Loading...
UTS Job 23418 Report 7 Compressive Strength Report - Concrete 06-14-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-14-2019Compressive Strength Report - Concrete Report No.7 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 77CUBIC YARDS: SET 1 LOCATION:Geo Piers; Column lines 651 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type D120 4.00 x 8.00 12.57 Good 06/14/19 06/21/19 7 40,500 3,220 2 D121 4 x 8 12.57 Good 06/14/19 06/28/19 14 D122 4 x 8 12.57 Good 06/14/19 07/12/19 28 D123 4 x 8 12.57 Good 06/14/19 07/12/19 28 D124 4 x 8 12.57 Good 06/14/19 07/12/19 28 Slump (in.)7 1/2 Air Temp. (F.)57 Conc Temp (F)70 Truck No.285 Ticket No.1246 Time 7:37 Unit Wt lbs/cu ft Air Content (%)2.0 SET 2 LOCATION:Geo Piers; Column lines 657 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type D115 4.00 x 8.00 12.57 Good 06/14/19 06/21/19 7 42,000 3,340 1 D116 4 x 8 12.57 Good 06/14/19 06/28/19 14 D117 4 x 8 12.57 Good 06/14/19 07/12/19 28 D118 4 x 8 12.57 Good 06/14/19 07/12/19 28 D119 4 x 8 12.57 Good 06/14/19 07/12/19 28 Slump (in.)4 Air Temp. (F.)64 Conc Temp (F)75 Truck No.3883 Ticket No.1249 Time 9:38 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Geo Piers; Column lines 522 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type D125 4.00 x 8.00 12.57 Good 06/14/19 06/21/19 7 39,000 3,100 1 D126 4 x 8 12.57 Good 06/14/19 06/28/19 14 D127 4 x 8 12.57 Good 06/14/19 07/12/19 28 D128 4 x 8 12.57 Good 06/14/19 07/12/19 28 D129 4 x 8 12.57 Good 06/14/19 07/12/19 28 Slump (in.)6 1/2 Air Temp. (F.)68 Conc Temp (F)74 Truck No.285 Ticket No.9125 Time 10:22 Unit Wt lbs/cu ft Air Content (%)2.5 GENERAL REMARKS:Cylinders received on 06/17/19. Inspector Premium Travel Name Time Hours Time Greg Quinno No Max Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-14-2019Compressive Strength Report - Concrete Report No.7 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-14-2019Compressive Strength Report - Concrete Report No.7 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:Geo Piers; 672, 673, 674, 675, 504, 676, 677, 506, 498, 497, 496, 503, 507, 499, 508, 509, 502, 501, 500, 651, 522, 670, 671, 517, 516, 514, 515, 513, 512, 511, 510 Method of Placement:Pump Chute Discharge Bucket OtherX Other:Drilling Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Caps Slump Specification (in.)6-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-14-2019 Report No.7 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment