UTS Job 23418 Report 10 Compressive Strength Report - Concrete 06-24-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-24-2019Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:4500# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:GCC Piers #122
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
G744 4.00 x 8.00 12.57 Good 06/24/19 07/01/19 7 52,500 4,180 2
G745 4 x 8 12.57 Good 06/24/19 07/08/19 14
G746 4 x 8 12.57 Good 06/24/19 07/22/19 28
G747 4 x 8 12.57 Good 06/24/19 07/22/19 28
G748 4 x 8 12.57 Good 06/24/19 07/22/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)70
Truck No.285
Ticket No.1291
Time 7:40
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:GCC Piers #246
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
G749 4.00 x 8.00 12.57 Good 06/24/19 07/01/19 7 51,000 4,060 1
G750 4 x 8 12.57 Good 06/24/19 07/08/19 14
G751 4 x 8 12.57 Good 06/24/19 07/22/19 28
G752 4 x 8 12.57 Good 06/24/19 07/22/19 28
G753 4 x 8 12.57 Good 06/24/19 07/22/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)72
Truck No.285
Ticket No.1293
Time 10:15
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:GCC Piers #232
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
G754 4.00 x 8.00 12.57 Good 06/24/19 07/01/19 7 50,500 4,020 2
G755 4 x 8 12.57 Good 06/24/19 07/08/19 14
G756 4 x 8 12.57 Good 06/24/19 07/22/19 28
G757 4 x 8 12.57 Good 06/24/19 07/22/19 28
G758 4 x 8 12.57 Good 06/24/19 07/22/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)74
Truck No.285
Ticket No.1295
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/26/19.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day 1 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-24-2019Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Riley Bourque
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-24-2019Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
FIELD SUMMARY REPORT
Total Pour:GCC holes; Building 31, 257, 250, 243, 242, 241, 356, 398, 254, 255, 256, 257, 250, 251, 252,
253, 122, 123, 124, 125, 229, 356
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)5-7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-24-2019
Report No.10
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment