UTS Job 23418 Report 2 Soil Inspection Report 06-27-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-27-2019Soil Inspection Report
Report No.2
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 60-70°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C Excavator, Wacker DPU 6555 Plate Compactor
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Perimeter footing trench excavation continued within the limits of proposed building #2 (see
sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a
flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were recently
completed in this area by installing GCC deep foundation elements. The area was over excavated 6" below
design BOF elevation to provide a cushion/base of material between the elements and the footing. All
GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is
fill and varies in consistency from clay to organic silt with wood to tannin bark. Groundwater was
present. A layer of mirafi 160 filter fabric was placed atop the sub grade as specified. Compaction of
the sub grade will not be feasible due to the wet organic sub grade soils. A 6" thick layer of ¾"
crushed stone was placed and graded. The surface of the stone was compacted utilizing the heavy plate
compactor generally exhibiting stable/firm conditions.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-27-2019Soil Inspection Report
Report No.2
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Riley Bourque
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-27-2019
Report No.2
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment