Loading...
UTS Job 22528 Report 22 Compressive Strength Report - Concrete 04-05-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 04-05-2019Compressive Strength Report - Concrete Report No.22 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8" *No. Of Sets:4 142CUBIC YARDS: SET 1 LOCATION:Slab at 16 Line, Back Corner Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type C909 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 37,000 2,940 1 C910 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 52,000 4,140 2 C911 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 72,500 5,770 1 C912 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 73,000 5,810 2 C913 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 74,500 5,930 1 Slump (in.)7 Air Temp. (F.)37 Conc Temp (F)63 Truck No.252 Ticket No.4324 Time 9:20 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Slab at 21 Line at Center Slab Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type D214 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 47,000 3,740 2 D215 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 58,000 4,610 1 D216 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 64,000 5,090 3 D217 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 62,000 4,930 2 D218 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 65,000 5,170 1 Slump (in.)7 Air Temp. (F.)39 Conc Temp (F)70 Truck No.187 Ticket No.4342 Time 10:35 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Slab at 25 Line Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type C914 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 36,000 2,860 3 C915 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 49,000 3,900 2 C916 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 66,000 5,250 1 C917 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 64,000 5,090 2 C918 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 63,000 5,010 1 Slump (in.)6 1/2 Air Temp. (F.)40 Conc Temp (F)66 Truck No.249 Ticket No.4365 Time 12:00 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:Slab at 29 Line, Front Corner Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 04-05-2019Compressive Strength Report - Concrete Report No.22 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type C919 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 35,000 2,780 2 C920 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 48,500 3,860 1 C921 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 74,000 5,890 1 C922 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 71,000 5,650 3 C923 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 71,500 5,690 2 Slump (in.)7 Air Temp. (F.)41 Conc Temp (F)71 Truck No.241 Ticket No.4375 Time 12:55 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*Light-Weight, MRWR, 1% Non Cloride Accel. Cylinders Received 4-8-19 Inspector Premium Travel Name Time Hours Time Jordan Depina No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 04-05-2019Compressive Strength Report - Concrete Report No.22 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 04-05-2019Compressive Strength Report - Concrete Report No.22 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD: Line 16 to 29, Level 32 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5 (+/-) 1 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 04-05-2019 Report No.22 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment