Loading...
UTS Job 23432 Report 1 Reinforcing Steel Report 05-31-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-31-2019Reinforcing Steel Report Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction CONTACT:Steve Tsoukalas TIME OF INSPECTION:7:00 AM TIME OF CONCRETE PLACEMENT:Unscheduled SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 CONTRACT DRAWINGS:S2.2 REVISION NUMBER:DATED:5/3/19 SHOP DRAWING(S): PROJECT SPECIFICATIONS:03300 OTHER: XDRAWINGS STAMPED:YES NO AREA REVIEWED: Basement level stair shaft footing; REVIEWEDATTRIBUTES: Yes No Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X Clearance X Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X Bar Supports X Bar Spacing X Bar Quantity X Placement and tying X X The details in the above described area(s) were complete at the time of this inspection. X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site. Reinforcing steel installation is complete and acceptable.GENERAL REMARKS: Inspector Premium Travel Name Time Hours Time Tim Searles No Min Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 05-31-2019Reinforcing Steel Report Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Green Leaf Construction Nicole LaCroix Green Leaf Construction Dan Spinney City of Salem Steve Cummings Green Leaf Construction Steve Tsoukalas