Loading...
THE RICHARD COMPANY DRB SIGN PERMIT 1994 i The Richard Company 16 Front St. g�a���� � � � ��v^ SALEM REDEVELOPMENT AUTHORITY RECEIVED - DESIGN REVIEW BOARD AUG 10 1994 SIGN APPLICATION SWOM 100ifing UGpt. Date of Application: August 9 , 1994 Applicant Name: Front at Assoc./The Richard Co. 744-0990 Phone i Location of Building: 16 Front Street Number Street Owner of Building: Cooley Investments Companies Sign Designer : Name ivevniiaSalem ompeo eirn l cany Sign Type (Check more than one if necessary) Wall/Facade Temporary Protecting Banner Window Mechanical Other Sign Illumination Internal Bare Bulb Indirect None Other Submission Requirements: All item must be .received two (2) days prior to meeting. (Please check ) 1. Detailed scale plan of sign X 2 . Color samples X 3. Letter type/style X 4 . Method of attachment x. 5. Method of lighting N/A 6. Location of sign on building: Drawing Polaroid x 7 . Fee $25 . 00 Approval Denied: Approval Recommended: Date Approved: EX/DRBSIGNS SalemEE Redevelopment 4-6900 Authority ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970 TELEPHONE 704.4580 SRA FEE SCHEDULE CAPITALIZATION LOAN Loan Application Fee: 75.00 Loan Origination Fee: 1 point (payable at closing) FACADE EASEMENTS Donation of Facade Easement 150 .00 DESIGN REVIEW Signs and Canopies 25.00 Design Review of Project with a total construction budget less than $10,000 25.00 Design Review of Project with a total construction budget greater than $10,000 but less than $50,000 50.00 Design Review of Project with a construction budget greater than $50,000 but less than $100, 000 150. 00 Design Review of Project with a total construction budget greater than $100,000 but less than $500,000 250 .00 Design Review of Project with a construction budget greater than $500, 000 500. 00 jm\srafee Saiem Redevelopment Authority ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970 TELEPHONE 744.4580 SIGN REVIEW PROCEDURE WITHIN THE URBAN RENEWAL AREA 1. Applicant completes Design Review Board sign application. 2 . Design Review Board (DRB) reviews submission and makes a recommendation to the Salem Redevelopment Authority ( SRA) . Applicant or sign maker should attend DRB meeting. 3 . SRA reviews submission for final approval. 4 . Following SRA approval, applicant obtains sign bond and will receive an approved Sign Permit from the City Planner . 5. Applicant takes approved Sign Permit to the Building Department for final approval. EX.\DRBSIGNS p w Ir -- -------- - - - - -r I i I ! I I I I . N PG I J .o PC i I I i I I I I I I �6•�� r Ls-lP A, vt+/ , i I i I ! I I Su tiJnP //� I ; le- s I I I - , I . I We are dedicated to I I I representing you in your I y -o " reaf estate transaction. �' I I I i i I I I I I ' I, I I I I i i I I I I I i I , I - I I i I I I I I I j I i - L IT I I I I I I I I ! , I I i I __