UTS Job 23418 Report 3 Soil Inspection Report 06-28-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-28-2019Soil Inspection Report Report No.3 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C Excavator, Wacker DPU 6555 Plate Compactor TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Sub grade improvements were performed within proposed roadway areas located within the southern project limits adjacent to the canal. The area was carried down to elevation 1.75' utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. The selected elevation corresponds with 2' below the lowest utility run in the area. The sub grade soil in this area is fill, specifically tannin bark. Groundwater was present. A de watering sump was established to maintain semi dry sub grade conditions. A layer of geogrid was placed atop the sub grade to improve stability. Compaction of the sub grade will not be feasible due to the wet organic sub grade soils. An approximately 18" thick layer of 2" crushed stone was placed and graded. The surface of the stone was tamped into place utilizing the excavator bucket. A 12 - 18" thick layer of 2" minus processed gravel was placed and graded over the stone base. No compaction efforts were witnessed on this date. The work completed on this date was performed in accordance with the recommendations provided in email correspondence by Kevin Martin of KMM; the geotechnical engineer of record. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-28-2019Soil Inspection Report Report No.3 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-28-2019 Report No.3 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment