UTS Job 23418 Report 12 Compressive Strength Report - Concrete 06-26-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:4500# 3/4"No. Of Sets:3 97CUBIC YARDS:
SET 1 LOCATION:Building 1, GCC holes at 209
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H558 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 51,500 4,100 1
H559 4 x 8 12.57 Good 06/26/19 07/10/19 14
H560 4 x 8 12.57 Good 06/26/19 07/24/19 28
H561 4 x 8 12.57 Good 06/26/19 07/24/19 28
H562 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)72
Truck No.285
Ticket No.891301
Time 7:30
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Building 1, GCC holes at 53
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H563 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 49,000 3,900 2
H564 4 x 8 12.57 Good 06/26/19 07/10/19 14
H565 4 x 8 12.57 Good 06/26/19 07/24/19 28
H566 4 x 8 12.57 Good 06/26/19 07/24/19 28
H567 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)73
Truck No.285
Ticket No.891304
Time 10:10
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Building 1, GCC holes at 49
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H568 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 50,000 3,980 3
H569 4 x 8 12.57 Good 06/26/19 07/10/19 14
H570 4 x 8 12.57 Good 06/26/19 07/24/19 28
H571 4 x 8 12.57 Good 06/26/19 07/24/19 28
H572 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)74
Truck No.285
Ticket No.891307
Time 1:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/28/2019.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day 1 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Riley Bourque
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
FIELD SUMMARY REPORT
Total Pour:Building 1, GCC holes at 48, 49, 51-53, 81-89, 201, 202, 205, 209, 321, 322, 344, 345, 361-
363
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5-7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019
Report No.12
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment