PUNCH LIST - MODERATE REHAB 11/20/2018 B-16-1212 1
tat
November 20,2018
Pequot Highlands Apartments--Moderate Rehab
Monetized Punch List
General Punch $5,000,00
Panels(140+/-)and associated trim $140,000.00
12 story roof parapet $5,000.00
ADA Handrails @ ramp and access path $22,000.00
Site signage $10,000.00
Dumpster Pad $12,500.00
Com munity Room island $3,500.00
Awnings $8,500.00
Community Kitchen Shelving $S00.00
Paint elevator lobby(10)Elevator lobby base $10,000.00
Paint V floor Corridor 12-story $11500,00
Elevator Punch $2,000.00
WJE Punch $8,000.00
Site Cleanup $20,000.00
Close-Out Documents $5,000,00
Total Money Withheld for Punch List Completion:$253,5W.00 x 1.5(multiplier)_$380,250
The Afftei.W4 Team,Irk;. 50 CommardaN..'s Way al Admiral's lilt Ct►koI MA 02150 617.889.4402 arctutecturalkp�u,com