel. Same Day Call In. Cylinders Received 3- 21-19 Inspector Premium Travel Name Time Hours Time Jordan Depina No Min Day .5 Hr(s) Chris King No Min Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 03-20-2019Compressive Strength Report - Concrete Report No.20 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 03-20-2019Compressive Strength Report - Concrete Report No.20 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD: Hotel, Level 3 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X X Other:Screed Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Slump Specification (in.)6 (+/-) 1 Number of slumps out of specification reported to If rejected Approved by Remarks: