August 1, 2012
Salem Redevelopment Authority
120 Washington Street, 3"i Floor
Salem, MA 01970
Attn: Tom Daniel
RE: Front Street Parking Lot Redesign
Salem Redevelopment Authority Members,
The City of Salem would like to be placed on the August 8`h Salem Redevelopment Authority agenda to review a
redesign of the municipal parking lot located along Front Street. In an effort to complete this work expeditiously,
the City is requesting that the SRA grant the City approval of the project pending approval of the Design Review
Board. The project will be presented to the Design Review Board at their next meeting.
As part of the City's Comprehensive Parking Program study, Nelson/Nygaard recommended that the City hire an
engineer to determine whether the parking lot at the corner of Front Street and Lafayette Street could be more
effectively utilized. The existing parking lot contains 25 parking spaces with 13 adjacent parking spaces in the
Klopp Alley parking lot and 3 parking spaces along Lafayette Street. There is currently one entrance to the parking
lot from Lafayette Street. Vehicles must make a 3 point turn in order to exit the parking lot.
In December 2011, the City commissioned New England Civil Engineering to determine whether there were
options for optimizing the lot's parking spaces and create a better traffic flow. New England Civil Engineering
proposed an option which opens the Front Street parking lot into Klopp Alley, removing the curb barrier between
the two parking lots. The existing entrance to the Front Street parking lot will be closed off and vehicles for both
parking lots will enter from Lafayette Street. The parking spaces will also be restriped. The parking lot will have
the same footprint and impervious area as the existing design. However, these changes will allow the City to gain 9
new parking spaces.
The City hopes to complete the redesign this fall.
I look forward to presenting the project to you on August 8`h.
Sincerely,
Natalie Lovett
Community Development Planner
4A A�l
v�
w ON TU. Sr
NT STREET
r
9144 /� �� 1•
�7
a � J
i
1
KL Opp ALLEY LOT
�oRoxrv.h . .
U 30 15 C 30
aims Kby .
CITY OF SALEM,MASSACHUSETTS New England Civil
FRONT STREET-KLOPP ALLEY PAWNG LOT STUDY Engineering Corp.OPTIONA R.. obcro��� oar. . SALEM,MASSACHUSETTS REN90R5
Salem
Redevelopment
Authority
Design Review Board Proposal
August 22, 2012
Front Street and Klop Alley (Parking Lots): Discussion of proposed parking lot
modification
Proposal for August 22 DRB Meeting
The submission includes a letter and plans. The proposal is to remove the curb
barrier between the Front Street and Klop Alley parking lots, close off the current
access to the Front Street lot, and restripe the spaces. The new configuration
would be more efficient and add nine parking spaces.
Past SRA/DRB Action
On August 8, 2012, the SRA voted to approve subject to recommendations by
the DRB.
�CONUtTi(,,
CITY OF SALEM, MASSACHUSETTS
s
o' DEPARTMENT OF PLANNING AND
COMMUNITY DEVELOPMENT
KIMBERLEY DRISCOLL
MAYOR 120 WASHINGTON STREET ♦ SALEM,MASSACHUSETTS 01970
TELE:978-619-5685 ♦ FAX:978-740-0404
LYNN GoONIN DUNCAN,AICD
DIRECTOR
August 15, 2012
Design Review Board
120 Washington Street, 3`d Floor
Salem, MA 01970
Attn: Tom Daniel
RE: Front Street Parking Lot Redesign
Design Review Board Members,
The City of Salem would like to be placed on the August 22"d Design Review Board agenda to review a redesign
of the municipal parking lot located along Front Street. In an effort t0 complete this work expeditiously, the City
has already received conditional approval from the Salem Redevelopment Authority pending any conditions of the
Design Review Board.
As part of the City's Comprehensive Parking Program study, Nelson/Nygaard recommended that the City hire an
engineer to determine whether the parking lot at the corner of Front Street and Lafayette Street could be more
effectively utilized. The existing parking lot contains 25 parking spaces with 13 adjacent parking spaces in the
Klopp Alley parking lot and 3 parking spaces along Lafayette Street. There is currently one entrance to the parking
lot from Lafayette Street. Vehicles must make a 3 point tum in order to exit the parking lot.
In December 2011, the City commissioned New England Civil Engineering to determine whether there were
options for optimizing the lot's parking spaces and create a better traffic flow. New England Civil Engineering
proposed an option which opens the Front Street parking lot into Klopp Alley, removing the curb barrier between
the two parking lots. The existing entrance to the Front Street parking lot will be closed off and vehicles for both
parking lots will enter from Lafayette Street. The parking spaces will also be restriped. The parking lot will have
the same footprint and impervious area as the existing design. However, these changes will allow the City to gain 9
new parking spaces.
The City hopes to complete the redesign this fall.
Thank you for taking the time to review this application.
Sincerely,
yr �
Natalie Lovett
Community Development Planner
At
114
+ _ r
/^\ NT STREET
4444
'nP ALLEY LOT
_ 4
- 0
.. CITY OF SALEM,MASSACHUSETTS
New England Civil
FRONT STREET-KLOPP ALLEY PARKING LOT STUDY .Y w nv .s Engineering Corp. 1
e.. *w vrnvuu i
OPTION A wwvov wn o wo nog a.�.
a� '� �'�� � J SALEM MASSACHUSETTS
,uwa rnw � aE.+LOvS
A,
PARKING LOT RECONFIGURATION
EXISTING SPACES: 41 1 A PROPOSED CROSSWALK
PROPOSED SPACES: 50 STRIPING
EXISTING LINE STRIPING
FRONT ST.
/`
NT STREET
r rf)
y
a J
PROPOSED LINE STRIPING
KLOPP ALLEY LOT
I.PP0.0%IWC
30 15 0 30
cuvm
CITY OF SALEM,MASSACHUSETTS m. mwszz New England Civil
r p.t ¢moan
FRONT STREET-KLOPP ALLEY PARKING LOT STUDY 1^•^Ey Engineering Corp. 1
.^n un i. vn 191=2
OPTION A ...w by .xn xv. D..Otl. ova
} SALEM,MASSACHUSETTS
awa
by wrn asHsmxs