Loading...
UTS Job 23418 Report 13 Compressive Strength Report - Concrete 06-27-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-27-2019Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 87CUBIC YARDS: SET 1 LOCATION:GCC Holes 199 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I091 4.00 x 8.00 12.57 Good 06/27/19 07/04/19 7 50,500 4,020 1 I092 4 x 8 12.57 Good 06/27/19 07/11/19 14 I093 4 x 8 12.57 Good 06/27/19 07/25/19 28 I094 4 x 8 12.57 Good 06/27/19 07/25/19 28 I095 4 x 8 12.57 Good 06/27/19 07/25/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)71 Truck No.285 Ticket No.1309 Time 7:50 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:GCC Holes 186 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I086 4.00 x 8.00 12.57 Good 06/27/19 07/04/19 7 52,000 4,140 3 I087 4 x 8 12.57 Good 06/27/19 07/11/19 14 I088 4 x 8 12.57 Good 06/27/19 07/25/19 28 I089 4 x 8 12.57 Good 06/27/19 07/25/19 28 I090 4 x 8 12.57 Good 06/27/19 07/25/19 28 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)73 Truck No.2065 Ticket No.5099 Time 9:15 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:GCC Holes 37 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I081 4.00 x 8.00 12.57 Good 06/27/19 07/04/19 7 50,000 3,980 I082 4 x 8 12.57 Good 06/27/19 07/11/19 14 I083 4 x 8 12.57 Good 06/27/19 07/25/19 28 I084 4 x 8 12.57 Good 06/27/19 07/25/19 28 I085 4 x 8 12.57 Good 06/27/19 07/25/19 28 Slump (in.)6 1/2 Air Temp. (F.)70 Conc Temp (F)74 Truck No.3164 Ticket No.1318 Time 1:30 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders Received 7-1-19 Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-27-2019Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-27-2019Compressive Strength Report - Concrete Report No.13 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:GCC Holes; Building #1: 199, 200, 125, 124, 122, 123, 119, 118, 185, 186, 187, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 20 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5-8 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-27-2019 Report No.13 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment