15 Peabody Street (Peabody Street Park): Discussion of proposed signage
Proposal
The attached memo describes the sign proposal and location.
After submission of the proposal, staff has revised its recommendation for the
DCR sign as follows:
• Do not include the DCR logo;
• Use the same background color as the "Peabody Street Park" sign;
• Use the same white font and color as the "Peabody Street Park" sign; and
• Reduce the size approximately in half to 10" x 5".
0,ko I rA
QTY OF SALEM, MASSACHUSETTS
DEPARTMENT OF PLANNING AND
COMMUNITY DEVELOPMENT
KIMBERLEY DRISCOLL
MAYOR 120 WASHINGTON STREET + SALEM,MASSACHUSLYIS 01970
TELL:978-619-5685 + FAX:978-740-0404
Lv,N�,N GOONIN DUNCAN,AICP
DIRECTOR
April 16, 2010
Design Review Board
Salcm Redevelopment Authority
120 Washington Street
Salem, MA 01970
Summary of a Park Sign at 15 Peabody Street
In May, the City will be completing construction of a new park at 13 Peabody Street. With the park
completion on the horizon, the City is coming before the Design Review Board at its April 28th meeting
for review of a park sign. In addition to giving distinction to the park, the sign is also a requirement of
the Urban Self-Help grant which is funding a portion of the park.
The proposed sign for Peabody Street Park is identical to one being posted at Furling Park (20 Franklin
Street) and is designed to comply with the city-wide signage guidelines. It is also similar to those signs
posted along the Bike Path. The proposed park sign is a 2'-6" x 3'-3" single sided aluminum sign
panel hung on a 3" cast aluminum pole. The park name will be in white Adobe Garamond Sernibold
text. Along the bottom of the sign will be "Salem" in a medium gray blue script. The City Seal is
located at the top of the sign. The sign will be hung on an extruded aluminum sign bracket with an
attached steel bar hanger and a cast aluminum finial. All installation work will be performed by the
sign company.
As a requirement of the City's Urban Self-Help grant, administered by the MA Department of
Conservation and Recreation (DCR), the sign must also include the following statement:
PEABODY STREET PARK
A Cooperative Project between the City of Salem and the Commonwealth of
Massachusetts Urban Self Help program
In order to meet this condition, we plan to affix a second sign 3" below the park sign. This second sign
will be 20" Aide x 10" high and will also show the DCR logo, although this is not a requirement of the
grant.
The City is proposing that the sign be located along Peabody Street, centered in a middle planting
island. There are several limiting factors regarding placement of the sign. There are cement seating
walls situated throughout the park. Running underneath one seating wall, parallel to Peabody Street,
is a large steel I-beam (evidence of the property's industrial past). Lastly, there is a wide sidewalk
along Peabody Street. The proposed location accommodates these constraints while also providing
appropriate visibility for the sign.
Proposed Location for Peabody Street Park Sign
4,
City of Salem,MA Sign Type 04B-Destination ID Sign DWG
RP Progr— Elevatim,arid Spedficatictris 04B.1
Description
Single aided aNnimn.sign panel Mtt.lunimurn bar
hanger.aiieuded aluminum sign brutlort and and east
aluminum finIaI
Materials
Pamet 2'-6"INX3-3 H.�)4"thk.aluminum plate
Post FSchedule Q pipe rest alum.Finial.
14-insi-s Beedue,M-31 4'Thk.Alum.bar and Stainless
Steel listeners,Mth�trudisd.1rininum bork,t.
17.0ing;As required.
Graphics&Finish
Finuoh(All Components);
Write..A,i rylw Poly.rethans
Cat Aluminum Finial, I ext Ap plicatiser Refleinive Sheeting.
twi.r M16,Ptd.Bl.k Syv*o L Digit&[print on alum,panel,see Iayout
31 C Berit Sbral Bar T�psfaesse Adobe Ganovond Sernib.W.
Hangs,,Ptd.BI.,k C-1-ae: Pand-Darl,Gray Blue to no Ith,P1,43545C
Tot-wints
—5.1ruded Aluminum Script-Mdj.mG,.yBlu.to ro.1th NW12W
Sign Bracket,Phil.Me& Trinn M.Iding-Bl.ck
1 1,P thli. Post,IInu4B..and B,.kt-B1.6
Phd.Phi$546C
—T�
White R.Hertirs Sheeting
—.Siflerrr Cirephn,
sprayed and m.k.d
LI NIP12446
3"M&hedule 40
51/4,
L? Aluminum PipaPost
Ptd.Bla&
323139-3 SALVAGED 13OULDERS
&NEW ENTRY SIGN
City of Salem,MA Sign Type 04B-Destination ID Sign DWC
Sign fingrm Putel Laymtt 04B.2
B.ke
t FQ FQ
M
IITIAN��.pkt�.Edgnpkd.
FURLONG W.�h M&C..1 G.,
*Wb. d
T�.Ad.b. �all Csp�
PAR K
C'.phn
spmy.d.nd.�k�d
�2"
314 11-0"
323139-4 SALVAGED BOULDERS
& ENTRY SIGN
City of Salem,MA Sign Type 04B-Destination I D Sign DWG
i�'n Progam Pmt,BrivkLt,md Finial Nw& 040-3
c.q"
NO N"951f.
I�4'thk,A].,,
1,2 dk.Ah.,..
IPS�U
iir-d.1,40 At......NF,N�r
N�t Top.ind Fitual Fhl.id
3 4-�2 At...
b,11k.1 sar. 1""
......th
57RAdj.
g.d��.Ih
1 4 1111c. k1u,"
Vthk.AI�PlAt�
3,4' T Md Uu.,
NTS qq,6�d 1� p,,A
W�,.d,'Igr�rluc
I I r lhk.Alt..,.-
Sq �d plo�'A'W 1"t"I
Chill TApped into
3 4 �Z AvmN.td--`
F.� '.'d L'"W44"T w
Sign Prcko
[,.r,,r.,nJ S.gn B,.,,k.-I P.t.p.M.md br,def Odd
0- y- 1 0-
32 -3 139--) SALVAUti.)I:5UULI)h-KN
&NEW ENTRY SIGN
B. Contractor shall provide a second,smaller aluminum sign,approximately 20 inches
wide x 10 inches high, to be mounted on the entry sign post 3 inches below the entry
sign panel.
I. Material shall be 1/8-inch thick aluminum with reflective sheeting face,back
and edges painted black.
2. Text shall be reflective sheeting and shall read:
FURLONG PARK
A Cooperative Project between the City of Salem and the Commonwealth of
Massachusetts Parkland Acquisitions and Renovations for Communities Program
3. An icon image,approximately 4 inches in diameter,shall be provided on the
sign.Image shall be cut vinyl consisting of nine separate colors and appear as
the following:
4. Final sign sizes,text colors, typefaces and sign layout shall be provided by
the Landscape Architect during the Construction Administration phase.
C. All sign colors to be selected from standard or custom colors and approved by the
Landscape Architect.
323139-6 SALVAGED BOULDERS
&ENTRY SIGN
lip
LU w
UJ
(L
E
MR 1
11
ills, m
m A
NU Department of Conservation and Recreation Logo
City Seal
of
SALEM
BIKE PATH
11W.
2'-6"(panel) Description
Single Sid d aduminu n sign Panel with aluminurn bar
Cast Aluminum Finial, hanger,extruded aluminum sign bracket and and c,st
Lawler#9516,Ptd,Black aluminum finial.
3/4'*Bent Steel Bar Materials
Hanger,Ptd.Black
M Panel:2'-6...W x Y-KH x 1/4"thk.aluminum plate
Extruded Aluminurn Post,3"Schedule 40 pipe with Cast alum.Finial.
Sign Bracket,Ptd.Black
Hariging Bracket 2"W x 3/4"Thk,Alum.bar and Stainless
1/4"thk-Alumiraun Panel Steel fasteners,with extruded aluminum bracket.
Ptd.PMS546C
rooting:As required.
Text Graphics & Finish
White Reflective Sheeting
"Salem"Graphic Finish(All Components):
Mathews Acrylic Polyureth,me
sprayed and masked
5 04. R--6"MP12446 Text Application:Reflective Sheeting-
Symbol:Digital print on alum.panel,See Layout
Typefaces:Adobe Garamond Serrdboid.
sip W��3- M—W sw�
Colors: Panel-Dark Gray Blue to match PMS546C
Text-White
3"IPS Schedule 40 Script-Medium Gray Blue to match MP12446
Aluminum Pipe Post Trim Molding-Black
Ptd.Black Post,Finial,Base and Bracket-Black
iF
A
P
'P
lu
td
m
B'-
m
la"
c
h
m
e
P-
uI—
e 4
e0
P1%
o�
16"diameter by 48"decp concrete fc�6,g
Meter
dal
(dirwa bud2l Apost) I
wwwmetrosign.not F8X: 978.851.2022 PhONO: 978.851.2424 170 [Drum Str@01 TOWIlSbUrY, MA 01816
ftxt� hataftim , 14 d
City of Salem "Muk UNIM H.S. Mom CRY of
wuw� Salem, MA 4.27.10 ftftw J.P. ID 51,.h
unklifta 7933 '* 10-4598A1 %W
1/8" Thick Aluminum with VA-�ite Reflective Vinyl Graphics.
Back, Edges and Face Painted Black.
Logo Digitally Printed and Laminated on High Performance Vinyl.
Sign Mounted 3" Below Main ID Sign.
FURLONG PARK
- I -ol
A Coopciativc Pi cct 1-)ctwccn the City of Salem
and the Common-wcalth of Nfassachuscas
Parkland Acquisitions
and Renovations for Communities Program
Wiew.metrosign.not FIX: 978,851.2022 Phone: 978.851.2424 170 torUM Street TewksbufW, MA 91876
001ftew leftfurbow ZL-
City of Salem WNIM H.S. maw Ctt'.1 W.
;. �tWn 10 Sign.ft
Mina" Salem, MA 4.27.10 In"K J.P. OMMM"
Wd ardw 4 ; ,
H
W
E-
�- Y''
Q �
O ¢
� P..
Q
W
a.
Sca I e ni
Redevelopment
Authorltv
Salem Redevelopment Authority Decision
July 8, 2009
15 Peabody Street Park: Proposed design revisions
S—RA—Dec�ision
At their meeting on July 8, 2009, the SRA voted to approve the July 8, 2009 DRB
recommendation for the proposed design revisions to the 15 Peabody Street
Park with the condition that the sharp corners on the green space be reinforced.
DRB Recommendation
At their meeting on July 8, 2009, the DRB voted to recommend approval of the
proposed design revisions.
Salem
Rede-velopment
Authorltv
VHS
Design Review Board Proposal
July 22, 2009
15 Peabody Street Park: Discussion of revised design
Proposal
Due to existing conditions discovered during construction, the design of the 15
Peabody Street Park needs to be revised. The attached submission describes
the conditions found on site and the revised design.
SRA
15 Peabody Street Park
REVISED DESIGN PROJECT NARRATIVE
July 15. 2009
Design Evolution
The redesign of the park is necessitated by the recent discovery during the clean up process that the entire
site is significantly riddled with foundations, walls and slabs of former industrial buildings. The unearthed
slabs and walls are very thick and heavily reinforced. These remnants are considered ostensibly
immovable. In many areas of the site, due to the presence of thick concrete 'floors', meeting the proposed
excavation depths has been impossible. Further (obviously), the location of these newly discovered
artifacts has thrown a serious monkey wrench into all aspects of the approved plan for the Park. Thus, the
design team has been required to revisit the placement, elevation and footing conditions of all Park
components within the context of the new reality of the existing site.
Design Criteria
Because of the demands of the original project schedule, which was tied to funding protocol, many
elements and materials for the Park have already been purchased. The 'pre-purchased' items include: glass
pavers, all fencing materials, play equipment, picnic/game tables, benches, water bubbler, light posts and
so on. The revised site plan reflects merely an on-site redistribution of those exact items, which have been
previously approved. The redistribution is in response to what the site conditions are allowing. As part of the
remediation, DEP requires that there be three feet of clean fill in any landscaped area and one foot of clean
fill in any paved area. If a specific landscaped area cannot be excavated the necessary depth to allow three
feet of clean fill, either the area must be paved or the finished grade raised. Further, because of the
presence of an expansive concrete floor just below the surface of the ground, the zone which had been
defined as an infiltration area can no longer be such. Therefore, due to a litany of issues such as this, the
greater challenge for the design team has been to accommodate requisite site infrastructure, site infiltration,
and program components where conditions permit. Further, the reshuffling of the deck must not increase
the overall construction cost of the Park.
Description of the Park
Urban Context
The new Peabody Street Park, designed for the enjoyment of all residents and tourists, represents a
significant NEW open space and recreational amenity for the City of Salem. The figure of the Park
physically links Peabody Street to the South River and the adjacent residential neighborhood to the new
Harbor Walk. A generous network of paths, play areas and plantings have been synthesized to optimize
pleasant, safe and memorable pedestrian experiences within and through the Park. The interactions
between the various aspects and materials of the Park are tailored to engender unique social opportunities
for a range of Park visitors.
Green
Presently, the open space in the area of the proposed park is defined by expansive fields of asphalt and
parking lots with marginal planted areas intermittently sprinkled throughout. The new Park will provide much
needed punch with respect to the creation of meaningful green space in an otherwise very dense, urbanized
neighborhood. In addition to increasing diversity of bird life in the area, a large grove of canopy trees will
provide cooling shade during the summer months and dramatic color throughout the fall. Expansive planting
areas will provide pleasing views, interesting colors and textures and otherwise pleasant places to sit and
visit. Further, the significant planting beds will provide infiltration areas for storm water which would
otherwise migrate across the site, creating an environmental nuisance.
Program
The park is designed to be intensely used. A range of sculptural ground plane materials will accommodate
a variety of prescribed program opportunities, passive recreating and built-in opportunities for programmatic
invention. The weave of program elements has been designed to create a cohesive and comprehensive
sense of place for the Park. Durable materials and simple detailing will also ensure the long term vitality and
vibrancy of the Park and reduce costs associated with Park maintenance.
Archeological Frame
A zigzagging concrete wall meanders through the site, referencing the site s industrial past by exactly
tracing the figure of former factory buildings. The series of low concrete walls provides a basic and clear
spatial structure for the Park and visually links Peabody Street to the new Harbor Walk. Further the walls
serve to define programmatic boundaries and overlaps, thresholds, places to sit, and, more generally,
contribute to a unique Park identity. Art tiles, made by area children, will be mounted intermittently to the
walls throughout the Park.
Park Areas
Peabody Terrace is located adjacent to Peabody Street. Three generous openings in the perimeter seat
wall provide a clear and urbane Park threshold. The lush and cooling experience of Peabody Terrace is
defined by a thick grove of trees (up-lighted), ground covers, earth forms a-id stone dust pathways and
several park benches. The pervious ground plane will also double as the a,ea of infiltration. A catch basin
will be located within the Terrace and be connected to the City storm drain at the street. This is the only
zone on the site where the DEP 3' of excavation was able to be achieved. Accordingly, it has become the
prime spot for the majority of the tree planting and where reasonable infiltration can be expected. By
grouping together significant plantings, benches and multiple pathways, a very inviting street side park-let is
created.
Children's Play Court
The center of the site is defined by an area of active use, primarily by young children. Top of the line play
equipment will provide a variety of recreational opportunities for a range of ages. Interactive sculptural ea-th
forms subtly reinforce the zone of the Play Court while brightly colored rubber paving provides a visually
stimulating ground plane and a more comfortable surface on which to play. From wood benches and
sections of the archeological frame seat wall, parents and/or supervisors will be able to sit and watch the
children playing. Carefully positioned openings between planted areas ensure appropriate connectivity tc
all other zones of the Park.
The Play Court is situated where the infiltration zone of the previously approved scheme used to be.
Because of the existing slab below grade, infiltration is impossible, as is the planting of large trees, which
had also been proposed for the area. Consequently, this area favors the use of impervious materials and
the planting of smaller plant materials.
Riverside Picnic Terrace
A series of picnic tables will be placed on an expansive mosaic of glass pavers at the edge of the South
River and result in the creation of a great place to sit and visit. The new design will optimize views back to
the City and out to the Harbor and establish a highly vibrant and social interface between the zone of the
park and the zone of the Harbor Walk. The glass pavers, which in the previous scheme were evenly
dispersed throughout the entire Park, have been gathered in the north/east corner of the site and will
engage a more limited planted area as well as the pavilion structure. The new scheme exactly reflects the
number of blue metal tables that were in the approved scheme.
Peabody Street Park Corridor
The pedestrian corridor provides direct linear connection from Peabody Street to the Riverside Picnic
Terrace, the Pavilion and the Harbor Walk. Situated along the easterly side of the site, the hedge lined
walkway will also provide opportunities for sitting on park benches, and unobstructed views through the
Park, exactly as it was in the previously approved plan. The pathway will be well lighted, with the placement
of fixtures also unchanged in this scheme. The water bubbler will be located at the southern most edge of
the Corridor, just in-board from the Peabody Street entrance.
SOUTH RIVER
HARBORWALK
CANOPY
SAME LOCATION AND
TYPE AS ORIGINALLY
SPECIFIED
GLASS PAVER PLAZA
CONCRETE SEAT WALL W1 PLAY TABLES
(AS CONSTRUCTED) (SAME SQUARE FOOTAGE
AND COLORS OF PAVERS
GRASS MOUND SAME TYPE AND QUANTITY OF
(SMALLER THAN TABLES AS ORIGINALLY
ORIGINALLY SPECIFIED SPECIFIED.NEW LOCATION)
SAME GRASS SPECIES,
TREE PLANTING AT HIGH
POINT)
SEA GRASS PLANTING HEDGEIVINESIFENCE
(UNCHANGED FROM
(SAME SPECIES FROM APPROVED SCHEME)
ORIGINAL DESIGN)
PLAY AREA
RUBBER/STONE DUST
(SAME SQUARE FOOTAGE ADDITIONAL GRASS MOUND
AND PLAY EQUIPMENT (SAME GRASS SPECIES
FROM ORIGINAL DESIGN) AS SPECIFIED FOR
ORIGNIAL GRASS
MOUND WITH TREE
u, PLANTING AT HIGH
POINT)
CONCRETE SEAT WALL
(AS CONSTRUCTED)
STONE DUST PATHWAYS
CONCRETE SEAT WALLS (RECONFIGURED)
(AS CONSTRUCTED)
1D (8)BENCHES
(SAME TYPE AS ORIGINALLY
SPECIFIED)
ADDITIONALGRASS MOUND (4)POST LIGHTS
(SAME GRASS SPECIES AS (SAME TYPE AND
ORIGINALLY SPECIFIED, LOCATION AS
TREE PLANTING AT HIGH ORIGINALLY SPECIFIED)
POINT) NEW INFILTRATION BEDS
(GROUNDCOVER AND TREE
PLANTINGS)
RELOCATED BUBBLER
CONCRETE SEAT WALLS
CONCRETE SIDEWALK (AS CONSTRUCTED)
EXISTING TREES TO REMAIN
PEABODY STREET
PEABODY STREET PARK- REVISION
6RA July 15, 2009
Scale: 1/16" = 1'-0"
LANDWORKS STUDIO, Inc.
x
amp__--
)d
Mon
VIEW OF RIVERSIDE PICNIC AREA LOOKING TOWARD DERBY STREET
LANDWORKS STUDIO, Inc.
July 15, 2009
xt j'�
bi
-T
IL t-
'4K
14'
VIEW OF FRONT ENTRY COURT AT PEABODY STREET LOOKING TOWARD POWER STATION
LANDWORKS STUDIO. Inc.
July 15, 2009
VIEW INTO PLAY AREA LOOKING TOWARD PEABODY STREET
LANDWORKS STUDIO, Inc.
July 15, 2009
j
VIEW FROM PEABODY STREET ENTRANCE LOOKING TOWARD SOUTH RIVER
LANDWORKS STUDIO, Inc.
July 15, 2009
TTL'
TEAM
and.,rk, studio
Utile
T.1-
AA. A.
Vine
1E
Simpson Gumpertz
&Heger
T
AA.
STAMP
�MWN W H
P�T�AT�MINT�
I...�T FAI..
�F T�E M CRIGI�Y
1�.11�AT
SA��C AAD L�l�
AS�I�NAALY�ACIFIFDI rl
A.
C.A�� RELMA�W�M 15 �y st�t
M.WMI PWn
Ll .1
15 PEABODY
ST. PARK
S.I�,MA
Cit,M SM..
A 0.di.
utile
Vine
"waso pip
MINIZ,!ft
15PEABODY
STREET PARK
City of Salem
OM I T�M
andwork, studio
utile
jr
-ALI
Vine
,!,4; studio
-.00, utile
bib,
Vine
AL
Simpson Gumpertz
&Heger
ST�
4,
lsp�ys�l
1/2' 71:1 105-60
95 ( 105-30
1/2, 4*. 4* (NOM) SLATS
( SEE WOOD OPTIONS
IB, 3/8' 4 1/2*
3/0. x 2'S. SIL SrL BAR 2 71r OD
BUTION SOCIO Hl)� SrL PIPE
LAG SCP W/WAS
1/2 3'
I/ STL BAR
t12- 47'( 105-60 if
— 12. 14* 67- ( io&-BD 14'
11 S-2 SURFACE WLOR�C HOICES FOR POWDER.C.Q.A.T.F�1�1�H
C
B BLAC--KID DEEP RED
0
Cl ALMOND El WHITE
0 HUNTER GREEN 0 GREEN(DARK)
0 BLUE D LIGHT BLUE
SUPPORT POST D HERITAGE BROWN 0 BRONZE
CI ARGENTO
19 7/8'
12' 0
5-1 EMBEDME
SUPPORT POST
TNT/ 1/2' x 3 sn. BAR LENGTH OPTIONS
-------- ;9 6' BENCH
0 8' BENCH
C3 S-4 SUB FLOOR
NOTES WOOD OPTIONS
1.) ALL STL. MEMBERS COATED W/ ZINC RICH EPDXY THEN �CLR ALI HEART REDWOOD 54S EE
FINISHED W/ POLYESTER POWDER COATING. 0 'C' & BTR. DOUGLAS FIR KD S4S EE
2,) ALL WOOD MEMBERS TREATED W/ CLEAR PRESERVATIVE- Ei-�EAR WESTERN RED-CEDAR-S4S-EE
3.) 1/2' X 3 3/4" EXPANSION ANCHOR BOLTS PROVIDED -0 OTHER
FOR S-2 & S-4 OPTIONS.
IN�ON E TITLE BENCH
DATE DRAWN 1/18/97
DRAW NG
EDuMor-, inc . DRAWN BY All REV. NUMB I ER "T
DATE REV. 1/14/05 105 SERIES SH
P.O. Box 142 MUffintown, PA 17059-0142 REV. BY : AWN D I OF 2
1/4-X 2-
STL W
1/4'X 2-
STL BAR
3/8-SSIL
%U
RAT Wk z
COLOR CHOICES FOR PO gR-COATFINIS
�LACK U umc�� �
MBLIVIOND WHITE
[I HUNTER GREEN GREEN(DARK)
[I BLUE LIGHT BLUE
[3 HERITAGE BROWN BRONZE
[I ARGENTO 3/8'X 2-S.STL OTN.
NOTES 59. HD.LAG SMN
1.) ARMREST COATED W/ ZINC RICH EPDXY THEN FINISHED
W/ POLYESTER POWDER COATING.
2.) LOCATE ARMREST 4" MIN FROM EDGE OF SLAT TO ARMREST HOLE
CENTER AND MARK HOLES ON SLATS.
3.) FIELD DRILL PILOT HOLES FOR LAG SCREWS, SEE CHART.
0 0 DATE DRAWN 06/20/08 TITLE
DRAWN BY ESS - ARMREST HARDWARE-
DuMor, inc. DATE REV. - REVISION A DRAWING 105-OOAR
P.D. Box 142 M=ato", PA 17059-0142 REV. BY INUMBER
F 4 q Salem
Redevelopment
1 f7F
Salem Redevelopment Authority Decision
December 10. 2008
15 Peabody Street Park: Proposed design revisions
SRA Decision
At their meeting on December 10, 2008, the SRA voted to approve the
November 12, 2008 DRB recommendation for the proposed design revisions to
the 15 Peabody Street Park with the exception of the bench design which will
change to discourage people from sleeping on them (e.g., having dividers in the
middle and arm rests at each end).
DRB Recommendation
At their meeting on November 12, 2008, the DRB voted to recommend approval
of the proposed design revisions with the understanding they would review a
subsequent iteration of plans showing details on four items: the Peabody Street
entrance by the stone dust, the canopy, the corner return of the art wall, and the
method of affixing the art tiles.
Staff Comment
The DRB reviewed the subsequent iteration of plans on the four details on
November 19, 2008 and provided feedback.
Proposal
The construction bids for the original proposal exceeded the available funds by
approximately $200,000. The design has been simplified to reduce costs while
still meeting the community's goals of having a mix of park amenities and
connections to the South River and Point neighborhood.
I-A
p EABLD
0 y
REET PARK
f Ity of
ly of Salem
-j
uble
Vine
SImpron Gumpeti
I &Heger
15 Pwbody
Ll.1
----------
andwo,ks studio
Utile
Vine
Sirnpson Gumpertz
&Heger
ST�
lsp�ys�
"Ywtp�
------------- ----------------
----------------------- L1.2
landworks studio,
Ale
Vine
Simpson Gumpertz
&Heger
15PEABODY
STREET PARK
City of Salem
and,o,ks studio
Uble
Vim
Simpson Gumpertz
&Heger
14
lanff�i�r" studio
2
Utile
Vim
Simpsor�Gumpertz
3 &Heger
w
4 6
15�y S�
P.WQ�
L3.1
11 -TI, . I
9 H
0, IN I -�g 11 V , I
;,0 1§111 1 if
1P.- I I E
W7 04
-6
0 p
zl
Ik
landwork., studio
Uble
Vine
Simpson Gumpertz
&Heger
15 PeabMly
L3.3
landworks studio
utile
ell
Vine
Simpson Gumpertz
&Heger
9: 1�
TqU7P.lJJJ. L
2
K�ww
IIPE�BODY
STREJPARK
T�. MA
CRY of Salem
la,id�wks studio
01
Able
Vine
Simpson Gumpertz
&HKer
----------------------------
15 P..b.1y
Ad Id.D�.W
1-3.5
2
ond�wks studio
az�,
uUle
I A l.1.1 11111�6 (�IPVFJ
Vine
4 1- Simpson Gumpertz
2 &Heger
................__
............
lancl.wk, studio
FrLr
Utile
Vine
§11—mioson Gumpertz
Ll I &Heger
ST�
03 ' 4
SteFurnishingsDuu,11s,
Pl. E�aw
6 7 L3.7
landworl,s studio
Ar
Utle
Zt
Vine
I L
-7,
9"EWI I
t Simpson Gumpertz
&Heger
9
site FUMIshings DMIls
L3.8
land.o,ks studio,
F�
We
2 3
Vim
Simpson Gumpertz
&Heger
TMEM�
AT�W�
5 P.6.dy S
4 L3.9
and,,wk� studio
Uffle
Vine
Simpson Gumpertz
&Heger
Campy RenderingB
L4.0
15 PEABODY
ST.PARK
�..MA
utile
Vine
15 PEABODY
ST. PARK
utile
Vine
15 S��.
- M=
15 PEABODY
ST. PARK
Sa�..MA
My&�mm
utile
Vine
15 P.�y
15 PEABODY
ST. PARK
IF
"T �lf' 7 -k utile
It
Vine
too
to)
I
It
d, aws.6`4
13 .4 .
4 fa
("54) 4
15 weit
mr�rrrl
IS PEABODY
ST. PARK
Salem.M
City of Salem
�Wrfi.
"re"."t
utile
Vine
IVA
��at,Wy$treet
ArtWat
15 PEABODY
ST. PARK
S.Ion.,MA
City of Salem
k �studio
"T,
utile
17140
Vine
—1—aa
k
S,FI�10W,
15 PEABODY
ST. PARK
utile
Vine
EW-
Ali-
Salcin
Redevelopment
C= AuthoritNv'
Salem Redevelopment Authority Decision
Junell , 2008
15 Peabody Street Park: Final Design
SRA Decision
At their meeting on June 11, 2008, the SRA voted to approve the May 28, 2008
DRB recommendation with the stated condition for the final design plans for the
15 Peabody Street Park.
DRIB Recommendation
At their meeting on May 28, 2008, the DRIB voted to recommend approval of the
Firal Design plans with the condition that the DRB participate in the review the
proposed artwork for the wall.
Proposal
Salem received a grant from the State to complete the design and construction of
a new park at 15 Peabody Street. The City recently selected a team of design
consultants led by Landworks Studio to complete the park design by early
summer of 2008. The design team will build from the schematic design created
by Tufts University graduate students in 2007.
At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA
spoke favorably of the design and referred it to the DRB for schematic review.
The SRA waived its procedures and approved having the proposal stay with the
DRIB through final design before returning to the SRA for final approval.
Design Review Board Recommendation
May 28, 2008
15 Peabody Street Park: Discussion of proposed Final Design
DRB Recommendation
At their meeting on May 28, 2008, the DRB voted to recommend approval of the
Final Design plans with the condition that the DRB participate in the review the
proposed artwork for the wall.
Proposal
Salem received a grant from the State to complete the design and construction of
a new park at 15 Peabody Street. The City recently selected a team of design
consultants led by Landworks Studio to complete the park design by early
summer of 2008. The design team will build from the schematic design created
by Tufts University graduate students in 2007.
At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA
spoke favorably of the design and referred it to the DRB for schematic review.
The SRA waived its procedures and approved having the proposal stay with the
DRB through final design before returning to the SRA for final approval.
Page I of I
TUF IS L 11D
Print
( lo�c
http://mbta.com/templates/image_popup.asp?imgsrc=`/`3Cimg+alt`/`3D`/`22Art+Unveiling2+lg`/`22+src... 5/28/2008
Page I of I
i 1z
dl
David Aucoin Laurinda T. Bedingfield Julie Furbusb
Julie Furbush Alice Grossman Ryan Klemek
r
Irp ,
Charles Marchany Simi Rabinowit/. GregoryVantz
print
Close
http://mbtalcom/templates/image_Npup.asp?imgsrc---�/�3Cimg+alt`/�3D�/�22Art+Unveilingl+lg`/�22+src... 5/28/2008
Salem
Redevelopment
Authorltv
Design Review Board Proposal
Referred from Salem Redevelopment Authority
Apn123, 2008
15 Peabody Street Park: Discussion of proposed Schematic Design
Proposal
Salem received a grant from the State to complete the design and construction of
a new park at 15 Peabody Street. The City recently selected a team of design
consultants led by Landworks Studio to complete the park design by early
summer of 2008. The design team will build from the schematic design created
by Tufts University graduate students in 2007.
At the March 31, 2008 Point Neighborhood Association meeting, the design team
worked with residents to refine the park design. The final park design will be
based on comments made at the March 31 meeting and will be presented at the
April 28 Point Neighborhood Association meeting. David Jaquith volunteered to
attend the neighborhood meetings to serve as a liaison between the community
and the DRB.
At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA
spoke favorably of the design and referred it to the DRB for schematic review.
The SRA waived its procedures and approved having the proposal stay with the
DRB through final design before returning to the SRA for final approval.
PROJECT
15 PEABODY
ST. PARK
Salem, MA
City of Salem
wee,co,H.11
93 Wastriogl0r,Street
Side..MIA 01970
�.978.745.9595
reivr�oore
TEAM
studio
112 Slrd�ut ir�onue,Studio 6S
Beside.MA 02118
11,.617 426�3030
F.617 426.3033
10 Dedd,Situate.4M Riede
Saleve,W 01970
P.978 745.7181
&W.0.0,104bilft.
I.AN�AK ARCHITTICT
u t i I e
ARCHITECTURE-URBAN DESIGN
30 Som"eur st�
Guidon.MA 02110
lit.617,423.7�
F:617.423.1414
.,.Uwd..w
URB&v DESIGN
Vine
ASSOCIATES,INC.
372 Me"Ieeec street
11,.978.465.1428
F,978,466,2(So)
�L ENGINEER
STAMd
15 APR 08
Peabody Street with surrounding context PROJECT NUMBER
0803
PROJECT
15 PEABODY
ST. PARK
Salem, MA
City of Salem
Salem oty�1(
93 ft,h.�,I.n Sa,"t
�,m MA 01970
978.745�9595
TEA
i, T i . studio
112 Sh.w..t A�.,Slud�.68
Bwtom MA 02118
P�617.42&3030
F,617AM.W33
10�rby SWare.4W Sm
��.W 01970
978 745.7181
IL*N�ARCHFTE�
utile
MCHrTECTURE-URBAN DESIGN
30�m�,Su.t
Ovaon,W 02110
P.617 423.7�
P.617 423.1414
T-) uU"..W.M
URBAND�IGN
V i n e
ASSOCIATES,INC.
372 M.11.�u S11.1
N�W�n,IM 01950
k 978 465.1428
F.978 465 2640
CML ENGINUR
4
LEGEND:
1. Street Porch STAVId
2. Rernediation Grove
04-APR-08
3. Mosaic/Mural Wall
4. Play Patch
5. Boardwalk
6. Gathering Mound PMECT NUMBER
0803
7. Riverfront Porch 15 Peatocy SI,cc!plan
8. Harborwalk
9. Canoe Launch
10. Tidal Garden
-----------
- - --------
PROJLCT
1.5 PEABODY
STREET PARK
Salem. MA
City of Salem
Sal..W0070
EXISTING HAR13ORWALK
TEAM
-T
FUTURE BOAT LAUNCH studio-
-7 1 Ma�ut A�.Stlxlic,w
B,V..MA MUS
10 Nala,ScIl 4M Raca
Sale..IM015)70
—POURED IN PEACE CONCRET PLAZA P.97B.745.7181
OCEAN GRAS PLANTING LANDSCAPE ARcmnlECT
S
N MOUND
utile
STOOL SFAMNG
BOULDERS — scnton.MAW110
R6174217"
PII51L423.1414
URBAN DESIGN
MURAL I MOSAIC WALL V i n e
AMMTES.W.
372�ilmacSlvatet
N..," MAO�
R 9 4 SAlISS
F.978
CONCRETE BENCH
CNIL ENGINEER
PLAY AREA FENCING
COLORED POURED
RUBBER SURFACE
REMEDIATION GROVE
CONCRETE UNIT PAVER
WALKWAY RAILING
STAW
4 v TREE GRATE
15-APR-08
PROJECT NUMBER
BENCHES AT STREET EDGE L 1 M03
15 Peabody Street Site Plan
3")
PICNIC I GAME TABLES
_JQ
FENCE AT STREET
POURED IN PLACE
CONCRETE PLAZA
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
�1W.01y'lam
ft�h.o.st'.1
't.,MAOA70
978.7,tS.%95
TEAM
studio-
112 ShawMUI AAAue..SbA�68
OsAWNWO211
to Nfby sqw1e.4th FWs
SAN,MA 01970
9T&74S.7JU31
LANDSCAPE ARCHITECT
utile
�W.MA02110
P.617.423.7200
R 617.4211414
Park Cross S� URBAN DESIGN
0 4' 81 16' 32'
�g�g-- -gvine
AMMTES.W.
372 MerArtac Str�
N�q,w.MAO 950
P.97i.46511428
P.978 465,2640
�,�.C=
CMIL ENGINEER
2P,rk Cross S.L. 1/8' IV
a 4' a 16' 32
STAMP
15-APR-08
PROIrCT NUMBER
L2 OffD3
Peabody Street
Sections
7
�'�Nk�
3 Paric Lonptudinal SW" 3/3r IV*
0 f W 16'
f—I
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Sal�cilyl4all
93 Waahi��
i8k,�.WOI 9 70
7
97&745.9595
TEAM
studio-
112�.w oW...SWdb 613
�,W wl�
617.426.W3O
P.617A26AOM
10�arby Squaa�4�Fickv
W 01970
P.978.745.7181
LANDSCAPE ARCHrrECY
utile
Raiaed Walkway�onomtnc 3 Gl..Pay.,Plan Dal.,l
�n.MA 02M
It.617.423.7�
R.61IA2�1414
URBAN MIGN
9�M Vine
MS"TES,INC.
372 M..l,StakA
lk.978 1428
F.978.465.�
CIVIL ENGINEER
4 Waaau Glass 8'14axa�nal Pavera
0
91ANIP
pay�
Mo�Bed -L- I I I I I I 15-APR-08
B"Edp L3
Raised Walkway Details
Rebar
Cmshed A4dgaw Baso
C-Vw*ad SW
ff 1. 2 —4!
2Rla�.d Walk.,�h.n 0�1.,l 1"=I
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City Of Salem
wo'mctywl
S"mW01970
R 978 745.9595
I
TEAM
studio -
112 Sf—mut A�n�&W�Ga
Bwt...W 02WI
k 617.426.W30
P.617.426.3033
10�by Sq�m.4�F�r
w 01970
P.978.745.7181
LANDSCAPE ARCHITECT
Utile
�qETFURE-U��
30su...'�
�W,MAOMO
P.617.423.7�
F.-617 423.1414
URRAN DESIGN
ASSOCIATES,INC.
Mural Wall RearVi,wAxonornetric 4Mural Wall Axonometric
5Mural Wall Perspective
N�n
F.978.465,2"0
CML ENGINEER
fr-W MAX
31 3'
STWP
L4
Murat! Mosaic Wall
N
L —1 L -J L —1 L�-J A .-:7-
2Green Screen Full Height Section Detail 3Green Screen/Mosaic Section I Elevation Details 1/2" V-0"
PROJECT
15PEABODY
STREET PARK
Salem,MA
E? Compacted Granulw
Compacted[Ag9tegate City of Salem
�I�Ca,A
Compacted S., 93washingtonstz"
5 W..MAOM0
ftag'78_74t5�95
TEAM
ANGLED FIELD 3W IV studio-
11-t �-T tT' h I i 112 Shawreut ewenue,Saxte,M
31� 21� 1W TXT SQUARE STEEL POST IW F.617.426.�
'XT RECTANGULAR STEEL HANDRAIL 10(Nab,,Square,ft�
0 F 11Y 20'
SQUARE STEEL MEMBERS 3PLAY AREA FENCE AND PAVING S Ien,.MA M70
agT&745.7�
LANDSCAPE ARCHffECT
u t i I e
�I�T�,��ICh
30SUMM rstreet
�Ioq,=O�O
k.617.423.72()()
HORIZONTAL GRADIENT BOTH OPTIONS TO HAVE BLUE 3/4" F.617.423 1414
POWDERCOATING
2'
PLAY AREA FENCE OPTIONS UWAR VESM
��:Wine
413LUE PowDERcoATNG SAMPLE AMMATES,W.
3T2Ma`rjMacSIrM
FENCE TO BE BLACK OR BRONZE N�Uqp.rt.MAO�
ik�978.�i428
ONGUARD STARLING FENCE SECTION 3 979.465.2MI)
RAJL AVAdLABLE THROUGH FENCE TOWN
=TT_ 1.8813.FENCETOV�.
VWAVVFENCETOWN COM CIVIL ENGINIEER
2FENCE AT STREET
15-MR-06
PROJECT NUMBER
L5 08M
15 Peabody Street Play
Fencing Details
7
5 PLAY AREAFENCE MON 1 IV
i._7
0 5 10, 2(Y
PROJECT
15 PEABODY
STREET PARK
Salem,MA
Broorn firush pour in place concrete with two color ldho- City of Salem
chrorne hardener finish U�cftyH.q
s�.WO1970
P.8978.745.9595
TEAM
studio-
617.426.3030
F.617.426ZM
POURED IN PLACE CONCRETE COLOR 10�"S1.1,4th
Sa� ��01970
TREATMENT TO BE: 97Z745.7 181
SCOFIELD LITHOCHROME CONCRETE
HARDENER LANDSCAPE ARCHITECT
LITHOCHROME Color hardener is used to -------
add beautiful color—vibrant or subtle—into
the surface of freshly placed concrete-This utile
ready-to-use, powdered dry-shake harden- ARcW--VrURE-JRM4DESM
ers produces a long-wearing horizontal wsummw�
Bostar.MA 02110
surface ideal for pedestrian or vehicular ft 617 4M 7�
P 617.423A414
traffic-indoors or out.
Use of LITHOCHROME Color Hardener URBAN DESIGN
results in increased abrasion resistance and
higher compressive strength for hard land-
scapes. V i n e
ASSWATES,INC.
Poured in Piace Concrete Plaza North -0" 372�.SU�
a, W V IV 37 ��Wo�
Bridge Blue" k9m,165.142II
F.978.465.26�10
CIVIL ENGINEER
"Royal Blue"
"Chalk Blue"
STAIMP
15-APR-08
PROJECT NLIMSER
L6 0803
Concrete Plaza Details
2Poured in Plaw Concrete Pjaza South va,1-01
3Z
Past Project Images using LITTHOCHROME concrete hardener
T-�
PROJECT
15 PEABODY
ST. PARK
Salem, MA
City of Salem
Salem city Paul
93 WaShIngtor Street
Selara.MA 01970
P.978.745.9595
TEAM
landworks studio-
112 Shavranut Avenue.Snake 613
Bovtoa.Mh 02118
P.617.426.3030
F:617.426.Mn
10 Derby Square.4th Floor
Seem.MA 01970
LANDSI ARCHMECT
u et 11 le
ARCHITECTURE-URaAN DESIGN
30 St,,.t
HUSIOFI�VIA 023 10
R 617.4 233 200
F;617A23.1414
URBAN DESIGN
� Vine
z��ASSOCIATES,INC.
Moselc Wall wftb Green Solvent Play Patch from Boardwalk 372 Mqorrr.�Street
Newber,poM W 01950
�.978.465.1428
P.978.465.2W
..vinieleseebliblen.t
CML ENGINEER
STAMd
15-APR-08
L 7 PROJECT NUMBER
15 Peabody Street PhotograPhic
Mounduages
cE,
Park from across South River Mosaic Performance Wall with Gathering Mound
74�_
Salem
Redevelopment
Authorltv
MEMORANDUM
TO: Members of the Salem Redevelopment Authority
FROM: Tom Daniel, Economic Development Manager
SUBJECT: 15 Peabody Street Park: Schematic Design Review
DATE: April 3, 2008
CC: Lynn G. Duncan, Executive Director
Attached please find information regarding the proposed park at 15 Peabody
Street. Salem received a grant from the State to complete the design and
construction of the park. The City recently selected a team of design consultants
led by Landworks Studio to complete the park design by early summer of 2008.
The design team will build from the schematic design created by Tufts University
graduate students in 2007.
At the March 31, 2008 Point Neighborhood Association meeting, the design team
worked with residents to refine the park design. The final park design will be
based on comments made at the March 31 meeting and will be presented at the
April 28 Point Neighborhood Association meeting.
The recommended action is to refer this item to the Design Review Board for
Schematic Design Review. Because of the tight timeline, we are requesting that
the proposal then return to the Design Review Board for Final Design Review
after which the item would come to the SRA for final approval.
Please feel free to contact me at (978) 619-5685 or tdaniel@salem.com should
you have any questions or concerns regarding this matter.
Public Park at 15 Peabody Street
Project Narrative
Introduction to the project
The schematic design for the park at 15 Peabody Street Park follows on the coattails of a concept plan
developed by the City along with graduate students from Tufts University in the Spring of 2007.
Working together with the Point Neighborhood, the team developed a plan which identified all of the
programmatic goals and elements desired by the community for the park. The park site is bordered to
the north by the South River, to the east by the National Grid power sub-station, to the south by
Peabody Street, and to the west by the Beverly Coop Parking lot. The park intersects the proposed
Harborwalk which runs from Derby Street along the southern length of the channel. The site is
classified as a brownfield and the project includes appropriate remediation for this parcel.
Design Concept
The park design is predicated on the concept of an urban front porch. The park is both a front porch for
the Point Neighborhood as well as a link for the city at large back into the neighborhood. Two large
paved urban plazas, or porches, enable large gatherings and concentrated social spaces. The
Waterfront Porch is along the northern edge of the park and is intended to serve as a space for
performances and large gatherings. The northern edge of the plaza could be configured, in a future
phase, to allow for an access ramp down to the water for launching kayaks, canoes and other small
crafts. The Peabody Porch is located along the southern edge of the park and is occupied by game
and picnic tables and becomes a strong active social edge along Peabody Street.
The remediation aspect to the project has become an integrated part of the design. Wedged in
between the two plazas lies a large green area created by one strong gestural cut and fill maneuver.
The cut creates a low point which will provide an area for storm water collection and management. It
also creates the opportunity for a beautiful garden showcasing species which contribute to the
remediation of the soil and filtration of stormwater. The displaced soil, the fill, is reused on site, along
with necessary planting medium, to create a large lush green gathering mound along the waterfront.
This mound can be used for sunbathing or gathering to watch an outdoor movie or other performance
along the water. A slightly raised passageway crosses the remediation garden and connects Peabody
Street to the Harborwalk. A small playground, the Play Patch, is located to the east of the remediation
garden and consists of play equipment, a brightly colored poured rubber surface, and a low fence for
protection. The poured rubber surface spills out of the play area and meets a ten foot high
mosaic/mural wall. This colorful and performative wall screens the park from the National Grid power
station. The first lower four feet of the wall is a green screen mesh material which allows planting/vines
to grow up the surface. The actual mosaic/mural would sit above the green screen and make up the
next six feet of wall. Bending along the entire eastern edge of the park, the wall allows the mural to be
visible from different angles around the site. Seating is scattered throughout the park and integrated
into each of the experiential elements. Benches are built into each end of the wall, and small concrete
stools are concentrated along the raised walkway through the remediation garden to create an
opportunity to stop and socialize along the walk.
Project Timeline
The design work for the park is set to be complete with construction drawings and bid package at the
beginning of June, Prior to that date the project will be reviewed by the Design Review Board, the
Conservation Commission as well as three meetings with the community. The first of those meetings
was held on March 31s. Construction will commence on the park late summer of this year and will be
completed in its entirety by June of 2009.
PROJECT
15 PEABODY
STREET PARK
Salem.MA
City of Salem
Salem City Hall
93 Washington Street
Salem.MA 01970
P.978.745.9595
TEAM
landworks StUdio-
112 Shawmut Avenue.Studio 68
Boston,MA 02118
P.-617.426.3030
F-.617.426.3033
10,Dert)y Square,41h Floor
,�MA 01970
!78.745.7181
landworks-studlo.corn
u t i I e
ARC.HJFC-.1AF-URRANOM11A
V i n e
AM"TES,INC.
S
i,—,
LN
Peabody Street Park surrounding context map.
PROJECT
15 PEABODY
STREET PARK
Salem.MA
City of Salem
�iaiem city Hall
93 Washington Street
Salem.MA 01970
P:978.745.9595
TEAM
studio
WIN wqw
112Stia.mutAvenue,StUC1Io6B
Boston,MA 02118
P.617.4 26.3030
F:617,426.3033
10 Derby Square.1tn Flwr
Salem,MA 01970
il 078 745 7181
t.. www.landwork�studio.com
JI, u le
ARCHITEGIURE-URBAN DESIGN
V in e
All
MSOCATES,INC.
-ma�
. . .........
cl
Existing Site Photos
PRCI-Irff
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem city Hall
93 Washington Street
Salem.MA 01970
p-978,745.9595 TEAM I
Iinchijrifk.-1 studio-
112 Shawmut Avenue.Studio 68
Boston,MA 02118
P-.1511,42bJU3U
F:617.426.3033
7 10 De"Square,4th Floor
8
Salem.MA 01970
P:978.745.7181
v,%nv.Iandworks-s*udIoxom
u t i I e
AR,-JEOuRE-uRBAN DESIGN
� Vine
LEGEND: MSOCIATES,INC.
1. Street Porch
2. Remediation Grove 4
3. Mosaic/Mural Wall 3
4. Play Patch 2
5. Boardwalk
6. Gafhidnng-MouDd
7. Riverfront Porch
—"aft.rwalk "J�
9'� 6arfo-e- -a n
�O.Tidal tGaurd
PROJECT
15PEABODY
STREET PARK
Salem,MA
City of Salem
Salem Cfty Hall
93 washington Street
Salem,MA 01970
Ft 978.745.9595
Ll TEAM
landww' studio
112 ShawmUt Avenuc.Studio SIB
=3 a 13�ton,MA 02118
P:617.426.3030
F:617.426.3033
10 Derby Square,4th Flwr
Salem.MA 01970
P:978.745.7181
�Aandwork"bjclioxom
u t i I le
ARCHITECTURE-URBM DESIGGN
V i n e
ASS"TES,INC.
ik*4
Ads
1. STREET PORCH
PRO JECT
15 PEABODY
STREET PARK
Sal�m.MA
City of Salem
Salem City Hall
93 Washington street
Salem.MA 01970
P:978 745.9595
TEAM
landwf)rk, Studil
112 ShaWMUt Avenue.Studio 68
c=i Boston.MA 02118
P:617.426.3030
F:617.426.3033
10 Derby Square,4th Floor
Salem,MA 01970
P:978.745.7181
�w.fandworlk"tudloxom
u t i I e
ARCHITECTURE,URBAN DESIGN
rill �--�� Vine
:Z:�— &%OCIATES,INC.
L
Roo
2. REMEDIATION GROVE
PROJECT
15 PEABODY
STREET PARK
Salen,,MA
City of Salem
Salem C'ly H111
93 Washinglon Slf,et
Salem,MA 01970
P:978 745 9595
TEAM
f studio
f 112 Shawnut Avenue.Studlo 68
Bo�ton
P:61T426.3030
F:617.4263033
io Derl)y Square,4th Floor
Salem.MA 01970
P:978 7453181
w,landworks-studlo.com
u t i I le
W
ARCHITECTURE JRaAN DESIGN
V i n e
ASSOCIATES,INC.
Pill -"qq-
ro
00-4,
L
3. MOSAIC MURAL WALL
I�CT
15PEABODY
STREET PARK
Saiem,MA
City of Salem
Salem Crty Hall
93 WaShingion street
Salem,MA 01970
.19 P:978.745.9595
-j
TEAM
studio-
112 ShaWMUt Avenue.Studio 63
IN-g--D E . Boston,MA 02118
P-617.426.3030
F:617.426.3033
10 Derby Square.4th Floor
Salem,MA 01970
P:978.74 5.7181
vnvw.landvvork"tudlo.com
utile
ARCHITECTURE-UFeAN DESIGN
\�d
V
ine
ASSMUTES,WC.
0
E
4 1
4. PLAY PATCH
PROJECT
15 PEABODY
STREET PARK
Salem.MA
City of Salem
Salem Day Hall
93 WaShIngton Street
Salem,MA 01970
P:978.745.9595
TEAM
studio
112 Shawmut Avenue.Stucho 613
Boston.MA 02118
1-.617.426.3030
F;617.426.3033
10 Derby Square,4th Floor
Salem.MA 01970
P:978.745,7181
�.Iandworlks-studloxom
u t i I e
ARCHITECTURE URBAN DESIGN
V in e
ASSOCATES,INC.
0 0 — D
5. BOARDWALK
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem City Hall
93 Washington Street
Salem,MA 01970
P:978.745�9595
rEAM
studio
112 ShaWMUL Avenue,Studio 6B
77-1 Boston.MA 02118
P:617.4263030
F;617.426.3033
10 Derby Square,4th Floor
Salem.MA 01970
P:978.745,7181
�w.landworlk�tudloxom
u t 11 e
ARCHITECTLRE-URBAN DESIGN
V i n e
ilISSOCIATES,WC.
6. GATHERING MOUND
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem City Hall
93 Washington Street
Salem,MA 01970
P:978.745.9595
TEAM
landwor�- studio
112 Shawmut Avenue.Studio 6B
a I Boston.MA 02118
P:617-.426.3030
F:617.426.3033
10 Derby Square,4th Floor
Salem MA 01970
P:978.745.7181
ivvw-landworks-studloxom
u t i I e
ARCHITECTURE URBAN DESIGN
� Vine
A=IATES,WC.
7. RIVERFRONT PORCH
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem City Hall
A
93 Washington Street
Salem.MA 01970
P:978.745.9595
TEAM
studio
Detail: Board Walk 112 Shawmut Avenue,Studio 613
Bosion.MA02118
P:617.426.3030
F.-617.426.3033
10 Derby Square,4th Floor
Salem,MA 01970
P:978.745,7181
%v%vw.Iandwork"tudIoxom
4 u t i I Is
ARCHITECTURE-URRM DESIGN
Detail: Play Patch Mli�-� V i n e
ASSOMTES,INC.
SECTION I
1/16-=V0' r
Park Crns.�Sp.r.tirin
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem City Hall
93 Washington Street
Salem.MA 01970
P:978.745�9595
—J
Detail:Gathering Mound with Mosaic wall TEAM
iaridwurlk� studio"
112 Shawmut Avenue,Studio 68
Boston.MA 02118
P:617.426.3030
F:617.426 3033
10 Dertoy Square,4th Floor
Detail: Planting Buffer with Seating Salem.MA01970
P:-78.745.7181
I,landwork"tudlo.com
u t i I e
ARCHITECTURE-URBAN DESIGN
V i n e
ASS"TES,WC.
SECTION 2
P r Ct
ark Cross Section
15PEABODY
STREET PARK
b.lew, MA
City of Salem
Salem City Hall
93 Washington Street
Salem.MA 01970
Fi-.978-745.9595
Nell TEAM
landvq)rk!� studio
-j-- 112 Shawmut Avenue.Studio 6B
i Boston.MA 02118
P:617.426.3030
617426.3033
10 Derby Square.4th Floor
Salem,MA 01970
P:978.745.7181
vi�vw.landvvorlk"tudloxom
Detail: Bridge through Remediation Grove
u e
A� -;CTLM.UaWDESrN
. Vine
ASWMTES,WC.
Detail:Gathering mound at River edge
.L
SECTION 3
-A—
Pnrlc I ringifitclinn Sontion
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Salem City Hall
93 Washington Street
Salem,MA 01970
P:978.745.9595
TEAM
qtudin-
112 Slidwrqd Aveme,Studio 68
Boston.MA 02118
P:617.426.3030
F-.617.426.3033
10 Derby Square.4th Floor
Salem,MA 01970
P:978.745.7181
..wjandwork"tudlo.com
u t i I e
ARCHiTECTURE URBkN DESIGN
V i n le
EE� ASS"TES,INC.
Mosaic Wall with Green Screen
PROJECT
15 PEABODY
STREET PARK
Salem.MA
City of Salem
Salem City Hall
93 Washington Street
Salem.MA 01970
P:978.745.9595
TEAM
IL-
lalidworks StUdio
112 Shawmut Avenue.Studio 6B
Boston.MA 02118
P:61.7.426.3030
p 617.426.3033
10 Derby Square,4th Floor
Salem.MA 01970
AbW& P:978.745.7181
vwiq.1and"rk�studlo.com
u t i I e
ARL�l I t(;I U� U�UL41UN
�__ - Vine
ASSOCIATES,INC.
110,
Play Patch from Boardwalk
PROJECT
15 PEABODY
STREET PARK
Salem.NIA
City of Salem
Salem City Hall
93 W,)6hoatoo Sueet
Salem,MA 01 RM
111978.745.9595
TEAM
studio
112 ShavanUt Avenue.Studio 68
Boston,NIA 02118
P:617.426.3030
F:617�426�3033
10 Derby Square,4th Floor
Salem.MA 01970
P:978.745.7181
www.landwork"tudio.com
u t i I le
ARCHITECTURE-URBAN DESIGN
Vine
ASSOCIATES.K.
Mosaic Performance Wall with Gathering Mound
15PEABODY
STREET PARK
Salem,MA
City of Salem
Salem Cky Hall
93 lasuvan Strait
.",MA 01970
.,:9M.745.95IIII5
DESIGN TEAM
I-ANDSCAPE ARCHITECT
studio-
I B=MA 02118
128h mutAranue-StudictE,
P 617 426 3030
F 617 426 3033
10DmbySmem 4thFlrmr
Sala.,MA01970
R 617 426 30M
F 617 4�3033
ea- eeeer.landerorlu"tallecom
URBAN DESIGN
Wile
SO Summer Stment
B Son MA 02110
ua
P.61T4n.7200
F 617,423 1414
www ubtedesign win
CNIL ENGINEER
Vine
ASSMATES ING,
372 haeulnue,Street
Narebur,port,MA 01 M
P 978,466 1428
F.'78,*55.�
.Amiuna.�.nat
STRUCTURAL ENGINEER
Simpson Gumpertz & Heger
41 Seyon Street
Building 1,Suite 5(x,
Waltham,MA 02,153
761,907.91WID Main
78 907 9(X9 F.
CONTEXT MAP
-A�i
FINAL DESIGN SET - JUNE 27 2008 NOT FOR CONSTRUCTION
SFTE
PROJECT
15PEABODY
STREET PARK
Salem,MA
City of Salem
Sal�Cry Hall
93 W.-NW.r,SftxxA
5alerr.MA.1.
P 978.745S595
TEAM
landworks studio-
112�rhal Aenue-Will M
Berhon.MA 02118
P 617.426�
F 617 4n,�
10 Derby Square,4th Flare
Salem,W01970
P a
'i7�.Ww
F 7 4�
�.larnd��dla.ccwrr
LANDSCAPE ARCHITECT
utile
30 Summer l3traet
MA 02110
P OITAZI�CtDD
F 617.4n.1414
URBAN DESIGN
Vine
ASSMA�S,W.
kq 372 fall Staral
Neabu,,rt,MA 0 950
P 428
F.971!.�5
w
CIVIL ENGINEER
Simpson Gumpertz
& Heger
41 S,.n�lawt
Buill 1,Suite 500
Waltham,MA Q2453
781907�Marn
78l,W7,W09 F.
STRUCTURAL ENGINEER
STAMP
4
JUNE 2.2008
PROJECT NUMBER
0803
Park Renderings
......... ........ . ......
T
1 1
PROJECT
15 PEABODY
STREET PARK
Salem,MA
City of Salem
Siaam CRY Hall
Nashu,,on"nnaa
Sakini.MA M970
P Wo.745.aald
0a WORK TO BE PERFORMED UNDER PROJECT BOUNDARY TEAM
HARBOR-WALK CONTRACT POURED IN PLACE landworks studio-
CONCRETE PLAZA Ba"t..MA W118
P 6 7.4M.MW
F 6;7.��WXI
10De"SquQre,mnFiixw
MAGIgn
P 617.�.WW
F 617.�.WW
LANDSCAPE ARCHIMCT
utile
HADE C 30 Stannnir Street
So",�U110
OCEAN GRASS PLANTING 13117141M.�
0 F 7.40.1414
wiieoeso.
SALVAGED GRANITE STONES
URBAN DESIGN
CONCRETE SEAT WALQ� LAWN MOUND Vine
AWCCIA�S.IW
372 M�nwic Sini,A
Nevi MA 01W
P 978�1�
GREENSCREEN ART WALL F 978.�5.�
CIVIL ENGINEER
-'\TRASH DISPOSAL UNIT
r3
Simpson Gumpertz
RED RED
OLD POU
C S C
RUBBER URFA E & Heger
41 Sai"an staiwi
-3 HIGH ALUMINL Ba'dt,1.Sufte
Wafthani,MA O�
I a'HIGH ALUMINUM FENCE 781 W7!X=Main
PLAY EOU""'T 781907 9iXY9 F.
CONCRETE STOOLS 10 1,- STR ICTURALENGINEER
1W HIGH ALUMINUM FAIL REMEDIATION GROVE STAMP
X1
RECYCLED GLASS BAMBOO GROUNDCOVER
CONCRETE UNIT PAVER 11��
WALKWAY
REMEDIATION PLANTINGS
A
1F. �Rl,
BIKE RACK DRINKING FOUNTAIN JUNE Z 200B
POURED IN PLACE
CONCRETE PLAZA PROJECT NUMBER
08(]G
0 3' 9 19
GRPICNIC/ GAME TABLES
SCALE 1�
Materials Plan
36"HIGH ALUMINUM
T
F E AT STREE
r13
SH DISPOSAL UNIT (2)
k
—.ISTING TRIBE M L 1
PROJECT
15PEABODY
STREET PARK
Salem,MA
City of Salem
.u.m.MA Mum
I, 7MiWN5
0 TEAM
landworks studio-
112 SlummutA�ue-ShMioW
Boston.MA M118
3 P.617,�,WW
F 8174n,3DW
GREEN MOUND CANOPY STRUCTURE 10�rbySqUaM,4thFW
RAISEDWALKWAY Sa�.MAMgM
P 617,426,3030
F 617,42630M
LANDSCAPE ARCHITECT
.........
utile
P.617.v&�
F 617.M�1414
2
Park Cms Sectim SCALE:118" I-(r URBAN DESIGN
Vine
CANOPY STRUCTURE 372 Memmac
..bu�pd,MA 01SM)
REMEDIATION PLANTING P'78�165,1428
F 978 465
POURED ER P YrA
A
M,WM
RUBBER PLAY:7
GREEN SCREEIMIARIW L Q
CIVIL ENGINEER
Simpson Gumpertz
& Heger
41 Seo�St�
21 BuNing 1.Sum!X)0
Section Locedw MW Waftham.MA M�
SCale-1�2(Mr 781.907.9�Mah
781,WT�I.
STRUCTURAL ENGINEER
Pa�CMSS Secbm A SCALE US"=I-(T STAMP
CONCRETE PLAZA SOUTH RAJSEDWALKWAY
A A REMEDIATION PLANTING GREEN MOUND CONCRETE PLAZA NORTH
JUNE 2,2008
PROJECT NUMBER
- - - - - -- OB03
----------------- ---------------- ------------------- . . ....
0 4' 8. 16'
SCALE:1/8"=1�
Site Sections
Pa�L.�gdud...l S�� SCALE:11W-l-U'
L2 ,0
PROJECT
15PEABODY
STREET PARK
Salem,MA
PLANTING BED
SAWCUT CONTROL JO4NTTO V CAST IN PLACE COLORED RUBBER C x t-r CAST IN PLACE CONCRETE City of Salem
11I OF SLAB.SEE WEARING COURSE
SHEET LI 28 FOR LAYOUT INFORMATION so, S.�mCft),Hafl
�I�SmIt
4'CAST IN PLACE RUBBER BASE Sa�.MA 019M
ALTERNATING BROOM FINISH PRECAST CONCRE rE UNIT P 9787�1591e$
SEE SHEET L12a FOR INFORMATION 2%MODIFIED NEOPRENE TACKCCAT CAST IN PLACE CONCRETE BASE I TEAM I
W landwork5 studio-
4. COMPACTED AGGREGATE BASE
CAST IN PLACE CONCRETE PAVEMENT 314'BITUMNOUS SETTING BED
O'COMPACTED GRAVEL VTI NMI M 92.
BASE 112 Shmonut A.-SludbW
11 COMPACTED SUBGRADE m—WE 11 11 COMPACTED AGGREGATE Boston,MA wila
tP SIT42ilWW
F 6174QiB�3033
COMPACTED SUBGRADE I EAIET I I IF-11 1 10 Deft Squam.Afti Floor
I I I I — SWem W019M
Ew 'I 4215M30
01
F 51742153033
buid.ommulse..
Cast in Piece Colonel Concrete Pavement:Section Scale:1- 1'-(r Precast Concrete Unit Plemins;Section Scale:1- 1'� C;ast in Piece Rubber Play Surface:Section, Scale;1' 1'-V Cast in Piece Cc,ricrels,Curb Section Scale:V 1*4r LANDSCAPE ARCHITECT
utile
10, MOUND IN ELEVATION Milo
1,67Q31200
F:6�7 4M 104
10 R ALL EXPOSED CORNERS CAST IN PLACE CONCRETE RENCH
URBAN DESIGN
MOUND
CAST IN PLACE CONCRETE BENCH Cwt In Plece Concrete Besting VVI Eleuafior, Scale 3/16—T-O` Vine
ASSI 114C.
IT— PLC UNIT PAVERS 372 Munli ftnet
NmbI MA 01950
R 978 061423
LARGE BOULDER F 978.445.2MO
weassoisassinst
CONTINUOUS UP CONCRETE SEATINGINALL
NTH 94 REBAR @12'O.C.EACH WAY
CONTINUOUS UP CONCRETE SPREAD FOOTING Simpson Gumpertz
WITH 04 RERAR @i?O.C.EACH WAY
& Heger
41 mon Shisul
g1j"I j COMPACTED AGGREGATE BASE y Bust
Ing 1,sum ong,
T1 I
VI T—M-0 I— STRUCTURAL ENCANEER
STAMP
C..t I.PI.i Concrete Seat WWI:Section Scale:1, T-O" Cast In Piece Concrete Sunning Wall:Plan Scale:NIB" 1'-(r Cast In Plect,Concrete,Sea"Wall;Emorborl scam:I-Irr 1'-(r
6
1W XVL X HEIGHTNAIRES STAINLESS STEEL
BOLTED TO CMU WALL STIOUNUESS STEEL BOLTED TO CMU BLOCK WALL
STAINLESS STEEL FACIA BOLTED TO CMU — ADJACENT PRECAST CONCRETE BLOCK PAVERS
WALL olor CIS 1010 Wenger Color GB 1009 Wassau Color GB 9007
PCCUNFPAVERS
SEE DIETAIL 2 THIS SHEET
_j I
COMPACTEDAGGREGATE BASE JUNE 2.2=
DRAINAGESPONEWRAPPEDINFILTERFABRIC 77777777
4
4 PROJECT NU�R
CMURETAININGWAL_ I om
—IlF III PCC Unit Psuent Color GB 1010
3'DIAM PERFORATED PVC PIK CONNECTED PCC Unit Pavers Color GB 1009
-I I M I 1_1 I 1=1 I =1 TO STORM DRAINAGE SYSTEM OR g PCC Unit Prevers,Color GB SOD7 SCALE AS NOTED
INFILTRATION RASIRISVAUE
CONTINUOUS UP CONCRETE FOOTING Paving/ Masonry
COMPACTED AGGREGATE BASE Details
COMPACTED SUBGRADE
I _LKt� I F
sining Wall a Reset!VVigkI Socale.1"=1,01 PCCUnitPwwrg@RwsedVMk":LwYmAPmn Scale 1/8"m l'-T L3 .0
PROJECT
2Y,X 2V DAAL ALUMINUM POST 15PEABODY
3 Irr 3/'r
i IWX 3-RECTANGULARALUMINUM TOP RAIL STREET PARK
a" 5 ilr 5" 3" 1 Salem,MA
M, 6� VXI'ALUMINUM PICI(ETS City of Salem
�Iws Ce,HO
93 ventington
ALUMINUM RAIL POST Swont,MA'"'no
P:..?Rkaflld
TEA
landw studio-
EUISTOMERIC SEALANT 112 Sh�inut A�enue-stoios Be
AROUNDALLPOSTS Coston.w M118
P.Bi7 Q6.W10
1`4 1,7',Ca51Wt3
FINISH GRADE B Be"Sissisq,.41h Floor
swern,w 01M
Q P.:�7.41QS.=30
AL 1: JIL�' IF 7.�.=Kl
T`XZ1RE-CTANGULARALUMINUIlBOTrOM RAIL Gas
LANDSCAPE ARCHIMCT
Munninum Fame C Play Am:Straightened Panel Elevation Scale:1"=1'4r DRILL BLOOKANDSET POST
WITH NOWSHFUNK GROUT AJuminum Play Fence Plan Scale 1" 1'-0` utile
2 30 Suinirs'Setisk
Boston,MA 0110
P 6�7 423�00
F 6 7 423 1414
�� Iodiuign..
URBAN DESIGN
Vine
ASSC)CMTIES 1W.
372 Risunnuic ainiet
N.bu,,W.W 0125)
Is 978'465A425
R=4r-W IF 978.�.2610
inse
CIVIL E14CANEER
Simpson Gumpertz
& Heger
41 Seyorn&Biet
..,Wing 1.su a 500
Wafthar,W=
78107 9001D Man
781 907 90W F.
4 Munninuin Fence(M Pastbody Street:Sei Scale:1" 1'-W STRUCTURAL ENGINEER
STAMP
Af
JUNE Z 21108
to. 9
PROJECT NUMBER
0803
TYP. 1
7 Metal Details-
Aluminum Fences
Aluminum Fence Peab"Sbeet:Sectinn Scale:1, 1'-W f=
Aluminum Fence C Play Area:.Laimut Plan Scale-114" T-O" (5:)
L3 , 1
PROJECT
15PEABODY
ALUMINUM CANOPY AWLEDSTEELPOST TX8'GREENSCREEN STREET PARK
PANEL
SrANDMSEkYALUMNA BACKER BOARD 61 x 81 GREEN SCREEN PANEL 4'X 8'GREEN SCREEN PANEL 8'X8'FULLS12E Salem,MA
SHEET ROOFING FOR CHILDREN'S ARTWORK GREEN SCREEN PANEL SIGN ACKNOWLEDGING City of Salem
URBAN SELF HELP GRANT —
se"n C4 Rea
washin,ran Sleet
M
9, 1:ans.7"Jelk,
Sale ,VA 019M
S
�jwohg% WIN TEAM
w'%vw AZIN landwork studio
mallow I
'AN EWAOM Scal 3MIr 1'4r MA 02118
P:6 74263030
26-Y 11-7 10 6-8 1Z 72-V W_,D," F 617.3033
6 6 1D Deft Silluarre.41fi Few
Saw.,MA,01970
NECORNER PROPERTYLIME P 6 7 426�
PRDPEKTY LINE F 6226=
vanewbandailexidaii,aixullo.in
1E LANDSCAPE ARCHITECT
Or
BE OOR?l utile
PROPERTY UK
30 sanars,Street
MA 02110
P 7A23.7200
F::�T,123,1414
ware,irfikSle.0
L
....... URBAN DESIGN
Green Screen Mosaic Well:Men Scale 3/16- 1-4r Vine
372 Manwac SUvalt
Neawbur,ear.MA 01W
2W MPO BACKERBOARD PANEL BEHIND P 97&465.1�
4 SEPARATE PANELS MOUNTED TO FRONT ENAMEL PANEL CONTAINING CHUFJM aIF 978465�
Z=CMDOPLYWOOD OF ZW BOARD WITH I"REVEAL INBETWEEN ARTWORK MCUNTED TO FRONT OF MDO PLYWOOD reassesides we
VREVEAL 2 SHEETS OF 3f4'MDO PLYWOOD
COUNTERSINK SCREW THROUGH TO TUBE
7 TUBE CIVIL ENGINEER
IT41' EQ. t BCL t Ell t EQ. I
EQ. Ell � ED. ED. 4SO.MEL POST
Simpson Gumpertz
& Heger
41 Sa,0n SlalaiOt
Builkling 1,Safte 500
Iz- Waltharn,VA 02453
781907.9000 Men
781 907,91)09 Fee
STANDING Panels Vft Children s Artwork Top Haff/ Scale:1/2—1*4r MDO PLYWOOD BACKERBOARD Z X&BOARD VATH Z X Z MODULES Scale.1/2" 1'-Oa
SEAM STRUCTURAL ENGINEER
ALUM IN M
ROOFINUG 4W MFO BACKERBOARD PANEL BEHIND STAMP
PANELS 2 EQUAL PANELS MOUNTED TO FRONT ENAMEL PANEL CONTAINING CHILDRENS
SEE STRUCTURAL 4'X F MDO PLYWOOD OF 4xv BOARD WITH F REVEAL INBETwFBN ARTWORK MOUNTED TO FRONT OF MOO PLYWOOD
FOR CANOPY 3' V REVEAL VREVEAL 2 SHEETS OF 314'MDO PLYWOOD
DETAILS COUNTERSINK SCREW THROUGH TO TUBE
r4r 4 2TUBE Ile
Ell B) 4'SQ.STEEL POST
WX�OR
2'X 7
ENAMEL PANEL
W/CF1ILDRFN`S
ARTWORK JUNE Z 200B
�x It,6 x a or W x V4r
GREENSCREEN
PMEL MDO PLYV400D BACKERBOARD 4'X 8-BOARD WITH Ir X It MODULES Scale 1/2" 1-T PROJECT NUMBER
0803
4'SQ.STEEL POST 4"SQ.STEEL POST 4"SQ.STEEL POST
WOOD BENCH
SEE STRUCTURAL SELF TAPPING
S FAINLESS STEEL
TEN SCREW
#5132A MOUNTING F7 �-7 V-7 Green Screen Mosaic
95132V MOUNTING CLIP
GREEN SCREEN PANEL Wall -Details
GREEN SCREEN PANEL
1-4r GREEN SCREEN POST MOUNITING DETAILS 05132V MOUNTING CLIP
t ft'� Canopy Section Scale:1/2"al 1'4r Scale 3"=l'-V L3 ,2
PROJECT
15PEABODY
STREET PARK
Salem,MA
City of Salem
S.Inern City Hall
93 W..h,v.,�
ad
,�Ini,MA 01970
P
TEAM
landworks �studlo
112 Snaminnui�MudioM
Bosiod,MA U118
P.617.426,3030
F 617A263033
10 Derb,Sdamia,4th Floor
Sailea.MV,01970
P 617.425.3030
F 617.426,3030
"M
LANDSCAPE ARCHIMCT
utile
I 30saarderveat
P,61 7.423.7200
F:6 7A2S,1414
lo Iff
URBAN DESIGN
Vine
IM.
372 Merrimac Sftv�
Neebur,,ort,MA 01W
P.978.�,1428
1978 465 2640
�.viraassodstea nut
CIVIL ENGINEER
Simpson Gumpertz
& Heger
41 Se,on Sri"
Building 1,Suite 500
W.M...MA QZlW
781,907.000 Main
78tWTW09F.
STRUCTURAL ENGINEER
STAMP
JUNE 2.2008
PRIDJECT NUMBER
0803
Green Screen Mosaic
Wall -Vews
Green Screen Mosaic Wall Perspective Vic.� L3 .3
PROJECT
r CONCRETE-FILLED 15PEABODY
STEEL PIPE DOLLARD
PAINTED. CONCRETETO STREET PARK
BE SET FLUSH WITH TOP Salem,MA
I P,�87� OF PIPE(SMOOTH FINISH)
Fled,remem
re City of Salem
CONCRETE PLAZA Sedem Csy Has
93 wusm�
S.Wm,NA 01970
P:on 709006
k 4 4 TEAM
L, ..works stu
COMPACTED AGGREGATE 112�mut Aemue-Stuae as
Ismerm.MA 021118
P 617 426 MW
PRECAST RECYCLED GLASS PAVERS LONG HOWZONITAL REBAR F.61T
1 1 2%MODIFIED NEOPRENE TACKCOAT Z4 10 Derby Square,4m Floor
4 INOUS SETTING BED CAST IN PLACE CONCRETE PAVEMENT PROVIDE(4)#5 VERTICAL& Salem MAW970
I 24'LONGHOrdZONTALREBAR
2V LONG HORIZONTAL REBAR #3 TIES @ 1?D.C.
Q� .1amlererks-etudle..
6'COMPACTED GRAVEL COMPACTED AGGREGATIi BASE LANDSCAPE ARCHITIECT
COMPACTED SUGGRADE
COMPACTED SUBGRADE
A
utile
30 Summer Smeet
Concrete Stool 90 Pwred Rubber Surface Secfion Scale:1. T-O' Coricreme Stool Glass Paver VMkay:Secficm Scalw.1--V-0` (3�, onavte Simi Q Coccrele Plaza:S� S�Ie.1. 1,-(r amemi,w Milo
P:617.CM�72C(l
F 617.4M.1414
COMPACTED SUBGRADE
URBAN DESIGN
�WsRnSaX6 - -- — — — —
P 1�
Vine
ASSMATIES INC.
Scale:I"=1'4r 3n Maur.Surma
N."prl,MA 01W
P 978 465 lQ8
F,978 455 2610
�Mneassrcialesret
SV DIAMETER MOUNTING HaE
FOR Ift DLk ANCHOR CIVIL ENGINEER
Simpson Gumpertz
& Heger
T- RUJ141 semn Sbeed
d.,1.Suft 50D
Walffiam.MA 02453
781 W7 9030 Meer
781,907 9009 FU
STRUCTURAL ENGINEER
STAMP
11-r 1141' TZ
JUNE 2.2008
OONCF ETE PLAZA
PROJECT NUMBER
0803
k A ". Site Furnishings Details
:1 �112:16V :A
:10 1
Site Furnishings Details
.11 M I I-1 I 1�1 I FI I I-- --I I I— I-- I
/'Te� Ganne'T":Secdon/Plan Scaw:1, 1'-(r Bike Rack:S�/Plan Scale:1" T-U` Pod Climber:Soc#on Scale I"=1'4r
L3 .4
PROJECT
15PEABODY
STREET PARK
Salem,MA
TAT" City of Salem
�rS C4 Hal
S.W..MA 01970
=71,8040w P 9MJM.�
TEA
landworks -studio-]
MSIWW�A. 51�ffi
Boston,MA M118
P 6 7.,Ci63030
F.617426.=3
10 DerbY Square 4th Fkcr
sewe,'"olm
TALKTLBE P 617 426.3031)
F 6 7AZ.�
TW.P= �Wn�rt�.
SIMI)EKINEBIFMAIIE UNDSCAPE ARCHIM�
utile
CABLECORE CAUES FINNGRADE
P:�T�3.7200
F TQ3 1414
--SUPMPW
URBAN DESIGN
Vine
ASSMAMS,INC.
372 Mernmac SUWA
Newbar,raft,W 01950
P 978,465.1425
F:978 465�
�nea.aes.net
1=12 CIIAL ENGINEER
Simpson Gumpertz
,Al'
4 A
4 & Heger
41 Seon Shnat
BUION 1,Suite Soo
Wafthen,MA(OISI
781,9117.9000 M.
781.907.90A FO
Talk Tube;Section Scale:1, V-v STRUCTURAL ENGINEER
MUM STAMP
S d.r��Cft� Section I Plan Scale:1" T-w Ca�e Clienber:PerSoecbve Section Plan Scale:V V-0'
Z4�
JUNE Z 2008
PROJECTNUMBER
08D3
3-4117
Site Furnishings Details
4'ANCH R BOLTS—
!?
Site Furnishings Details
1-100AWASM
VSQUIRECONCRETESIU111 x
D
Itril'sSUPPLY
Water Fwntain:Bad an I Plan Scale:I"=1'4r 13 Trash Can:Section/Plan Scale:1. 1.4 L3 .5