UTS Job 23418 Report 9 Compressive Strength Report - Concrete 06-21-2019 (002) Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-21-2019Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:2 44CUBIC YARDS: SET 1 LOCATION:GCC piers 116 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type G134 4.00 x 8.00 12.57 Good 06/21/19 06/28/19 7 51,500 4,100 1 G135 4.00 x 8.00 12.57 Good 06/21/19 07/05/19 14 67,000 5,330 1 G136 4 x 8 12.57 Good 06/21/19 07/19/19 28 G137 4 x 8 12.57 Good 06/21/19 07/19/19 28 G138 4 x 8 12.57 Good 06/21/19 07/19/19 28 Slump (in.)7 Air Temp. (F.)60 Conc Temp (F)68 Truck No.285 Ticket No.1288 Time 7:30 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:GCC piers 263 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type G139 4.00 x 8.00 12.57 Good 06/21/19 06/28/19 7 49,500 3,940 2 G140 4.00 x 8.00 12.57 Good 06/21/19 07/05/19 14 62,000 4,930 2 G141 4 x 8 12.57 Good 06/21/19 07/19/19 28 G142 4 x 8 12.57 Good 06/21/19 07/19/19 28 G143 4 x 8 12.57 Good 06/21/19 07/19/19 28 Slump (in.)7 Air Temp. (F.)60 Conc Temp (F)70 Truck No.3884 Ticket No.4876 Time 9:45 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 6-25-19. Inspector Premium Travel Name Time Hours Time Mark Geraci No Min Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-21-2019Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-21-2019Compressive Strength Report - Concrete Report No.9 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:GCC holes building #1: 92-96, 103, 110, 111-113, 263 and 264 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5 to 7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-21-2019 Report No.9 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment