Loading...
UTS Job 23299 Report 8 Compressive Strength Report - Concrete 06-12-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-12-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:1 33CUBIC YARDS: SET 1 LOCATION:Interior footing; Column lines H at 4 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type G739 4.00 x 8.00 12.57 Good 06/12/19 06/19/19 7 35,500 2,820 2 G740 4 x 8 12.57 Good 06/12/19 06/26/19 14 G741 4 x 8 12.57 Good 06/12/19 07/10/19 28 G742 4 x 8 12.57 Good 06/12/19 07/10/19 28 G743 4 x 8 12.57 Good 06/12/19 07/10/19 28 Slump (in.)5 3/4 Air Temp. (F.)72 Conc Temp (F)79 Truck No.186 Ticket No.7379 Time 3:45 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/26/19. Night time rate 5:00pm to 6:00pm. Inspector Premium Travel Name Time Hours Time M. Chace No Min Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-12-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan cc:Symes Associates, Inc. Mark Livesey Seger Architects Dan Ricciarelli McBrie, LLC Michael Perham, P.E. McBrie, LLC Bob Whitton City of Salem Steve Cummings Meninno Construction Tom Pascuccio Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-12-2019Compressive Strength Report - Concrete Report No.8 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Interior footings; Column lines 3 - 4 at B, D, F, H, K Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)3-5 Number of slumps out of specification reported to If rejected Approved by Remarks: