Loading...
UTS Job 23418 Report 8 Compressive Strength Report - Concrete 06-20-2019 (002) Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-20-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 88CUBIC YARDS: SET 1 LOCATION:GCC Piers #578, Building #2 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type F598 4.00 x 8.00 12.57 Good 06/20/19 06/27/19 7 46,000 3,660 1 F599 4 x 8 12.57 Good 06/20/19 07/04/19 14 F600 4 x 8 12.57 Good 06/20/19 07/18/19 28 F601 4 x 8 12.57 Good 06/20/19 07/18/19 28 F602 4 x 8 12.57 Good 06/20/19 07/18/19 28 Slump (in.)7 1/2 Air Temp. (F.)62 Conc Temp (F)69 Truck No.285 Ticket No.1277 Time 7:50 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:GCC Piers #97, Building #1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type F603 4.00 x 8.00 12.57 Good 06/20/19 06/27/19 7 45,500 3,620 1 F604 4 x 8 12.57 Good 06/20/19 07/04/19 14 F605 4 x 8 12.57 Good 06/20/19 07/18/19 28 F606 4 x 8 12.57 Good 06/20/19 07/18/19 28 F607 4 x 8 12.57 Good 06/20/19 07/18/19 28 Slump (in.)6 Air Temp. (F.)62 Conc Temp (F)70 Truck No.1817 Ticket No.1279 Time 9:30 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:GCC Piers #104, Building #1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type F593 4.00 x 8.00 12.57 Good 06/20/19 06/27/19 7 43,500 3,460 2 F594 4 x 8 12.57 Good 06/20/19 07/04/19 14 F595 4 x 8 12.57 Good 06/20/19 07/18/19 28 F596 4 x 8 12.57 Good 06/20/19 07/18/19 28 F597 4 x 8 12.57 Good 06/20/19 07/18/19 28 Slump (in.)7 Air Temp. (F.)62 Conc Temp (F)71 Truck No.1817 Ticket No.1283 Time 11:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/24/19. Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-20-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-20-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:GCC holes Building #2; 585, 578, 577, 576, 582, 583, 584, Building #1; 101, 102, 104, 274, 273, 225, 223, 224 226, 227, 90, 89, 88, 430, 431, 432, 411, 412, 413, 97, 98, 99, 100 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None Other Slump Specification (in.)5-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-20-2019 Report No.8 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment