Loading...
UTS Job 22528 Report 24 Compressive Strength Report - Concrete 05-22-2019 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019Compressive Strength Report - Concrete Report No.24 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 243CUBIC YARDS: SET 1 LOCATION:SOD; Column line 20, Level 44 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T705 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 42,000 3,340 1 T706 4 x 8 12.57 Good 05/22/19 06/05/19 14 T707 4 x 8 12.57 Good 05/22/19 06/19/19 28 T708 4 x 8 12.57 Good 05/22/19 06/19/19 28 T709 4 x 8 12.57 Good 05/22/19 06/19/19 28 Slump (in.)8,7 Air Temp. (F.)60 Conc Temp (F)69 Truck No.232 Ticket No.6282 Time 7:00 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOD; Column line 25, Level 44 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T710 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 40,000 3,180 2 T711 4 x 8 12.57 Good 05/22/19 06/05/19 14 T712 4 x 8 12.57 Good 05/22/19 06/19/19 28 T713 4 x 8 12.57 Good 05/22/19 06/19/19 28 T714 4 x 8 12.57 Good 05/22/19 06/19/19 28 Slump (in.) ** Air Temp. (F.)60 Conc Temp (F)68 Truck No.246 Ticket No.6291 Time 8:00 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOD; Column line 30, Level 44 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T715 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 39,000 3,100 1 T716 4 x 8 12.57 Good 05/22/19 06/05/19 14 T717 4 x 8 12.57 Good 05/22/19 06/19/19 28 T718 4 x 8 12.57 Good 05/22/19 06/19/19 28 T719 4 x 8 12.57 Good 05/22/19 06/19/19 28 Slump (in.)8,7 Air Temp. (F.)60 Conc Temp (F)67 Truck No.242 Ticket No.6302 Time 8:30 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:SOD; Column line 40, Level 44 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019Compressive Strength Report - Concrete Report No.24 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T720 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 41,500 3,300 2 T721 4 x 8 12.57 Good 05/22/19 06/05/19 14 T722 4 x 8 12.57 Good 05/22/19 06/19/19 28 T723 4 x 8 12.57 Good 05/22/19 06/19/19 28 T724 4 x 8 12.57 Good 05/22/19 06/19/19 28 Slump (in.)8,7 Air Temp. (F.)60 Conc Temp (F)68 Truck No.160 Ticket No.6308 Time 9:15 Unit Wt lbs/cu ft Air Content (%) SET 5 LOCATION:SOD; Column line 50, Level 44 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T725 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 36,000 2,860 2 T726 4 x 8 12.57 Good 05/22/19 06/05/19 14 T727 4 x 8 12.57 Good 05/22/19 06/19/19 28 T728 4 x 8 12.57 Good 05/22/19 06/19/19 28 T729 4 x 8 12.57 Good 05/22/19 06/19/19 28 Slump (in.)8,7 Air Temp. (F.)60 Conc Temp (F)69 Truck No.179 Ticket No.6314 Time 10:20 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 05/23/19. *MRWR **8 1/2, 7 1/2 Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day .5 Hr(s) Stanley Aloi No Max Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019Compressive Strength Report - Concrete Report No.24 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019Compressive Strength Report - Concrete Report No.24 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD; Column lines 20 - 53, Level 44 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)7-8 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019 Report No.24 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment UTS of Massachusetts, Inc. Page 6 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-22-2019 Report No.24 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment