UTS Job 23432 Report 1 Compressive Strength Report - Concrete 06-04-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-04-2019Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:1 24CUBIC YARDS: SET 1 LOCATION:Footing: Column Line B at 7 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Z578 4.00 x 8.00 12.57 Good 06/04/19 06/11/19 7 27,500 2,190 1 Z579 4 x 8 12.57 Good 06/04/19 06/18/19 14 Z580 4 x 8 12.57 Good 06/04/19 07/02/19 28 Z581 4 x 8 12.57 Good 06/04/19 07/02/19 28 Z582 4 x 8 12.57 Good 06/04/19 07/02/19 28 Slump (in.)4 3/4 Air Temp. (F.)57 Conc Temp (F)69 Truck No.239 Ticket No.6865 Time 8:41 Unit Wt lbs/cu ft Air Content (%)4.5 GENERAL REMARKS:Cylinders Received 6-6-19 Inspector Premium Travel Name Time Hours Time Greg Quinno No Min Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-04-2019Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan cc:Green Leaf Construction Nicole LaCroix Green Leaf Construction Dan Spinney City of Salem Steve Cummings Green Leaf Construction James Caponigro Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-04-2019Compressive Strength Report - Concrete Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Basement Stairwell Footing: Column Line A-B at 6-8 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Caps Slump Specification (in.)3-5 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-04-2019 Report No.1 Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Attachment