UTS Job 22528 Report 25 Compressive Strength Report - Concrete 06-05-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:6 268CUBIC YARDS:
SET 1 LOCATION:Column lines; C.1 at 2.9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A124 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 35,500 2,820 1
A125 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 45,000 3,580 1
A126 4 x 8 12.57 Good 06/05/19 07/03/19 28
A127 4 x 8 12.57 Good 06/05/19 07/03/19 28
A128 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)63
Conc Temp (F)72
Truck No.258
Ticket No.6419
Time 7:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Column lines; Q at 3.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A129 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 36,500 2,900 2
A130 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 48,000 3,820 2
A131 4 x 8 12.57 Good 06/05/19 07/03/19 28
A132 4 x 8 12.57 Good 06/05/19 07/03/19 28
A133 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.)8,7
Air Temp. (F.)66
Conc Temp (F)71
Truck No.202
Ticket No.6932
Time 8:10
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Column lines N at 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z989 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 39,000 3,100 2
Z990 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 50,000 3,980 2
Z991 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z992 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z993 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)66
Conc Temp (F)72
Truck No.242
Ticket No.6944
Time 8:55
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Column lines; J.6 at 7.1
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z984 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 41,500 3,300 1
Z985 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 54,000 4,300 1
Z986 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z987 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z988 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)70
Conc Temp (F)74
Truck No.246
Ticket No.6959
Time 10:05
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Column lines; C at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A148 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 33,000 2,630 1
A149 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 44,000 3,500 2
A150 4 x 8 12.57 Good 06/05/19 07/03/19 28
A151 4 x 8 12.57 Good 06/05/19 07/03/19 28
A152 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.)8,7
Air Temp. (F.)72
Conc Temp (F)74
Truck No.241
Ticket No.6967
Time 10:45
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:Column lines F at 18
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z974 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 38,500 3,060 2
Z975 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 49,000 3,900 3
Z976 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z977 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z978 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)75
Conc Temp (F)75
Truck No.258
Ticket No.6983
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/05/19. *MRWR **8 1/2, 7 1/2. Early morning rate 6:00am
to 7:00am.
Inspector Premium Travel
Name Time Hours Time
Corey Keith No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Column lines U at 1, A at 19, SOD, Level 5 Floor
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2-7 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment