UTS Job 22528 Report 1 Concrete Plant Report 05-22-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Concrete Plant Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan - Wakefield plant
CLASS CONCRETE:3000# 3/8" L/W*CUBIC YARDS:243
Dry Unit of
Weights Quantity Measure Materials Description
Cement 600 lbs./cu.yd.Brand Name LaFarge, type II
Fine Aggregate 1400 lbs./cu.yd.Source Hefferon - Wilmington, MA
Coarse Aggregate 820 lbs./cu.yd.Source Norlite - NY - 3/8" lightweight
Admixture 1.3 ozs./cu.yd.Brand Name W.R. Grace - Darex II
Admixture 33 ozs./cu.yd.Brand Name W.R. Grace - Daracem-55 (MRWR)
Water 30.2 gals/cu.yd.Source Town of Wakefield
Result PLANT GRADATIONSDescription
SAND COARSE AGGREGATEMoisture in Sand (%)3.8
Moisture in Coarse Aggregate (%)13 F. M.2.79 F. M.5.59
ProbeNumber of Determinations Sieve Size % Passing Sieve Size % Passing
YesWeights Adjusted to Compensate for Moisture #200 #8 3.0
OKSand Colormetric Test #100 4.0 #4 38.0
#50 20.0 3/8"100.0
#30 43.0 1/2"100.0
#16 67.0 3/4"100.0
#8 88.0 1"100.0
#4 99.0 1 1/2"
GENERAL REMARKS:*pump with MRWR.
Inspector Premium Travel
Name Time Hours Time
J. Viera No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings