UTS Job 22528 Report 2 Concrete Plant Report 06-05-2019-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Concrete Plant Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan - Wakefield plant
CLASS CONCRETE:3000# 3/8"*CUBIC YARDS:265
Dry Unit of
Weights Quantity Measure Materials Description
Cement 660 lbs./cu.yd.Brand Name LaFarge - type II
Fine Aggregate 1400 lbs./cu.yd.Source Hefferon - Wilmington, MA
Coarse Aggregate 820 lbs./cu.yd.Source Norlite - NY - 3/8" lightweight
Admixture 1.1 ozs./cu.yd.Brand Name W.R. Grace - Darex II
Admixture 33.5 ozs./cu.yd.Brand Name W.R. Grace - Daracem 55 (MRWR)
Water 31.6 gals/cu.yd.Source Town of Wakefield
Result PLANT GRADATIONSDescription
SAND COARSE AGGREGATEMoisture in Sand (%)3.5
Moisture in Coarse Aggregate (%)18 F. M.2.68 F. M.5.63
ProbeNumber of Determinations Sieve Size % Passing Sieve Size % Passing
YesWeights Adjusted to Compensate for Moisture #200 #8 2.0
OKSand Colormetric Test #100 7.0 #4 35.0
#50 23.0 3/8"100.0
#30 46.0 1/2"100.0
#16 72.0 3/4"100.0
#8 87.0 1"100.0
#4 97.0 1 1/2"
GENERAL REMARKS:*lightweight, pump with MRWR.
Inspector Premium Travel
Name Time Hours Time
J. Viera No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings