Loading...
15 PEABODY STREET- PEABODY STREET PARK 15 Peabody Street (Peabody Street Park) Salem r= Redevelopment M= Authority Design Review Board Proposal April 28, 2010 15 Peabody Street (Peabody Street Park): Discussion of proposed signage Proposal The attached memo describes the sign proposal and location. After submission of the proposal, staff has revised its recommendation for the DCR sign as follows: • Do not include the DCR logo; • Use the same background color as the "Peabody Street Park" sign; • Use the same white font and color as the "Peabody Street Park" sign; and • Reduce the size approximately in half to 10" x 5". 0,ko I rA QTY OF SALEM, MASSACHUSETTS DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT KIMBERLEY DRISCOLL MAYOR 120 WASHINGTON STREET + SALEM,MASSACHUSLYIS 01970 TELL:978-619-5685 + FAX:978-740-0404 Lv,N�,N GOONIN DUNCAN,AICP DIRECTOR April 16, 2010 Design Review Board Salcm Redevelopment Authority 120 Washington Street Salem, MA 01970 Summary of a Park Sign at 15 Peabody Street In May, the City will be completing construction of a new park at 13 Peabody Street. With the park completion on the horizon, the City is coming before the Design Review Board at its April 28th meeting for review of a park sign. In addition to giving distinction to the park, the sign is also a requirement of the Urban Self-Help grant which is funding a portion of the park. The proposed sign for Peabody Street Park is identical to one being posted at Furling Park (20 Franklin Street) and is designed to comply with the city-wide signage guidelines. It is also similar to those signs posted along the Bike Path. The proposed park sign is a 2'-6" x 3'-3" single sided aluminum sign panel hung on a 3" cast aluminum pole. The park name will be in white Adobe Garamond Sernibold text. Along the bottom of the sign will be "Salem" in a medium gray blue script. The City Seal is located at the top of the sign. The sign will be hung on an extruded aluminum sign bracket with an attached steel bar hanger and a cast aluminum finial. All installation work will be performed by the sign company. As a requirement of the City's Urban Self-Help grant, administered by the MA Department of Conservation and Recreation (DCR), the sign must also include the following statement: PEABODY STREET PARK A Cooperative Project between the City of Salem and the Commonwealth of Massachusetts Urban Self Help program In order to meet this condition, we plan to affix a second sign 3" below the park sign. This second sign will be 20" Aide x 10" high and will also show the DCR logo, although this is not a requirement of the grant. The City is proposing that the sign be located along Peabody Street, centered in a middle planting island. There are several limiting factors regarding placement of the sign. There are cement seating walls situated throughout the park. Running underneath one seating wall, parallel to Peabody Street, is a large steel I-beam (evidence of the property's industrial past). Lastly, there is a wide sidewalk along Peabody Street. The proposed location accommodates these constraints while also providing appropriate visibility for the sign. Proposed Location for Peabody Street Park Sign 4, City of Salem,MA Sign Type 04B-Destination ID Sign DWG RP Progr— Elevatim,arid Spedficatictris 04B.1 Description Single aided aNnimn.sign panel Mtt.lunimurn bar hanger.aiieuded aluminum sign brutlort and and east aluminum finIaI Materials Pamet 2'-6"INX3-3 H.�)4"thk.aluminum plate Post FSchedule Q pipe rest alum.Finial. 14-insi-s Beedue,M-31 4'Thk.Alum.bar and Stainless Steel listeners,Mth�trudisd.1rininum bork,t. 17.0ing;As required. Graphics&Finish Finuoh(All Components); Write..A,i rylw Poly.rethans Cat Aluminum Finial, I ext Ap plicatiser Refleinive Sheeting. twi.r M16,Ptd.Bl.k Syv*o L Digit&[print on alum,panel,see Iayout 31 C Berit Sbral Bar T�psfaesse Adobe Ganovond Sernib.W. Hangs,,Ptd.BI.,k C-1-ae: Pand-Darl,Gray Blue to no Ith,P1,43545C Tot-wints —5.1ruded Aluminum Script-Mdj.mG,.yBlu.to ro.1th NW12W Sign Bracket,Phil.Me& Trinn M.Iding-Bl.ck 1 1,P thli. Post,IInu4B..and B,.kt-B1.6 Phd.Phi$546C —T� White R.Hertirs Sheeting —.Siflerrr Cirephn, sprayed and m.k.d LI NIP12446 3"M&hedule 40 51/4, L? Aluminum PipaPost Ptd.Bla& 323139-3 SALVAGED 13OULDERS &NEW ENTRY SIGN City of Salem,MA Sign Type 04B-Destination ID Sign DWC Sign fingrm Putel Laymtt 04B.2 B.ke t FQ FQ M IITIAN��.pkt�.Edgnpkd. FURLONG W.�h M&C..1 G., *Wb. d T�.Ad.b. �all Csp� PAR K C'.phn spmy.d.nd.�k�d �2" 314 11-0" 323139-4 SALVAGED BOULDERS & ENTRY SIGN City of Salem,MA Sign Type 04B-Destination I D Sign DWG i�'n Progam Pmt,BrivkLt,md Finial Nw& 040-3 c.q" NO N"951f. I�4'thk,A].,, 1,2 dk.Ah.,.. IPS�U iir-d.1,40 At......NF,N�r N�t Top.ind Fitual Fhl.id 3 4-�2 At... b,11k.1 sar. 1"" ......th 57RAdj. g.d��.Ih 1 4 1111c. k1u," Vthk.AI�PlAt� 3,4' T Md Uu., NTS qq,6�d 1� p,,A W�,.d,'Igr�rluc I I r lhk.Alt..,.- Sq �d plo�'A'W 1"t"I Chill TApped into 3 4 �Z AvmN.td--` F.� '.'d L'"W44"T w Sign Prcko [,.r,,r.,nJ S.gn B,.,,k.-I P.t.p.M.md br,def Odd 0- y- 1 0- 32 -3 139--) SALVAUti.)I:5UULI)h-KN &NEW ENTRY SIGN B. Contractor shall provide a second,smaller aluminum sign,approximately 20 inches wide x 10 inches high, to be mounted on the entry sign post 3 inches below the entry sign panel. I. Material shall be 1/8-inch thick aluminum with reflective sheeting face,back and edges painted black. 2. Text shall be reflective sheeting and shall read: FURLONG PARK A Cooperative Project between the City of Salem and the Commonwealth of Massachusetts Parkland Acquisitions and Renovations for Communities Program 3. An icon image,approximately 4 inches in diameter,shall be provided on the sign.Image shall be cut vinyl consisting of nine separate colors and appear as the following: 4. Final sign sizes,text colors, typefaces and sign layout shall be provided by the Landscape Architect during the Construction Administration phase. C. All sign colors to be selected from standard or custom colors and approved by the Landscape Architect. 323139-6 SALVAGED BOULDERS &ENTRY SIGN lip LU w UJ (L E MR 1 11 ills, m m A NU Department of Conservation and Recreation Logo City Seal of SALEM BIKE PATH 11W. 2'-6"(panel) Description Single Sid d aduminu n sign Panel with aluminurn bar Cast Aluminum Finial, hanger,extruded aluminum sign bracket and and c,st Lawler#9516,Ptd,Black aluminum finial. 3/4'*Bent Steel Bar Materials Hanger,Ptd.Black M Panel:2'-6...W x Y-KH x 1/4"thk.aluminum plate Extruded Aluminurn Post,3"Schedule 40 pipe with Cast alum.Finial. Sign Bracket,Ptd.Black Hariging Bracket 2"W x 3/4"Thk,Alum.bar and Stainless 1/4"thk-Alumiraun Panel Steel fasteners,with extruded aluminum bracket. Ptd.PMS546C rooting:As required. Text Graphics & Finish White Reflective Sheeting "Salem"Graphic Finish(All Components): Mathews Acrylic Polyureth,me sprayed and masked 5 04. R--6"MP12446 Text Application:Reflective Sheeting- Symbol:Digital print on alum.panel,See Layout Typefaces:Adobe Garamond Serrdboid. sip W��3- M—W sw� Colors: Panel-Dark Gray Blue to match PMS546C Text-White 3"IPS Schedule 40 Script-Medium Gray Blue to match MP12446 Aluminum Pipe Post Trim Molding-Black Ptd.Black Post,Finial,Base and Bracket-Black iF A P 'P lu td m B'- m la" c h m e P- uI— e 4 e0 P1% o� 16"diameter by 48"decp concrete fc�6,g Meter dal (dirwa bud2l Apost) I wwwmetrosign.not F8X: 978.851.2022 PhONO: 978.851.2424 170 [Drum Str@01 TOWIlSbUrY, MA 01816 ftxt� hataftim , 14 d City of Salem "Muk UNIM H.S. Mom CRY of wuw� Salem, MA 4.27.10 ftftw J.P. ID 51,.h unklifta 7933 '* 10-4598A1 %W 1/8" Thick Aluminum with VA-�ite Reflective Vinyl Graphics. Back, Edges and Face Painted Black. Logo Digitally Printed and Laminated on High Performance Vinyl. Sign Mounted 3" Below Main ID Sign. FURLONG PARK - I -ol A Coopciativc Pi cct 1-)ctwccn the City of Salem and the Common-wcalth of Nfassachuscas Parkland Acquisitions and Renovations for Communities Program Wiew.metrosign.not FIX: 978,851.2022 Phone: 978.851.2424 170 torUM Street TewksbufW, MA 91876 001ftew leftfurbow ZL- City of Salem WNIM H.S. maw Ctt'.1 W. ;. �tWn 10 Sign.ft Mina" Salem, MA 4.27.10 In"K J.P. OMMM" Wd ardw 4 ; , H W E- �- Y'' Q � O ¢ � P.. Q W a. Sca I e ni Redevelopment Authorltv Salem Redevelopment Authority Decision July 8, 2009 15 Peabody Street Park: Proposed design revisions S—RA—Dec�ision At their meeting on July 8, 2009, the SRA voted to approve the July 8, 2009 DRB recommendation for the proposed design revisions to the 15 Peabody Street Park with the condition that the sharp corners on the green space be reinforced. DRB Recommendation At their meeting on July 8, 2009, the DRB voted to recommend approval of the proposed design revisions. Salem Rede-velopment Authorltv VHS Design Review Board Proposal July 22, 2009 15 Peabody Street Park: Discussion of revised design Proposal Due to existing conditions discovered during construction, the design of the 15 Peabody Street Park needs to be revised. The attached submission describes the conditions found on site and the revised design. SRA 15 Peabody Street Park REVISED DESIGN PROJECT NARRATIVE July 15. 2009 Design Evolution The redesign of the park is necessitated by the recent discovery during the clean up process that the entire site is significantly riddled with foundations, walls and slabs of former industrial buildings. The unearthed slabs and walls are very thick and heavily reinforced. These remnants are considered ostensibly immovable. In many areas of the site, due to the presence of thick concrete 'floors', meeting the proposed excavation depths has been impossible. Further (obviously), the location of these newly discovered artifacts has thrown a serious monkey wrench into all aspects of the approved plan for the Park. Thus, the design team has been required to revisit the placement, elevation and footing conditions of all Park components within the context of the new reality of the existing site. Design Criteria Because of the demands of the original project schedule, which was tied to funding protocol, many elements and materials for the Park have already been purchased. The 'pre-purchased' items include: glass pavers, all fencing materials, play equipment, picnic/game tables, benches, water bubbler, light posts and so on. The revised site plan reflects merely an on-site redistribution of those exact items, which have been previously approved. The redistribution is in response to what the site conditions are allowing. As part of the remediation, DEP requires that there be three feet of clean fill in any landscaped area and one foot of clean fill in any paved area. If a specific landscaped area cannot be excavated the necessary depth to allow three feet of clean fill, either the area must be paved or the finished grade raised. Further, because of the presence of an expansive concrete floor just below the surface of the ground, the zone which had been defined as an infiltration area can no longer be such. Therefore, due to a litany of issues such as this, the greater challenge for the design team has been to accommodate requisite site infrastructure, site infiltration, and program components where conditions permit. Further, the reshuffling of the deck must not increase the overall construction cost of the Park. Description of the Park Urban Context The new Peabody Street Park, designed for the enjoyment of all residents and tourists, represents a significant NEW open space and recreational amenity for the City of Salem. The figure of the Park physically links Peabody Street to the South River and the adjacent residential neighborhood to the new Harbor Walk. A generous network of paths, play areas and plantings have been synthesized to optimize pleasant, safe and memorable pedestrian experiences within and through the Park. The interactions between the various aspects and materials of the Park are tailored to engender unique social opportunities for a range of Park visitors. Green Presently, the open space in the area of the proposed park is defined by expansive fields of asphalt and parking lots with marginal planted areas intermittently sprinkled throughout. The new Park will provide much needed punch with respect to the creation of meaningful green space in an otherwise very dense, urbanized neighborhood. In addition to increasing diversity of bird life in the area, a large grove of canopy trees will provide cooling shade during the summer months and dramatic color throughout the fall. Expansive planting areas will provide pleasing views, interesting colors and textures and otherwise pleasant places to sit and visit. Further, the significant planting beds will provide infiltration areas for storm water which would otherwise migrate across the site, creating an environmental nuisance. Program The park is designed to be intensely used. A range of sculptural ground plane materials will accommodate a variety of prescribed program opportunities, passive recreating and built-in opportunities for programmatic invention. The weave of program elements has been designed to create a cohesive and comprehensive sense of place for the Park. Durable materials and simple detailing will also ensure the long term vitality and vibrancy of the Park and reduce costs associated with Park maintenance. Archeological Frame A zigzagging concrete wall meanders through the site, referencing the site s industrial past by exactly tracing the figure of former factory buildings. The series of low concrete walls provides a basic and clear spatial structure for the Park and visually links Peabody Street to the new Harbor Walk. Further the walls serve to define programmatic boundaries and overlaps, thresholds, places to sit, and, more generally, contribute to a unique Park identity. Art tiles, made by area children, will be mounted intermittently to the walls throughout the Park. Park Areas Peabody Terrace is located adjacent to Peabody Street. Three generous openings in the perimeter seat wall provide a clear and urbane Park threshold. The lush and cooling experience of Peabody Terrace is defined by a thick grove of trees (up-lighted), ground covers, earth forms a-id stone dust pathways and several park benches. The pervious ground plane will also double as the a,ea of infiltration. A catch basin will be located within the Terrace and be connected to the City storm drain at the street. This is the only zone on the site where the DEP 3' of excavation was able to be achieved. Accordingly, it has become the prime spot for the majority of the tree planting and where reasonable infiltration can be expected. By grouping together significant plantings, benches and multiple pathways, a very inviting street side park-let is created. Children's Play Court The center of the site is defined by an area of active use, primarily by young children. Top of the line play equipment will provide a variety of recreational opportunities for a range of ages. Interactive sculptural ea-th forms subtly reinforce the zone of the Play Court while brightly colored rubber paving provides a visually stimulating ground plane and a more comfortable surface on which to play. From wood benches and sections of the archeological frame seat wall, parents and/or supervisors will be able to sit and watch the children playing. Carefully positioned openings between planted areas ensure appropriate connectivity tc all other zones of the Park. The Play Court is situated where the infiltration zone of the previously approved scheme used to be. Because of the existing slab below grade, infiltration is impossible, as is the planting of large trees, which had also been proposed for the area. Consequently, this area favors the use of impervious materials and the planting of smaller plant materials. Riverside Picnic Terrace A series of picnic tables will be placed on an expansive mosaic of glass pavers at the edge of the South River and result in the creation of a great place to sit and visit. The new design will optimize views back to the City and out to the Harbor and establish a highly vibrant and social interface between the zone of the park and the zone of the Harbor Walk. The glass pavers, which in the previous scheme were evenly dispersed throughout the entire Park, have been gathered in the north/east corner of the site and will engage a more limited planted area as well as the pavilion structure. The new scheme exactly reflects the number of blue metal tables that were in the approved scheme. Peabody Street Park Corridor The pedestrian corridor provides direct linear connection from Peabody Street to the Riverside Picnic Terrace, the Pavilion and the Harbor Walk. Situated along the easterly side of the site, the hedge lined walkway will also provide opportunities for sitting on park benches, and unobstructed views through the Park, exactly as it was in the previously approved plan. The pathway will be well lighted, with the placement of fixtures also unchanged in this scheme. The water bubbler will be located at the southern most edge of the Corridor, just in-board from the Peabody Street entrance. SOUTH RIVER HARBORWALK CANOPY SAME LOCATION AND TYPE AS ORIGINALLY SPECIFIED GLASS PAVER PLAZA CONCRETE SEAT WALL W1 PLAY TABLES (AS CONSTRUCTED) (SAME SQUARE FOOTAGE AND COLORS OF PAVERS GRASS MOUND SAME TYPE AND QUANTITY OF (SMALLER THAN TABLES AS ORIGINALLY ORIGINALLY SPECIFIED SPECIFIED.NEW LOCATION) SAME GRASS SPECIES, TREE PLANTING AT HIGH POINT) SEA GRASS PLANTING HEDGEIVINESIFENCE (UNCHANGED FROM (SAME SPECIES FROM APPROVED SCHEME) ORIGINAL DESIGN) PLAY AREA RUBBER/STONE DUST (SAME SQUARE FOOTAGE ADDITIONAL GRASS MOUND AND PLAY EQUIPMENT (SAME GRASS SPECIES FROM ORIGINAL DESIGN) AS SPECIFIED FOR ORIGNIAL GRASS MOUND WITH TREE u, PLANTING AT HIGH POINT) CONCRETE SEAT WALL (AS CONSTRUCTED) STONE DUST PATHWAYS CONCRETE SEAT WALLS (RECONFIGURED) (AS CONSTRUCTED) 1D (8)BENCHES (SAME TYPE AS ORIGINALLY SPECIFIED) ADDITIONALGRASS MOUND (4)POST LIGHTS (SAME GRASS SPECIES AS (SAME TYPE AND ORIGINALLY SPECIFIED, LOCATION AS TREE PLANTING AT HIGH ORIGINALLY SPECIFIED) POINT) NEW INFILTRATION BEDS (GROUNDCOVER AND TREE PLANTINGS) RELOCATED BUBBLER CONCRETE SEAT WALLS CONCRETE SIDEWALK (AS CONSTRUCTED) EXISTING TREES TO REMAIN PEABODY STREET PEABODY STREET PARK- REVISION 6RA July 15, 2009 Scale: 1/16" = 1'-0" LANDWORKS STUDIO, Inc. x amp__-- )d Mon VIEW OF RIVERSIDE PICNIC AREA LOOKING TOWARD DERBY STREET LANDWORKS STUDIO, Inc. July 15, 2009 xt j'� bi -T IL t- '4K 14' VIEW OF FRONT ENTRY COURT AT PEABODY STREET LOOKING TOWARD POWER STATION LANDWORKS STUDIO. Inc. July 15, 2009 VIEW INTO PLAY AREA LOOKING TOWARD PEABODY STREET LANDWORKS STUDIO, Inc. July 15, 2009 j VIEW FROM PEABODY STREET ENTRANCE LOOKING TOWARD SOUTH RIVER LANDWORKS STUDIO, Inc. July 15, 2009 TTL' TEAM and.,rk, studio Utile T.1- AA. A. Vine 1E Simpson Gumpertz &Heger T AA. STAMP �MWN W H P�T�AT�MINT� I...�T FAI.. �F T�E M CRIGI�Y 1�.11�AT SA��C AAD L�l� AS�I�NAALY�ACIFIFDI rl A. C.A�� RELMA�W�M 15 �y st�t M.WMI PWn Ll .1 15 PEABODY ST. PARK S.I�,MA Cit,M SM.. A 0.di. utile Vine "waso pip MINIZ,!ft 15PEABODY STREET PARK City of Salem OM I T�M andwork, studio utile jr -ALI Vine ,!,4; studio -.00, utile bib, Vine AL Simpson Gumpertz &Heger ST� 4, lsp�ys�l 1/2' 71:1 105-60 95 ( 105-30 1/2, 4*. 4* (NOM) SLATS ( SEE WOOD OPTIONS IB, 3/8' 4 1/2* 3/0. x 2'S. SIL SrL BAR 2 71r OD BUTION SOCIO Hl)� SrL PIPE LAG SCP W/WAS 1/2 3' I/ STL BAR t12- 47'( 105-60 if — 12. 14* 67- ( io&-BD 14' 11 S-2 SURFACE WLOR�C HOICES FOR POWDER.C.Q.A.T.F�1�1�H C B BLAC--KID DEEP RED 0 Cl ALMOND El WHITE 0 HUNTER GREEN 0 GREEN(DARK) 0 BLUE D LIGHT BLUE SUPPORT POST D HERITAGE BROWN 0 BRONZE CI ARGENTO 19 7/8' 12' 0 5-1 EMBEDME SUPPORT POST TNT/ 1/2' x 3 sn. BAR LENGTH OPTIONS -------- ;9 6' BENCH 0 8' BENCH C3 S-4 SUB FLOOR NOTES WOOD OPTIONS 1.) ALL STL. MEMBERS COATED W/ ZINC RICH EPDXY THEN �CLR ALI HEART REDWOOD 54S EE FINISHED W/ POLYESTER POWDER COATING. 0 'C' & BTR. DOUGLAS FIR KD S4S EE 2,) ALL WOOD MEMBERS TREATED W/ CLEAR PRESERVATIVE- Ei-�EAR WESTERN RED-CEDAR-S4S-EE 3.) 1/2' X 3 3/4" EXPANSION ANCHOR BOLTS PROVIDED -0 OTHER FOR S-2 & S-4 OPTIONS. IN�ON E TITLE BENCH DATE DRAWN 1/18/97 DRAW NG EDuMor-, inc . DRAWN BY All REV. NUMB I ER "T DATE REV. 1/14/05 105 SERIES SH P.O. Box 142 MUffintown, PA 17059-0142 REV. BY : AWN D I OF 2 1/4-X 2- STL W 1/4'X 2- STL BAR 3/8-SSIL %U RAT Wk z COLOR CHOICES FOR PO gR-COATFINIS �LACK U umc�� � MBLIVIOND WHITE [I HUNTER GREEN GREEN(DARK) [I BLUE LIGHT BLUE [3 HERITAGE BROWN BRONZE [I ARGENTO 3/8'X 2-S.STL OTN. NOTES 59. HD.LAG SMN 1.) ARMREST COATED W/ ZINC RICH EPDXY THEN FINISHED W/ POLYESTER POWDER COATING. 2.) LOCATE ARMREST 4" MIN FROM EDGE OF SLAT TO ARMREST HOLE CENTER AND MARK HOLES ON SLATS. 3.) FIELD DRILL PILOT HOLES FOR LAG SCREWS, SEE CHART. 0 0 DATE DRAWN 06/20/08 TITLE DRAWN BY ESS - ARMREST HARDWARE- DuMor, inc. DATE REV. - REVISION A DRAWING 105-OOAR P.D. Box 142 M=ato", PA 17059-0142 REV. BY INUMBER F 4 q Salem Redevelopment 1 f7F Salem Redevelopment Authority Decision December 10. 2008 15 Peabody Street Park: Proposed design revisions SRA Decision At their meeting on December 10, 2008, the SRA voted to approve the November 12, 2008 DRB recommendation for the proposed design revisions to the 15 Peabody Street Park with the exception of the bench design which will change to discourage people from sleeping on them (e.g., having dividers in the middle and arm rests at each end). DRB Recommendation At their meeting on November 12, 2008, the DRB voted to recommend approval of the proposed design revisions with the understanding they would review a subsequent iteration of plans showing details on four items: the Peabody Street entrance by the stone dust, the canopy, the corner return of the art wall, and the method of affixing the art tiles. Staff Comment The DRB reviewed the subsequent iteration of plans on the four details on November 19, 2008 and provided feedback. Proposal The construction bids for the original proposal exceeded the available funds by approximately $200,000. The design has been simplified to reduce costs while still meeting the community's goals of having a mix of park amenities and connections to the South River and Point neighborhood. I-A p EABLD 0 y REET PARK f Ity of ly of Salem -j uble Vine SImpron Gumpeti I &Heger 15 Pwbody Ll.1 ---------- andwo,ks studio Utile Vine Sirnpson Gumpertz &Heger ST� lsp�ys� "Ywtp� ------------- ---------------- ----------------------- L1.2 landworks studio, Ale Vine Simpson Gumpertz &Heger 15PEABODY STREET PARK City of Salem and,o,ks studio Uble Vim Simpson Gumpertz &Heger 14 lanff�i�r" studio 2 Utile Vim Simpsor�Gumpertz 3 &Heger w 4 6 15�y S� P.WQ� L3.1 11 -TI, . I 9 H 0, IN I -�g 11 V , I ;,0 1§111 1 if 1P.- I I E W7 04 -6 0 p zl Ik landwork., studio Uble Vine Simpson Gumpertz &Heger 15 PeabMly L3.3 landworks studio utile ell Vine Simpson Gumpertz &Heger 9: 1� TqU7P.lJJJ. L 2 K�ww IIPE�BODY STREJPARK T�. MA CRY of Salem la,id�wks studio 01 Able Vine Simpson Gumpertz &HKer ---------------------------- 15 P..b.1y Ad Id.D�.W 1-3.5 2 ond�wks studio az�, uUle I A l.1.1 11111�6 (�IPVFJ Vine 4 1- Simpson Gumpertz 2 &Heger ................__ ............ lancl.wk, studio FrLr Utile Vine §11—mioson Gumpertz Ll I &Heger ST� 03 ' 4 SteFurnishingsDuu,11s, Pl. E�aw 6 7 L3.7 landworl,s studio Ar Utle Zt Vine I L -7, 9"EWI I t Simpson Gumpertz &Heger 9 site FUMIshings DMIls L3.8 land.o,ks studio, F� We 2 3 Vim Simpson Gumpertz &Heger TMEM� AT�W� 5 P.6.dy S 4 L3.9 and,,wk� studio Uffle Vine Simpson Gumpertz &Heger Campy RenderingB L4.0 15 PEABODY ST.PARK �..MA utile Vine 15 PEABODY ST. PARK utile Vine 15 S��. - M= 15 PEABODY ST. PARK Sa�..MA My&�mm utile Vine 15 P.�y 15 PEABODY ST. PARK IF "T �lf' 7 -k utile It Vine too to) I It d, aws.6`4 13 .4 . 4 fa ("54) 4 15 weit mr�rrrl IS PEABODY ST. PARK Salem.M City of Salem �Wrfi. "re"."t utile Vine IVA ��at,Wy$treet ArtWat 15 PEABODY ST. PARK S.Ion.,MA City of Salem k �studio "T, utile 17140 Vine —1—aa k S,FI�10W, 15 PEABODY ST. PARK utile Vine EW- Ali- Salcin Redevelopment C= AuthoritNv' Salem Redevelopment Authority Decision Junell , 2008 15 Peabody Street Park: Final Design SRA Decision At their meeting on June 11, 2008, the SRA voted to approve the May 28, 2008 DRB recommendation with the stated condition for the final design plans for the 15 Peabody Street Park. DRIB Recommendation At their meeting on May 28, 2008, the DRIB voted to recommend approval of the Firal Design plans with the condition that the DRB participate in the review the proposed artwork for the wall. Proposal Salem received a grant from the State to complete the design and construction of a new park at 15 Peabody Street. The City recently selected a team of design consultants led by Landworks Studio to complete the park design by early summer of 2008. The design team will build from the schematic design created by Tufts University graduate students in 2007. At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA spoke favorably of the design and referred it to the DRB for schematic review. The SRA waived its procedures and approved having the proposal stay with the DRIB through final design before returning to the SRA for final approval. Design Review Board Recommendation May 28, 2008 15 Peabody Street Park: Discussion of proposed Final Design DRB Recommendation At their meeting on May 28, 2008, the DRB voted to recommend approval of the Final Design plans with the condition that the DRB participate in the review the proposed artwork for the wall. Proposal Salem received a grant from the State to complete the design and construction of a new park at 15 Peabody Street. The City recently selected a team of design consultants led by Landworks Studio to complete the park design by early summer of 2008. The design team will build from the schematic design created by Tufts University graduate students in 2007. At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA spoke favorably of the design and referred it to the DRB for schematic review. The SRA waived its procedures and approved having the proposal stay with the DRB through final design before returning to the SRA for final approval. Page I of I TUF IS L 11D Print ( lo�c http://mbta.com/templates/image_popup.asp?imgsrc=`/`3Cimg+alt`/`3D`/`22Art+Unveiling2+lg`/`22+src... 5/28/2008 Page I of I i 1z dl David Aucoin Laurinda T. Bedingfield Julie Furbusb Julie Furbush Alice Grossman Ryan Klemek r Irp , Charles Marchany Simi Rabinowit/. GregoryVantz print Close http://mbtalcom/templates/image_Npup.asp?imgsrc---�/�3Cimg+alt`/�3D�/�22Art+Unveilingl+lg`/�22+src... 5/28/2008 Salem Redevelopment Authorltv Design Review Board Proposal Referred from Salem Redevelopment Authority Apn123, 2008 15 Peabody Street Park: Discussion of proposed Schematic Design Proposal Salem received a grant from the State to complete the design and construction of a new park at 15 Peabody Street. The City recently selected a team of design consultants led by Landworks Studio to complete the park design by early summer of 2008. The design team will build from the schematic design created by Tufts University graduate students in 2007. At the March 31, 2008 Point Neighborhood Association meeting, the design team worked with residents to refine the park design. The final park design will be based on comments made at the March 31 meeting and will be presented at the April 28 Point Neighborhood Association meeting. David Jaquith volunteered to attend the neighborhood meetings to serve as a liaison between the community and the DRB. At the April 9, 2008 Salem Redevelopment Authority (SRA) meeting, the SRA spoke favorably of the design and referred it to the DRB for schematic review. The SRA waived its procedures and approved having the proposal stay with the DRB through final design before returning to the SRA for final approval. PROJECT 15 PEABODY ST. PARK Salem, MA City of Salem wee,co,H.11 93 Wastriogl0r,Street Side..MIA 01970 �.978.745.9595 reivr�oore TEAM studio 112 Slrd�ut ir�onue,Studio 6S Beside.MA 02118 11,.617 426�3030 F.617 426.3033 10 Dedd,Situate.4M Riede Saleve,W 01970 P.978 745.7181 &W.0.0,104bilft. I.AN�AK ARCHITTICT u t i I e ARCHITECTURE-URBAN DESIGN 30 Som"eur st� Guidon.MA 02110 lit.617,423.7� F:617.423.1414 .,.Uwd..w URB&v DESIGN Vine ASSOCIATES,INC. 372 Me"Ieeec street 11,.978.465.1428 F,978,466,2(So) �L ENGINEER STAMd 15 APR 08 Peabody Street with surrounding context PROJECT NUMBER 0803 PROJECT 15 PEABODY ST. PARK Salem, MA City of Salem Salem oty�1( 93 ft,h.�,I.n Sa,"t �,m MA 01970 978.745�9595 TEA i, T i . studio 112 Sh.w..t A�.,Slud�.68 Bwtom MA 02118 P�617.42&3030 F,617AM.W33 10�rby SWare.4W Sm ��.W 01970 978 745.7181 IL*N�ARCHFTE� utile MCHrTECTURE-URBAN DESIGN 30�m�,Su.t Ovaon,W 02110 P.617 423.7� P.617 423.1414 T-) ­uU"..W.M URBAND�IGN V i n e ASSOCIATES,INC. 372 M.11.�u S11.1 N�W�n,IM 01950 k 978 465.1428 F.978 465 2640 CML ENGINUR 4 LEGEND: 1. Street Porch STAVId 2. Rernediation Grove 04-APR-08 3. Mosaic/Mural Wall 4. Play Patch 5. Boardwalk 6. Gathering Mound PMECT NUMBER 0803 7. Riverfront Porch 15 Peatocy SI,cc!plan 8. Harborwalk 9. Canoe Launch 10. Tidal Garden ----------- - - -------- PROJLCT 1.5 PEABODY STREET PARK Salem. MA City of Salem Sal..W0070 EXISTING HAR13ORWALK TEAM -T FUTURE BOAT LAUNCH studio- -7 1 Ma�ut A�.Stlxlic,w B,V..MA MUS 10 Nala,ScIl 4M Raca Sale..IM015)70 —POURED IN PEACE CONCRET PLAZA P.97B.745.7181 OCEAN GRAS PLANTING LANDSCAPE ARcmnlECT S N MOUND utile STOOL SFAMNG BOULDERS — scnton.MAW110 R6174217" PII51L423.1414 URBAN DESIGN MURAL I MOSAIC WALL V i n e AMMTES.W. 372�ilmacSlvatet N..," MAO� R 9 4 SAlISS F.978 CONCRETE BENCH CNIL ENGINEER PLAY AREA FENCING COLORED POURED RUBBER SURFACE REMEDIATION GROVE CONCRETE UNIT PAVER WALKWAY RAILING STAW 4 v TREE GRATE 15-APR-08 PROJECT NUMBER BENCHES AT STREET EDGE L 1 M03 15 Peabody Street Site Plan 3") PICNIC I GAME TABLES _JQ FENCE AT STREET POURED IN PLACE CONCRETE PLAZA PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem �1W.01y'lam ft�h.o.st'.1 't.,MAOA70 978.7,tS.%95 TEAM studio- 112 ShawMUI AAAue..SbA�68 OsAWNWO211 to Nfby sqw1e.4th FWs SAN,MA 01970 9T&74S.7JU31 LANDSCAPE ARCHITECT utile �W.MA02110 P.617.423.7200 R 617.4211414 Park Cross S� URBAN DESIGN 0 4' 81 16' 32' �g�g-- -gvine AMMTES.W. 372 MerArtac Str� N�q,w.MAO 950 P.97i.46511428 P.978 465,2640 �,�.C= CMIL ENGINEER 2P,rk Cross S.L. 1/8' IV a 4' a 16' 32 STAMP 15-APR-08 PROIrCT NUMBER L2 OffD3 Peabody Street Sections 7 �'�Nk� 3 Paric Lonptudinal SW" 3/3r IV* 0 f W 16' f—I PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Sal�cilyl4all 93 Waahi�� i8k,�.WOI 9 70 7 97&745.9595 TEAM studio- 112�.w oW...SWdb 613 �,W wl� 617.426.W3O P.617A26AOM 10�arby Squaa�4�Fickv W 01970 P.978.745.7181 LANDSCAPE ARCHrrECY utile Raiaed Walkway�onomtnc 3 Gl..Pay.,Plan Dal.,l �n.MA 02M It.617.423.7� R.61IA2�1414 URBAN MIGN 9�M Vine MS"TES,INC. 372 M..l,StakA lk.978 1428 F.978.465.� CIVIL ENGINEER 4 Waaau Glass 8'14axa�nal Pavera 0 91ANIP pay� Mo�Bed -L- I I I I I I 15-APR-08 B"Edp L3 Raised Walkway Details Rebar Cmshed A4dgaw Baso C-Vw*ad SW ff 1. 2 —4! 2Rla�.d Walk.,�h.n 0�1.,l 1"=I PROJECT 15 PEABODY STREET PARK Salem,MA City Of Salem wo'mctywl S"mW01970 R 978 745.9595 I TEAM studio - 112 Sf—mut A�n�&W�Ga Bwt...W 02WI k 617.426.W30 P.617.426.3033 10�by Sq�m.4�F�r w 01970 P.978.745.7181 LANDSCAPE ARCHITECT Utile �qETFURE-U�� 30su...'� �W,MAOMO P.617.423.7� F.-617 423.1414 URRAN DESIGN ASSOCIATES,INC. Mural Wall RearVi,wAxonornetric 4Mural Wall Axonometric 5Mural Wall Perspective N�n F.978.465,2"0 CML ENGINEER fr-W MAX 31 3' STWP L4 Murat! Mosaic Wall N L —1 L -J L —1 L�-J A .-:7- 2Green Screen Full Height Section Detail 3Green Screen/Mosaic Section I Elevation Details 1/2" V-0" PROJECT 15PEABODY STREET PARK Salem,MA E? Compacted Granulw Compacted[Ag9tegate City of Salem �I�Ca,A Compacted S., 93washingtonstz" 5 W..MAOM0 ftag'78_74t5�95 TEAM ANGLED FIELD 3W IV studio- 11-t �-T tT' h I i 112 Shawreut ewenue,Saxte,M 31� 21� 1W TXT SQUARE STEEL POST IW F.617.426.� 'XT RECTANGULAR STEEL HANDRAIL 10(Nab,,Square,ft� 0 F 11Y 20' SQUARE STEEL MEMBERS 3PLAY AREA FENCE AND PAVING S Ien,.MA M70 agT&745.7� LANDSCAPE ARCHffECT u t i I e �I�T�,��ICh 30SUMM rstreet �Ioq,=O�O k.617.423.72()() HORIZONTAL GRADIENT BOTH OPTIONS TO HAVE BLUE 3/4" F.617.423 1414 POWDERCOATING 2' PLAY AREA FENCE OPTIONS UWAR VESM ��:Wine 413LUE PowDERcoATNG SAMPLE AMMATES,W. 3T2Ma`rjMacSIrM FENCE TO BE BLACK OR BRONZE N�Uqp.rt.MAO� ik�978.�i428 ONGUARD STARLING FENCE SECTION 3 979.465.2MI) RAJL AVAdLABLE THROUGH FENCE TOWN =TT_ 1.8813.FENCETOV�. VWAVVFENCETOWN COM CIVIL ENGINIEER 2FENCE AT STREET 15-MR-06 PROJECT NUMBER L5 08M 15 Peabody Street Play Fencing Details 7 5 PLAY AREAFENCE MON 1 IV i._7 0 5 10, 2(Y PROJECT 15 PEABODY STREET PARK Salem,MA Broorn firush pour in place concrete with two color ldho- City of Salem chrorne hardener finish U�cftyH.q s�.WO1970 P.8978.745.9595 TEAM studio- 617.426.3030 F.617.426ZM POURED IN PLACE CONCRETE COLOR 10�"S1.1,4th Sa� ��01970 TREATMENT TO BE: 97Z745.7 181 SCOFIELD LITHOCHROME CONCRETE HARDENER LANDSCAPE ARCHITECT LITHOCHROME Color hardener is used to ------- add beautiful color—vibrant or subtle—into the surface of freshly placed concrete-This utile ready-to-use, powdered dry-shake harden- ARcW--VrURE-JRM4DESM ers produces a long-wearing horizontal wsummw� Bostar.MA 02110 surface ideal for pedestrian or vehicular ft 617 4M 7� P 617.423A414 traffic-indoors or out. Use of LITHOCHROME Color Hardener URBAN DESIGN results in increased abrasion resistance and higher compressive strength for hard land- scapes. V i n e ASSWATES,INC. Poured in Piace Concrete Plaza North -0" 372�.SU� a, W V IV 37 ��Wo� Bridge Blue" k9m,165.142II F.978.465.26�10 CIVIL ENGINEER "Royal Blue" "Chalk Blue" STAIMP 15-APR-08 PROJECT NLIMSER L6 0803 Concrete Plaza Details 2Poured in Plaw Concrete Pjaza South va,1-01 3Z Past Project Images using LITTHOCHROME concrete hardener T-� PROJECT 15 PEABODY ST. PARK Salem, MA City of Salem Salem city Paul 93 WaShIngtor Street Selara.MA 01970 P.978.745.9595 TEAM landworks studio- 112 Shavranut Avenue.Snake 613 Bovtoa.Mh 02118 P.617.426.3030 F:617.426.Mn 10 Derby Square.4th Floor Seem.MA 01970 LANDSI ARCHMECT u et 11 le ARCHITECTURE-URaAN DESIGN 30 St,,.t HUSIOFI�VIA 023 10 R 617.4 233 200 F;617A23.1414 URBAN DESIGN � Vine z��ASSOCIATES,INC. Moselc Wall wftb Green Solvent Play Patch from Boardwalk 372 Mqorrr.�Street Newber,poM W 01950 �.978.465.1428 P.978.465.2W ..vinieleseebliblen.t CML ENGINEER STAMd 15-APR-08 L 7 PROJECT NUMBER 15 Peabody Street PhotograPhic Mounduages cE, Park from across South River Mosaic Performance Wall with Gathering Mound 74�_ Salem Redevelopment Authorltv MEMORANDUM TO: Members of the Salem Redevelopment Authority FROM: Tom Daniel, Economic Development Manager SUBJECT: 15 Peabody Street Park: Schematic Design Review DATE: April 3, 2008 CC: Lynn G. Duncan, Executive Director Attached please find information regarding the proposed park at 15 Peabody Street. Salem received a grant from the State to complete the design and construction of the park. The City recently selected a team of design consultants led by Landworks Studio to complete the park design by early summer of 2008. The design team will build from the schematic design created by Tufts University graduate students in 2007. At the March 31, 2008 Point Neighborhood Association meeting, the design team worked with residents to refine the park design. The final park design will be based on comments made at the March 31 meeting and will be presented at the April 28 Point Neighborhood Association meeting. The recommended action is to refer this item to the Design Review Board for Schematic Design Review. Because of the tight timeline, we are requesting that the proposal then return to the Design Review Board for Final Design Review after which the item would come to the SRA for final approval. Please feel free to contact me at (978) 619-5685 or tdaniel@salem.com should you have any questions or concerns regarding this matter. Public Park at 15 Peabody Street Project Narrative Introduction to the project The schematic design for the park at 15 Peabody Street Park follows on the coattails of a concept plan developed by the City along with graduate students from Tufts University in the Spring of 2007. Working together with the Point Neighborhood, the team developed a plan which identified all of the programmatic goals and elements desired by the community for the park. The park site is bordered to the north by the South River, to the east by the National Grid power sub-station, to the south by Peabody Street, and to the west by the Beverly Coop Parking lot. The park intersects the proposed Harborwalk which runs from Derby Street along the southern length of the channel. The site is classified as a brownfield and the project includes appropriate remediation for this parcel. Design Concept The park design is predicated on the concept of an urban front porch. The park is both a front porch for the Point Neighborhood as well as a link for the city at large back into the neighborhood. Two large paved urban plazas, or porches, enable large gatherings and concentrated social spaces. The Waterfront Porch is along the northern edge of the park and is intended to serve as a space for performances and large gatherings. The northern edge of the plaza could be configured, in a future phase, to allow for an access ramp down to the water for launching kayaks, canoes and other small crafts. The Peabody Porch is located along the southern edge of the park and is occupied by game and picnic tables and becomes a strong active social edge along Peabody Street. The remediation aspect to the project has become an integrated part of the design. Wedged in between the two plazas lies a large green area created by one strong gestural cut and fill maneuver. The cut creates a low point which will provide an area for storm water collection and management. It also creates the opportunity for a beautiful garden showcasing species which contribute to the remediation of the soil and filtration of stormwater. The displaced soil, the fill, is reused on site, along with necessary planting medium, to create a large lush green gathering mound along the waterfront. This mound can be used for sunbathing or gathering to watch an outdoor movie or other performance along the water. A slightly raised passageway crosses the remediation garden and connects Peabody Street to the Harborwalk. A small playground, the Play Patch, is located to the east of the remediation garden and consists of play equipment, a brightly colored poured rubber surface, and a low fence for protection. The poured rubber surface spills out of the play area and meets a ten foot high mosaic/mural wall. This colorful and performative wall screens the park from the National Grid power station. The first lower four feet of the wall is a green screen mesh material which allows planting/vines to grow up the surface. The actual mosaic/mural would sit above the green screen and make up the next six feet of wall. Bending along the entire eastern edge of the park, the wall allows the mural to be visible from different angles around the site. Seating is scattered throughout the park and integrated into each of the experiential elements. Benches are built into each end of the wall, and small concrete stools are concentrated along the raised walkway through the remediation garden to create an opportunity to stop and socialize along the walk. Project Timeline The design work for the park is set to be complete with construction drawings and bid package at the beginning of June, Prior to that date the project will be reviewed by the Design Review Board, the Conservation Commission as well as three meetings with the community. The first of those meetings was held on March 31s. Construction will commence on the park late summer of this year and will be completed in its entirety by June of 2009. PROJECT 15 PEABODY STREET PARK Salem.MA City of Salem Salem City Hall 93 Washington Street Salem.MA 01970 P.978.745.9595 TEAM landworks StUdio- 112 Shawmut Avenue.Studio 68 Boston,MA 02118 P.-617.426.3030 F-.617.426.3033 10,Dert)y Square,41h Floor ,�MA 01970 !78.745.7181 landworks-studlo.corn u t i I e ARC.HJFC-.1AF-URRANOM11A V i n e AM"TES,INC. S i,—, LN Peabody Street Park surrounding context map. PROJECT 15 PEABODY STREET PARK Salem.MA City of Salem �iaiem city Hall 93 Washington Street Salem.MA 01970 P:978.745.9595 TEAM studio WIN wqw 112Stia.mutAvenue,StUC1Io6B Boston,MA 02118 P.617.4 26.3030 F:617,426.3033 10 Derby Square.1tn Flwr Salem,MA 01970 il 078 745 7181 t.. www.landwork�studio.com JI, u le ARCHITEGIURE-URBAN DESIGN V in e All MSOCATES,INC. -ma� . . ......... cl Existing Site Photos PRCI-Irff 15 PEABODY STREET PARK Salem,MA City of Salem Salem city Hall 93 Washington Street Salem.MA 01970 p-978,745.9595 TEAM I Iinchijrifk.-1 studio- 112 Shawmut Avenue.Studio 68 Boston,MA 02118 P-.1511,42bJU3U F:617.426.3033 7 10 De"Square,4th Floor 8 Salem.MA 01970 P:978.745.7181 v,%nv.Iandworks-s*udIoxom u t i I e AR,-JEOuRE-uRBAN DESIGN � Vine LEGEND: MSOCIATES,INC. 1. Street Porch 2. Remediation Grove 4 3. Mosaic/Mural Wall 3 4. Play Patch 2 5. Boardwalk 6. Gafhidnng-MouDd 7. Riverfront Porch —"aft.rwalk "J� 9'� 6arfo-e- -a n �O.Tidal tGaurd PROJECT 15PEABODY STREET PARK Salem,MA City of Salem Salem Cfty Hall 93 washington Street Salem,MA 01970 Ft 978.745.9595 Ll TEAM landww' studio 112 ShawmUt Avenuc.Studio SIB =3 a 13�ton,MA 02118 P:617.426.3030 F:617.426.3033 10 Derby Square,4th Flwr Salem.MA 01970 P:978.745.7181 �Aandwork"bjclioxom u t i I le ARCHITECTURE-URBM DESIGGN V i n e ASS"TES,INC. ik*4 Ads 1. STREET PORCH PRO JECT 15 PEABODY STREET PARK Sal�m.MA City of Salem Salem City Hall 93 Washington street Salem.MA 01970 P:978 745.9595 TEAM landwf)rk, Studil 112 ShaWMUt Avenue.Studio 68 c=i Boston.MA 02118 P:617.426.3030 F:617.426.3033 10 Derby Square,4th Floor Salem,MA 01970 P:978.745.7181 �w.fandworlk"tudloxom u t i I e ARCHITECTURE,URBAN DESIGN rill �--�� Vine :Z:�— &%OCIATES,INC. L Roo 2. REMEDIATION GROVE PROJECT 15 PEABODY STREET PARK Salen,,MA City of Salem Salem C'ly H111 93 Washinglon Slf,et Salem,MA 01970 P:978 745 9595 TEAM f studio f 112 Shawnut Avenue.Studlo 68 Bo�ton P:61T426.3030 F:617.4263033 io Derl)y Square,4th Floor Salem.MA 01970 P:978 7453181 w,landworks-studlo.com u t i I le W ARCHITECTURE JRaAN DESIGN V i n e ASSOCIATES,INC. Pill -"qq- ro 00-4, L 3. MOSAIC MURAL WALL I�CT 15PEABODY STREET PARK Saiem,MA City of Salem Salem Crty Hall 93 WaShingion street Salem,MA 01970 .19 P:978.745.9595 -j TEAM studio- 112 ShaWMUt Avenue.Studio 63 IN-g--D E . Boston,MA 02118 P-617.426.3030 F:617.426.3033 10 Derby Square.4th Floor Salem,MA 01970 P:978.74 5.7181 vnvw.landvvork"tudlo.com utile ARCHITECTURE-UFeAN DESIGN \�d V ine ASSMUTES,WC. 0 E 4 1 4. PLAY PATCH PROJECT 15 PEABODY STREET PARK Salem.MA City of Salem Salem Day Hall 93 WaShIngton Street Salem,MA 01970 P:978.745.9595 TEAM studio 112 Shawmut Avenue.Stucho 613 Boston.MA 02118 1-.617.426.3030 F;617.426.3033 10 Derby Square,4th Floor Salem.MA 01970 P:978.745,7181 �.Iandworlks-studloxom u t i I e ARCHITECTURE URBAN DESIGN V in e ASSOCATES,INC. 0 0 — D 5. BOARDWALK PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Salem City Hall 93 Washington Street Salem,MA 01970 P:978.745�9595 rEAM studio 112 ShaWMUL Avenue,Studio 6B 77-1 Boston.MA 02118 P:617.4263030 F;617.426.3033 10 Derby Square,4th Floor Salem.MA 01970 P:978.745,7181 �w.landworlk�tudloxom u t 11 e ARCHITECTLRE-URBAN DESIGN V i n e ilISSOCIATES,WC. 6. GATHERING MOUND PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Salem City Hall 93 Washington Street Salem,MA 01970 P:978.745.9595 TEAM landwor�- studio 112 Shawmut Avenue.Studio 6B a I Boston.MA 02118 P:617-.426.3030 F:617.426.3033 10 Derby Square,4th Floor Salem MA 01970 P:978.745.7181 ivvw-landworks-studloxom u t i I e ARCHITECTURE URBAN DESIGN � Vine A=IATES,WC. 7. RIVERFRONT PORCH 15 PEABODY STREET PARK Salem,MA City of Salem Salem City Hall A 93 Washington Street Salem.MA 01970 P:978.745.9595 TEAM studio Detail: Board Walk 112 Shawmut Avenue,Studio 613 Bosion.MA02118 P:617.426.3030 F.-617.426.3033 10 Derby Square,4th Floor Salem,MA 01970 P:978.745,7181 %v%vw.Iandwork"tudIoxom 4 u t i I Is ARCHITECTURE-URRM DESIGN Detail: Play Patch Mli�-� V i n e ASSOMTES,INC. SECTION I 1/16-=V0' r Park Crns.�Sp.r.tirin PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Salem City Hall 93 Washington Street Salem.MA 01970 P:978.745�9595 —J Detail:Gathering Mound with Mosaic wall TEAM iaridwurlk� studio" 112 Shawmut Avenue,Studio 68 Boston.MA 02118 P:617.426.3030 F:617.426 3033 10 Dertoy Square,4th Floor Detail: Planting Buffer with Seating Salem.MA01970 P:-78.745.7181 I,landwork"tudlo.com u t i I e ARCHITECTURE-URBAN DESIGN V i n e ASS"TES,WC. SECTION 2 P r Ct ark Cross Section 15PEABODY STREET PARK b.lew, MA City of Salem Salem City Hall 93 Washington Street Salem.MA 01970 Fi-.978-745.9595 Nell TEAM landvq)rk!� studio -j-- 112 Shawmut Avenue.Studio 6B i Boston.MA 02118 P:617.426.3030 617426.3033 10 Derby Square.4th Floor Salem,MA 01970 P:978.745.7181 vi�vw.landvvorlk"tudloxom Detail: Bridge through Remediation Grove u e A� -;CTLM.UaWDESrN . Vine ASWMTES,WC. Detail:Gathering mound at River edge .L SECTION 3 -A— Pnrlc I ringifitclinn Sontion PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Salem City Hall 93 Washington Street Salem,MA 01970 P:978.745.9595 TEAM qtudin- 112 Slidwrqd Aveme,Studio 68 Boston.MA 02118 P:617.426.3030 F-.617.426.3033 10 Derby Square.4th Floor Salem,MA 01970 P:978.745.7181 ..wjandwork"tudlo.com u t i I e ARCHiTECTURE URBkN DESIGN V i n le EE� ASS"TES,INC. Mosaic Wall with Green Screen PROJECT 15 PEABODY STREET PARK Salem.MA City of Salem Salem City Hall 93 Washington Street Salem.MA 01970 P:978.745.9595 TEAM IL- lalidworks StUdio 112 Shawmut Avenue.Studio 6B Boston.MA 02118 P:61.7.426.3030 p 617.426.3033 10 Derby Square,4th Floor Salem.MA 01970 AbW& P:978.745.7181 vwiq.1and"rk�studlo.com u t i I e ARL�l I t(;I U� U�UL41UN �__ - Vine ASSOCIATES,INC. 110, Play Patch from Boardwalk PROJECT 15 PEABODY STREET PARK Salem.NIA City of Salem Salem City Hall 93 W,)6hoatoo Sueet Salem,MA 01 RM 111978.745.9595 TEAM studio 112 ShavanUt Avenue.Studio 68 Boston,NIA 02118 P:617.426.3030 F:617�426�3033 10 Derby Square,4th Floor Salem.MA 01970 P:978.745.7181 www.landwork"tudio.com u t i I le ARCHITECTURE-URBAN DESIGN Vine ASSOCIATES.K. Mosaic Performance Wall with Gathering Mound 15PEABODY STREET PARK Salem,MA City of Salem Salem Cky Hall 93 lasuvan Strait .",MA 01970 .,:9M.745.95IIII5 DESIGN TEAM I-ANDSCAPE ARCHITECT studio- I B=MA 02118 128h mutAranue-StudictE, P 617 426 3030 F 617 426 3033 10DmbySmem 4thFlrmr Sala.,MA01970 R 617 426 30M F 617 4�3033 ea- eeeer.landerorlu"tallecom URBAN DESIGN Wile SO Summer Stment B Son MA 02110 ua P.61T4n.7200 F 617,423 1414 www ubtedesign win CNIL ENGINEER Vine ASSMATES ING, 372 haeulnue,Street Narebur,port,MA 01 M P 978,466 1428 F.'78,*55.� .Amiuna.�.nat STRUCTURAL ENGINEER Simpson Gumpertz & Heger 41 Seyon Street Building 1,Suite 5(x, Waltham,MA 02,153 761,907.91WID Main 78 907 9(X9 F. CONTEXT MAP -A�i FINAL DESIGN SET - JUNE 27 2008 NOT FOR CONSTRUCTION SFTE PROJECT 15PEABODY STREET PARK Salem,MA City of Salem Sal�Cry Hall 93 W.-NW.r,SftxxA 5alerr.MA.1. P 978.745S595 TEAM landworks studio- 112�rhal Aenue-Will M Berhon.MA 02118 P 617.426� F 617 4n,� 10 Derby Square,4th Flare Salem,W01970 P a 'i7�.Ww F 7 4� �.larnd��dla.ccwrr LANDSCAPE ARCHITECT utile 30 Summer l3traet MA 02110 P OITAZI�CtDD F 617.4n.1414 URBAN DESIGN Vine ASSMA�S,W. kq 372 fall Staral Neabu,,rt,MA 0 950 P 428 F.971!.�5 w CIVIL ENGINEER Simpson Gumpertz & Heger 41 S,.n�lawt Buill 1,Suite 500 Waltham,MA Q2453 781907�Marn 78l,W7,W09 F. STRUCTURAL ENGINEER STAMP 4 JUNE 2.2008 PROJECT NUMBER 0803 Park Renderings ......... ........ . ...... T 1 1 PROJECT 15 PEABODY STREET PARK Salem,MA City of Salem Siaam CRY Hall Nashu,,on"nnaa Sakini.MA M970 P Wo.745.aald 0a WORK TO BE PERFORMED UNDER PROJECT BOUNDARY TEAM HARBOR-WALK CONTRACT POURED IN PLACE landworks studio- CONCRETE PLAZA Ba"t..MA W118 P 6 7.4M.MW F 6;7.��WXI 10De"SquQre,mnFiixw MAGIgn P 617.�.WW F 617.�.WW LANDSCAPE ARCHIMCT utile HADE C 30 Stannnir Street So",�U110 OCEAN GRASS PLANTING 13117141M.� 0 F 7.40.1414 wiieoeso. SALVAGED GRANITE STONES URBAN DESIGN CONCRETE SEAT WALQ� LAWN MOUND Vine AWCCIA�S.IW 372 M�nwic Sini,A Nevi MA 01W P 978�1� GREENSCREEN ART WALL F 978.�5.� CIVIL ENGINEER -'\TRASH DISPOSAL UNIT r3 Simpson Gumpertz RED RED OLD POU C S C RUBBER URFA E & Heger 41 Sai"an staiwi -3 HIGH ALUMINL Ba'dt,1.Sufte Wafthani,MA O� I a'HIGH ALUMINUM FENCE 781 W7!X=Main PLAY EOU""'T 781907 9iXY9 F. CONCRETE STOOLS 10 1,- STR ICTURALENGINEER 1W HIGH ALUMINUM FAIL REMEDIATION GROVE STAMP X1 RECYCLED GLASS BAMBOO GROUNDCOVER CONCRETE UNIT PAVER 11�� WALKWAY REMEDIATION PLANTINGS A 1F. �Rl, BIKE RACK DRINKING FOUNTAIN JUNE Z 200B POURED IN PLACE CONCRETE PLAZA PROJECT NUMBER 08(]G 0 3' 9 19 GRPICNIC/ GAME TABLES SCALE 1� Materials Plan 36"HIGH ALUMINUM T F E AT STREE r13 SH DISPOSAL UNIT (2) k —.ISTING TRIBE M L 1 PROJECT 15PEABODY STREET PARK Salem,MA City of Salem .u.m.MA Mum I, 7MiWN5 0 TEAM landworks studio- 112 SlummutA�ue-ShMioW Boston.MA M118 3 P.617,�,WW F 8174n,3DW GREEN MOUND CANOPY STRUCTURE 10�rbySqUaM,4thFW RAISEDWALKWAY Sa�.MAMgM P 617,426,3030 F 617,42630M LANDSCAPE ARCHITECT ......... utile P.617.v&� F 617.M�1414 2 Park Cms Sectim SCALE:118" I-(r URBAN DESIGN Vine CANOPY STRUCTURE 372 Memmac ..bu�pd,MA 01SM) REMEDIATION PLANTING P'78�165,1428 F 978 465 POURED ER P YrA A M,WM RUBBER PLAY:7 GREEN SCREEIMIARIW L Q CIVIL ENGINEER Simpson Gumpertz & Heger 41 Seo�St� 21 BuNing 1.Sum!X)0 Section Locedw MW Waftham.MA M� SCale-1�2(Mr 781.907.9�Mah 781,WT�I. STRUCTURAL ENGINEER Pa�CMSS Secbm A SCALE US"=I-(T STAMP CONCRETE PLAZA SOUTH RAJSEDWALKWAY A A REMEDIATION PLANTING GREEN MOUND CONCRETE PLAZA NORTH JUNE 2,2008 PROJECT NUMBER - - - - - -- OB03 ----------------- ---------------- ------------------- . . .... 0 4' 8. 16' SCALE:1/8"=1� Site Sections Pa�L.�gdud...l S�� SCALE:11W-l-U' L2 ,0 PROJECT 15PEABODY STREET PARK Salem,MA PLANTING BED SAWCUT CONTROL JO4NTTO V CAST IN PLACE COLORED RUBBER C x t-r CAST IN PLACE CONCRETE City of Salem 11I OF SLAB.SEE WEARING COURSE SHEET LI 28 FOR LAYOUT INFORMATION so, S.�mCft),Hafl �I�SmIt 4'CAST IN PLACE RUBBER BASE Sa�.MA 019M ALTERNATING BROOM FINISH PRECAST CONCRE rE UNIT P 9787�1591e$ SEE SHEET L12a FOR INFORMATION 2%MODIFIED NEOPRENE TACKCCAT CAST IN PLACE CONCRETE BASE I TEAM I W landwork5 studio- 4. COMPACTED AGGREGATE BASE CAST IN PLACE CONCRETE PAVEMENT 314'BITUMNOUS SETTING BED O'COMPACTED GRAVEL VTI NMI M 92. BASE 112 Shmonut A.-SludbW 11 COMPACTED SUBGRADE m—WE 11 11 COMPACTED AGGREGATE Boston,MA wila tP SIT42ilWW F 6174QiB�3033 COMPACTED SUBGRADE I EAIET I I IF-11 1 10 Deft Squam.Afti Floor I I I I — SWem W019M Ew 'I 4215M30 01 F 51742153033 buid.ommulse.. Cast in Piece Colonel Concrete Pavement:Section Scale:1- 1'-(r Precast Concrete Unit Plemins;Section Scale:1- 1'� C;ast in Piece Rubber Play Surface:Section, Scale;1' 1'-V Cast in Piece Cc,ricrels,Curb Section Scale:V 1*4r LANDSCAPE ARCHITECT utile 10, MOUND IN ELEVATION Milo 1,67Q31200 F:6�7 4M 104 10 R ALL EXPOSED CORNERS CAST IN PLACE CONCRETE RENCH URBAN DESIGN MOUND CAST IN PLACE CONCRETE BENCH Cwt In Plece Concrete Besting VVI Eleuafior, Scale 3/16—T-O` Vine ASSI 114C. IT— PLC UNIT PAVERS 372 Munli ftnet NmbI MA 01950 R 978 061423 LARGE BOULDER F 978.445.2MO weassoisassinst CONTINUOUS UP CONCRETE SEATINGINALL NTH 94 REBAR @12'O.C.EACH WAY CONTINUOUS UP CONCRETE SPREAD FOOTING Simpson Gumpertz WITH 04 RERAR @i?O.C.EACH WAY & Heger 41 mon Shisul g1j"I j COMPACTED AGGREGATE BASE y Bust Ing 1,sum ong, T1 I VI T—M-0 I— STRUCTURAL ENCANEER STAMP C..t I.PI.i Concrete Seat WWI:Section Scale:1, T-O" Cast In Piece Concrete Sunning Wall:Plan Scale:NIB" 1'-(r Cast In Plect,Concrete,Sea"Wall;Emorborl scam:I-Irr 1'-(r 6 1W XVL X HEIGHTNAIRES STAINLESS STEEL BOLTED TO CMU WALL STIOUNUESS STEEL BOLTED TO CMU BLOCK WALL STAINLESS STEEL FACIA BOLTED TO CMU — ADJACENT PRECAST CONCRETE BLOCK PAVERS WALL olor CIS 1010 Wenger Color GB 1009 Wassau Color GB 9007 PCCUNFPAVERS SEE DIETAIL 2 THIS SHEET _j I COMPACTEDAGGREGATE BASE JUNE 2.2= DRAINAGESPONEWRAPPEDINFILTERFABRIC 77777777 4 4 PROJECT NU�R CMURETAININGWAL_ I om —IlF III PCC Unit Psuent Color GB 1010 3'DIAM PERFORATED PVC PIK CONNECTED PCC Unit Pavers Color GB 1009 -I I M I 1_1 I 1=1 I =1 TO STORM DRAINAGE SYSTEM OR g PCC Unit Prevers,Color GB SOD7 SCALE AS NOTED INFILTRATION RASIRISVAUE CONTINUOUS UP CONCRETE FOOTING Paving/ Masonry COMPACTED AGGREGATE BASE Details COMPACTED SUBGRADE I _LKt� I F sining Wall a Reset!VVigkI Socale.1"=1,01 PCCUnitPwwrg@RwsedVMk":LwYmAPmn Scale 1/8"m l'-T L3 .0 PROJECT 2Y,X 2V DAAL ALUMINUM POST 15PEABODY 3 Irr 3/'r i IWX 3-RECTANGULARALUMINUM TOP RAIL STREET PARK a" 5 ilr 5" 3" 1 Salem,MA M, 6� VXI'ALUMINUM PICI(ETS City of Salem �Iws Ce,HO 93 ventington ALUMINUM RAIL POST Swont,MA'"'no P:..?Rkaflld TEA landw studio- EUISTOMERIC SEALANT 112 Sh�inut A�enue-stoios Be AROUNDALLPOSTS Coston.w M118 P.Bi7 Q6.W10 1`4 1,7',Ca51Wt3 FINISH GRADE B Be"Sissisq,.41h Floor swern,w 01M Q P.:�7.41QS.=30 AL 1: JIL�' IF 7.�.=Kl T`XZ1RE-CTANGULARALUMINUIlBOTrOM RAIL Gas LANDSCAPE ARCHIMCT Munninum Fame C Play Am:Straightened Panel Elevation Scale:1"=1'4r DRILL BLOOKANDSET POST WITH NOWSHFUNK GROUT AJuminum Play Fence Plan Scale 1" 1'-0` utile 2 30 Suinirs'Setisk Boston,MA 0110 P 6�7 423�00 F 6 7 423 1414 �� Iodiuign.. URBAN DESIGN Vine ASSC)CMTIES 1W. 372 Risunnuic ainiet N.bu,,W.W 0125) Is 978'465A425 R=4r-W IF 978.�.2610 inse CIVIL E14CANEER Simpson Gumpertz & Heger 41 Seyorn&Biet ..,Wing 1.su a 500 Wafthar,W= 78107 9001D Man 781 907 90W F. 4 Munninuin Fence(M Pastbody Street:Sei Scale:1" 1'-W STRUCTURAL ENGINEER STAMP Af JUNE Z 21108 to. 9 PROJECT NUMBER 0803 TYP. 1 7 Metal Details- Aluminum Fences Aluminum Fence Peab"Sbeet:Sectinn Scale:1, 1'-W f= Aluminum Fence C Play Area:.Laimut Plan Scale-114" T-O" (5:) L3 , 1 PROJECT 15PEABODY ALUMINUM CANOPY AWLEDSTEELPOST TX8'GREENSCREEN STREET PARK PANEL SrANDMSEkYALUMNA BACKER BOARD 61 x 81 GREEN SCREEN PANEL 4'X 8'GREEN SCREEN PANEL 8'X8'FULLS12E Salem,MA SHEET ROOFING FOR CHILDREN'S ARTWORK GREEN SCREEN PANEL SIGN ACKNOWLEDGING City of Salem URBAN SELF HELP GRANT — se"n C4 Rea washin,ran Sleet M 9, 1:ans.7"Jelk, Sale ,VA 019M S �jwohg% WIN TEAM w'%vw AZIN landwork studio mallow I 'AN EWAOM Scal 3MIr 1'4r MA 02118 P:6 74263030 26-Y 11-7 10 6-8 1Z 72-V W_,D," F 617.3033 6 6 1D Deft Silluarre.41fi Few Saw.,MA,01970 NECORNER PROPERTYLIME P 6 7 426� PRDPEKTY LINE F 6226= vanewbandailexidaii,aixullo.in 1E LANDSCAPE ARCHITECT Or BE OOR?l utile PROPERTY UK 30 sanars,Street MA 02110 P 7A23.7200 F::�T,123,1414 ware,irfikSle.0 L ....... URBAN DESIGN Green Screen Mosaic Well:Men Scale 3/16- 1-4r Vine 372 Manwac SUvalt Neawbur,ear.MA 01W 2W MPO BACKERBOARD PANEL BEHIND P 97&465.1� 4 SEPARATE PANELS MOUNTED TO FRONT ENAMEL PANEL CONTAINING CHUFJM aIF 978465� Z=CMDOPLYWOOD OF ZW BOARD WITH I"REVEAL INBETWEEN ARTWORK MCUNTED TO FRONT OF MDO PLYWOOD reassesides we VREVEAL 2 SHEETS OF 3f4'MDO PLYWOOD COUNTERSINK SCREW THROUGH TO TUBE 7 TUBE CIVIL ENGINEER IT41' EQ. t BCL t Ell t EQ. I EQ. Ell � ED. ED. 4SO.MEL POST Simpson Gumpertz & Heger 41 Sa,0n SlalaiOt Builkling 1,Safte 500 Iz- Waltharn,VA 02453 781907.9000 Men 781 907,91)09 Fee STANDING Panels Vft Children s Artwork Top Haff/ Scale:1/2—1*4r MDO PLYWOOD BACKERBOARD Z X&BOARD VATH Z X Z MODULES Scale.1/2" 1'-Oa SEAM STRUCTURAL ENGINEER ALUM IN M ROOFINUG 4W MFO BACKERBOARD PANEL BEHIND STAMP PANELS 2 EQUAL PANELS MOUNTED TO FRONT ENAMEL PANEL CONTAINING CHILDRENS SEE STRUCTURAL 4'X F MDO PLYWOOD OF 4xv BOARD WITH F REVEAL INBETwFBN ARTWORK MOUNTED TO FRONT OF MOO PLYWOOD FOR CANOPY 3' V REVEAL VREVEAL 2 SHEETS OF 314'MDO PLYWOOD DETAILS COUNTERSINK SCREW THROUGH TO TUBE r4r 4 2TUBE Ile Ell B) 4'SQ.STEEL POST WX�OR 2'X 7 ENAMEL PANEL W/CF1ILDRFN`S ARTWORK JUNE Z 200B �x It,6 x a or W x V4r GREENSCREEN PMEL MDO PLYV400D BACKERBOARD 4'X 8-BOARD WITH Ir X It MODULES Scale 1/2" 1-T PROJECT NUMBER 0803 4'SQ.STEEL POST 4"SQ.STEEL POST 4"SQ.STEEL POST WOOD BENCH SEE STRUCTURAL SELF TAPPING S FAINLESS STEEL TEN SCREW #5132A MOUNTING F7 �-7 V-7 Green Screen Mosaic 95132V MOUNTING CLIP GREEN SCREEN PANEL Wall -Details GREEN SCREEN PANEL 1-4r GREEN SCREEN POST MOUNITING DETAILS 05132V MOUNTING CLIP t ft'� Canopy Section Scale:1/2"al 1'4r Scale 3"=l'-V L3 ,2 PROJECT 15PEABODY STREET PARK Salem,MA City of Salem S.Inern City Hall 93 W..h,v.,� ad ,�Ini,MA 01970 P TEAM landworks �studlo­ 112 Snaminnui�MudioM Bosiod,MA U118 P.617.426,3030 F 617A263033 10 Derb,Sdamia,4th Floor Sailea.MV,01970 P 617.425.3030 F 617.426,3030 "M LANDSCAPE ARCHIMCT utile I 30saarderveat P,61 7.423.7200 F:6 7A2S,1414 lo Iff URBAN DESIGN Vine IM. 372 Merrimac Sftv� Neebur,,ort,MA 01W P.978.�,1428 1978 465 2640 �.viraassodstea nut CIVIL ENGINEER Simpson Gumpertz & Heger 41 Se,on Sri" Building 1,Suite 500 W.M...MA QZlW 781,907.000 Main 78tWTW09F. STRUCTURAL ENGINEER STAMP JUNE 2.2008 PRIDJECT NUMBER 0803 Green Screen Mosaic Wall -Vews Green Screen Mosaic Wall Perspective Vic.� L3 .3 PROJECT r CONCRETE-FILLED 15PEABODY STEEL PIPE DOLLARD PAINTED. CONCRETETO STREET PARK BE SET FLUSH WITH TOP Salem,MA I P,�87� OF PIPE(SMOOTH FINISH) Fled,remem re City of Salem CONCRETE PLAZA Sedem Csy Has 93 wusm� S.Wm,NA 01970 P:on 709006 k 4 4 TEAM L, ..works stu COMPACTED AGGREGATE 112�mut Aemue-Stuae as Ismerm.MA 021118 P 617 426 MW PRECAST RECYCLED GLASS PAVERS LONG HOWZONITAL REBAR F.61T 1 1 2%MODIFIED NEOPRENE TACKCOAT Z4 10 Derby Square,4m Floor 4 INOUS SETTING BED CAST IN PLACE CONCRETE PAVEMENT PROVIDE(4)#5 VERTICAL& Salem MAW970 I 24'LONGHOrdZONTALREBAR 2V LONG HORIZONTAL REBAR #3 TIES @ 1?D.C. Q� .1amlererks-etudle.. 6'COMPACTED GRAVEL COMPACTED AGGREGATIi BASE LANDSCAPE ARCHITIECT COMPACTED SUGGRADE COMPACTED SUBGRADE A utile 30 Summer Smeet Concrete Stool 90 Pwred Rubber Surface Secfion Scale:1. T-O' Coricreme Stool Glass Paver VMkay:Secficm Scalw.1--V-0` (3�, onavte Simi Q Coccrele Plaza:S� S�Ie.1. 1,-(r amemi,w Milo P:617.CM�72C(l F 617.4M.1414 COMPACTED SUBGRADE URBAN DESIGN �WsRnSaX6 - -- — — — — P 1� Vine ASSMATIES INC. Scale:I"=1'4r 3n Maur.Surma N."prl,MA 01W P 978 465 lQ8 F,978 455 2610 �Mneassrcialesret SV DIAMETER MOUNTING HaE FOR Ift DLk ANCHOR CIVIL ENGINEER Simpson Gumpertz & Heger T- RUJ141 semn Sbeed d.,1.Suft 50D Walffiam.MA 02453 781 W7 9030 Meer 781,907 9009 FU STRUCTURAL ENGINEER STAMP 11-r 1141' TZ JUNE 2.2008 OONCF ETE PLAZA PROJECT NUMBER 0803 k A ". Site Furnishings Details :1 �112:16V :A :10 1 Site Furnishings Details .11 M I I-1 I 1�1 I FI I I-- --I I I— I-- I /'Te� Ganne'T":Secdon/Plan Scaw:1, 1'-(r Bike Rack:S�/Plan Scale:1" T-U` Pod Climber:Soc#on Scale I"=1'4r L3 .4 PROJECT 15PEABODY STREET PARK Salem,MA TAT" City of Salem �rS C4 Hal S.W..MA 01970 =71,8040w P 9MJM.� TEA landworks -studio-] MSIWW�A. 51�ffi Boston,MA M118 P 6 7.,Ci63030 F.617426.=3 10 DerbY Square 4th Fkcr sewe,'"olm TALKTLBE P 617 426.3031) F 6 7AZ.� TW.P= �Wn�rt�. SIMI)EKINEBIFMAIIE UNDSCAPE ARCHIM� utile CABLECORE CAUES FINNGRADE P:�T�3.7200 F TQ3 1414 --SUPMPW URBAN DESIGN Vine ASSMAMS,INC. 372 Mernmac SUWA Newbar,raft,W 01950 P 978,465.1425 F:978 465� �nea.aes.net 1=12 CIIAL ENGINEER Simpson Gumpertz ,Al' 4 A 4 & Heger 41 Seon Shnat BUION 1,Suite Soo Wafthen,MA(OISI 781,9117.9000 M. 781.907.90A FO Talk Tube;Section Scale:1, V-v STRUCTURAL ENGINEER MUM STAMP S d.r��Cft� Section I Plan Scale:1" T-w Ca�e Clienber:PerSoecbve Section Plan Scale:V V-0' Z4� JUNE Z 2008 PROJECTNUMBER 08D3 3-4117 Site Furnishings Details 4'ANCH R BOLTS— !? Site Furnishings Details 1-100AWASM VSQUIRECONCRETESIU111 x D Itril'sSUPPLY Water Fwntain:Bad an I Plan Scale:I"=1'4r 13 Trash Can:Section/Plan Scale:1. 1.4 L3 .5