Loading...
UTS Job 23299 Report 4 Reinforcing Steel Report 06-11-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-11-2019Reinforcing Steel Report Report No.4 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates CONTACT:Bill O'Mally TIME OF INSPECTION:12:30 PM TIME OF CONCRETE PLACEMENT:1:00 PM SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 CONTRACT DRAWINGS:S3 REVISION NUMBER:DATED:05-28-19 SHOP DRAWING(S): PROJECT SPECIFICATIONS:03300 OTHER: xDRAWINGS STAMPED:YES NO AREA REVIEWED: Footing: Column Line J-E.5 at 5, J-E.5 at 6, 2 at L.5, K, J, H, F, E.5, D, B REVIEWEDATTRIBUTES: Yes No Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x Clearance x Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x Bar Supports x Bar Spacing x Bar Quantity x Placement and tying x X The details in the above described area(s) were complete at the time of this inspection. X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site. Reinforcing steel installation is complete and acceptable.GENERAL REMARKS: Inspector Premium Travel Name Time Hours Time Anthony Nett No Min Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-11-2019Reinforcing Steel Report Report No.4 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Symes Associates, Inc. Mark Livesey Seger Architects Dan Ricciarelli McBrie, LLC Michael Perham, P.E. McBrie, LLC Bob Whitton City of Salem Steve Cummings Meninno Construction Tom Pascuccio