UTS Job 22528 Report 26 Compressive Strength Report - Concrete 06-18-2019 (002) Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019Compressive Strength Report - Concrete Report No.26 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 225CUBIC YARDS: SET 1 LOCATION:Slab; Column line 20 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E304 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 34,500 2,740 2 E305 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 46,500 3,700 1 E306 4 x 8 12.57 Good 06/18/19 07/16/19 28 E307 4 x 8 12.57 Good 06/18/19 07/16/19 28 E308 4 x 8 12.57 Good 06/18/19 07/16/19 28 Slump (in.)8,7 Air Temp. (F.)65 Conc Temp (F)72 Truck No.252 Ticket No.7545 Time 7:10 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Slab; Column line 28 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E299 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 35,000 2,780 1 E300 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 47,000 3,740 2 E301 4 x 8 12.57 Good 06/18/19 07/16/19 28 E302 4 x 8 12.57 Good 06/18/19 07/16/19 28 E303 4 x 8 12.57 Good 06/18/19 07/16/19 28 Slump (in.)7,6 Air Temp. (F.)65 Conc Temp (F)70 Truck No.255 Ticket No.7553 Time 7:55 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Slab; Column line 35 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E284 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 45,000 3,580 1 E285 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 57,000 4,530 2 E286 4 x 8 12.57 Good 06/18/19 07/16/19 28 E287 4 x 8 12.57 Good 06/18/19 07/16/19 28 E288 4 x 8 12.57 Good 06/18/19 07/16/19 28 Slump (in.)8,7 Air Temp. (F.)65 Conc Temp (F)72 Truck No.250 Ticket No.5762 Time 8:35 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:Slab; Column line 43 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019Compressive Strength Report - Concrete Report No.26 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E294 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 36,000 2,860 3 E295 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 48,000 3,820 1 E296 4 x 8 12.57 Good 06/18/19 07/16/19 28 E297 4 x 8 12.57 Good 06/18/19 07/16/19 28 E298 4 x 8 12.57 Good 06/18/19 07/16/19 28 Slump (in.)8,7 Air Temp. (F.)65 Conc Temp (F)70 Truck No.117 Ticket No.7571 Time 9:15 Unit Wt lbs/cu ft Air Content (%) SET 5 LOCATION:Slab; Column line 50 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E269 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 47,000 3,740 2 E270 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 60,000 4,770 1 E271 4 x 8 12.57 Good 06/18/19 07/16/19 28 E272 4 x 8 12.57 Good 06/18/19 07/16/19 28 E273 4 x 8 12.57 Good 06/18/19 07/16/19 28 Slump (in.)7,6 Air Temp. (F.)65 Conc Temp (F)71 Truck No.160 Ticket No.7580 Time 10:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/19/19. *MRWR 1% Non-chloride, Lightweight. Inspector Premium Travel Name Time Hours Time Jordan Depina No Max Day .5 Hr(s) Mark Geraci No Max Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019Compressive Strength Report - Concrete Report No.26 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019Compressive Strength Report - Concrete Report No.26 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD; Column lines 19 - 54 on Level 54 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None Other Slump Specification (in.)6(+/-)1 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019 Report No.26 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment UTS of Massachusetts, Inc. Page 6 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-18-2019 Report No.26 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment