Loading...
UTS Job 23418 Report 12 Compressive Strength Report - Concrete 06-26-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 97CUBIC YARDS: SET 1 LOCATION:Building 1, GCC holes at 209 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H558 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 51,500 4,100 1 H559 4 x 8 12.57 Good 06/26/19 07/10/19 14 H560 4 x 8 12.57 Good 06/26/19 07/24/19 28 H561 4 x 8 12.57 Good 06/26/19 07/24/19 28 H562 4 x 8 12.57 Good 06/26/19 07/24/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)72 Truck No.285 Ticket No.891301 Time 7:30 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Building 1, GCC holes at 53 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H563 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 49,000 3,900 2 H564 4 x 8 12.57 Good 06/26/19 07/10/19 14 H565 4 x 8 12.57 Good 06/26/19 07/24/19 28 H566 4 x 8 12.57 Good 06/26/19 07/24/19 28 H567 4 x 8 12.57 Good 06/26/19 07/24/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)73 Truck No.285 Ticket No.891304 Time 10:10 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Building 1, GCC holes at 49 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H568 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 50,000 3,980 3 H569 4 x 8 12.57 Good 06/26/19 07/10/19 14 H570 4 x 8 12.57 Good 06/26/19 07/24/19 28 H571 4 x 8 12.57 Good 06/26/19 07/24/19 28 H572 4 x 8 12.57 Good 06/26/19 07/24/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)74 Truck No.285 Ticket No.891307 Time 1:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 06/28/2019. Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019Compressive Strength Report - Concrete Report No.12 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:Building 1, GCC holes at 48, 49, 51-53, 81-89, 201, 202, 205, 209, 321, 322, 344, 345, 361- 363 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field X Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-26-2019 Report No.12 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment