UTS Job 23299 Report 4 Reinforcing Steel Report 06-11-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-11-2019Reinforcing Steel Report
Report No.4
Distribution Copy Job Number 23299
Project North Building,136 Canal St.,Salem, MA
Contractor Symes Associates
CONTACT:Bill O'Mally
TIME OF INSPECTION:12:30 PM
TIME OF CONCRETE PLACEMENT:1:00 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:S3
REVISION NUMBER:DATED:05-28-19
SHOP DRAWING(S):
PROJECT SPECIFICATIONS:03300
OTHER:
xDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footing: Column Line J-E.5 at 5, J-E.5 at 6, 2 at L.5, K, J, H, F, E.5, D, B
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Anthony Nett No Min Day 1 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-11-2019Reinforcing Steel Report
Report No.4
Distribution Copy Job Number 23299
Project North Building,136 Canal St.,Salem, MA
Contractor Symes Associates
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Symes Associates, Inc. Mark Livesey
Seger Architects Dan Ricciarelli
McBrie, LLC Michael Perham, P.E.
McBrie, LLC Bob Whitton
City of Salem Steve Cummings
Meninno Construction Tom Pascuccio